Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GRAY TELEVISION LICENSEE, LLC Doing Business As: WSFA |
Robert Folliard 4370 PEACHTREE ROAD, NE ATLANTA, GA 30319 United States |
+1 (540) 433-9191 | Robert.Folliard@gray.tv | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install TLS-V interim antenna and connect to interim line Remove and replace top mounted antenna and connect to existing transmission line. Install new main and backup transmitters. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Emergency Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HTEL | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | VAXTE-2R44 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.6 kW | |
Justification for New Transmitter | Existing Transmitter can not be retuned Manufacturers letter attached |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Auxiliary Transmitter Mask Filter |
Mask filter for the auxiliary transmitter |
Auxiliary Transmitter - De-Installation |
Auxiliary Transmitter - De-Installation |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Platinum | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | VAXTE-12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 9.6 kW | |
Justification for New Transmitter | Exiting transmitter can not be retuned Manufacturers letter attached Headroom analysis attached |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter - Transmitter Installation |
Primary Transmitter - Transmitter Installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Traveling Wave | |
ERP: | 31.6 kW | |
Manufacturer | ||
Model | RCA/TW-12A12 | |
Year | 1992 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 31.6 kW | |
Manufacturer | ||
Model | THV-10A8/VP-R 04 | |
Year | 2019 | |
Justification for New Antenna | Existing antenna can not be retuned V-pol upgrade not reimbursable |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 3 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 31.6 kW | |
Manufacturer | ||
Model | TLS-V4BB | |
Year | 2019 | |
Justification for New Antenna | Use as transition antenna to allow for removal of existing Ch 12 antenna and installation of new repack Ch 8 antenna. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2050 feet per run |
Name | Description |
---|---|
Utilize Existing Line - Mandatory Category due to LMS Bug |
Mandatory category because LMS requires a dollar amount in order to not throw an error. |
Primary Transmission Line - Sweep Test |
Primary Transmission Line - Sweep Test of pre-transition antenna to determine feasibility of use for post-transition channel |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2050 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1900 feet per run | |
Justification for New Transmission Line | Existing line determined not suitable for use on post-transition channel. |
Name | Description |
---|---|
Primary Transmission Line Additional Parts |
Primary Transmission Line Additional Parts |
Primary Transmission Line - Installation |
Primary Transmission Line - Installation |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1900 feet per run | |
Justification for New Transmission Line | interim line not required |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 31° 58' 29.0" N- |
Longitude (NAD83) | 086° 09' 44.1" W- | |
Overall Structure Height | 1935.02 feet | |
Support Structure Height | 1853.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 532.15 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WSFA, LLC | |
Date Constructed | 08/01/1977 |
Facility ID | Call Sign | Service |
---|---|---|
8649 | WZHT | FM |
73642 | WCOV-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | Pattern analysis Antenna Spec Transmitter Spec Building drawings Installation Supervision Accounting Internal Legal 399 Program Management | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 15 | |
Justification | Onsite supervision and engineering of transmission line installation, helicopter lifts, and main antenna changes |
Name | Description |
---|---|
RF Eng - Prepare and Review Reimbursement Form |
RF Eng - Prepare and Review Reimbursement Form |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Land Use for Antenna Removal and Replacement |
Land Use for Antenna Removal and Replacement |
Site Security |
Site Security |
Tower Site Prep |
Tower Site Prep |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $651,453.70 | $438,355.86 | N/A | $296,729.05 | N/A |
Total for all systems | $2,592,928.40 | $2,341,069.63 | N/A | $1,884,893.17 | N/A |
Primary Transmitter VAXTE-12 | $425,970.88 | $280,218.97 | $210,402.95 | ||
Primary Transmitter - Transmitter Installation | $2,505.17 | $2,505.17 | Please see WSFA Primary Transmitter - Transmitter Installation Budget Revision Justification Letter | $2,493.10 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
High VHF - Air Cooled Solid State Transmitter 6.5 . 12.5 kW | $331,500.00 | $188,898.09 | Please see GatesAir Quotes Q-66731 & upgrade quote Q-73822, less amount reimbursed in superseded category | $179,694.14 | N/A |
High VHF - Air Cooled Solid State Transmitter 5.9 kW | $28,215.71 | $28,215.71 | ***System Notice: Estimate adjusted and locked because line has been superseded.***GatesAir Quotes Q-66731 & upgrade quote Q-73822 Headroom analysis attached | $28,215.71 | N/A |
Auxiliary Transmitter VAXTE-2R44 | $225,482.82 | $158,136.89 | $86,326.10 | ||
Auxiliary Transmitter - De-Installation | $1,350.00 | $1,350.00 | Please see WSFA Auxiliary Transmitter De-Installation Budget Revision Justification Letter | $1,350.00 | N/A |
Auxiliary Transmitter Mask Filter | $7,882.82 | $7,882.82 | Please see WSFA GatesAir quote GA-00021705 plus actual tax on invoice US0335134 | $7,882.82 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
High VHF - Air Cooled Solid State Transmitter 1.1 . 4.4 kW | $152,500.00 | $88,304.07 | GatesAir Quote GA-00021705 attached. Please see file WSFA Backup TX.pdf | $77,093.28 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - Transmitter Installation | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
High VHF - Air Cooled Solid State Transmitter 6.5 . 12.5 kW | |
High VHF - Air Cooled Solid State Transmitter 5.9 kW | |
Auxiliary Transmitter - De-Installation | |
Auxiliary Transmitter Mask Filter | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
High VHF - Air Cooled Solid State Transmitter 1.1 . 4.4 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $387,528.40 | $364,228.40 | N/A | $296,940.75 | N/A |
Total for all systems | $2,592,928.40 | $2,341,069.63 | N/A | $1,884,893.17 | N/A |
Interim Antenna TLS-V4BB | $95,503.40 | $73,548.40 | $43,930.00 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $3,255.00 | Please see Dielectric order confirmation 184001 | $3,255.00 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $11,970.00 | Please see WSFA Dielectric quote 184001 | $4,189.50 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
High VHF - High Power Side Mount One Station horizontally polarized | $51,923.40 | $51,923.40 | Quote attached | $30,085.50 | N/A |
Primary Antenna THV-10A8/VP-R 04 | $292,025.00 | $290,680.00 | $253,010.75 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $4,910.00 | N/A |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | $7,600.00 | $6,585.00 | Please see WSFA Dielectric quote dated 3-9-17 | $3,292.50 | N/A |
High VHF - High Power Top Mount One Station elliptically or circularly polarized | $277,695.00 | $277,695.00 | Quote attached E-Pol premium not included in cost | $244,808.25 | N/A |
Actual Information Description | File Name |
---|---|
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
High VHF - High Power Side Mount One Station horizontally polarized | |
Sweep test of existing antenna | |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | |
High VHF - High Power Top Mount One Station elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $551,684.78 | $250,490.84 | N/A | $177,029.06 | N/A |
Total for all systems | $2,592,928.40 | $2,341,069.63 | N/A | $1,884,893.17 | N/A |
Interim Transmission Line | $269,800.00 | $43,913.72 | $43,913.72 | ||
Rigid Transmission Line - copper, 4 1/16" | $269,800.00 | $43,913.72 | New line primary line incorrectly entered as an interim line. | $43,913.72 | N/A |
Primary Transmission Line | $4,500.00 | $4,500.00 | $4,500.00 | ||
Primary Transmission Line - Sweep Test | $4,500.00 | $4,500.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Please see WSFA Primary Transmission Line - Sweep Test Budget Revision Justification Letter | $4,500.00 | N/A |
Primary Transmission Line | $277,384.78 | $202,077.12 | $128,615.34 | ||
Primary Transmission Line - Installation | $2,416.13 | $2,416.13 | Please see WSFA Primary Transmission Line Installation Budget Revision Justification Letter | $2,415.84 | N/A |
Primary Transmission Line Additional Parts | $5,168.65 | $5,168.65 | Please see Dielectric Order Confirmation 184001 (lines 5, 7, 8, 13, 14, 15, 16, 17, and 18) | $5,168.63 | N/A |
Rigid Transmission Line - copper, 4 1/16" | $269,800.00 | $194,492.34 | Please see Estimated Cost Justification WSFA-310-Primary Transmission Line - Rigid Copper V0 | $121,030.87 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 4 1/16" | |
Primary Transmission Line - Sweep Test | |
Primary Transmission Line - Installation | |
Primary Transmission Line Additional Parts | |
Rigid Transmission Line - copper, 4 1/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $663,280.01 | $923,864.53 | N/A | $883,659.52 | N/A |
Total for all systems | $2,592,928.40 | $2,341,069.63 | N/A | $1,884,893.17 | N/A |
Primary Tower TOWER | $663,280.01 | $923,864.53 | $883,659.52 | ||
Tall Tower (greater than 500') | $210,500.00 | $483,884.52 | Please see Estimated Cost Justification WSFA-410-Existing Primary Tower - Tower Rigging, Tall Tower V0 | $483,884.51 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | $112,450.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $7,800.00 | N/A | $5,145.00 | N/A |
Tower Helicopter Lift | $282,180.01 | $282,180.01 | Please see Estimated Cost Justification WSFA-410-Existing Primary Tower - Helicopter Lift v0 | $282,180.01 | N/A |
Actual Information Description | File Name |
---|---|
Tall Tower (greater than 500') | |
Minor tower reinforcement/modifications | |
Structural engineering tower load study for well documented tower | |
Tower Helicopter Lift |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $213,236.80 | $246,980.29 | N/A | $148,470.08 | N/A |
Total for all systems | $2,592,928.40 | $2,341,069.63 | N/A | $1,884,893.17 | N/A |
Outside Professional Services | $213,236.80 | $246,980.29 | $148,470.08 | ||
RF Eng - Prepare and Review Reimbursement Form | $61.60 | $61.60 | Please see WSFA RF Eng - Prepare and/or Review Form 399 Budget Revision Justification Letter | $61.60 | N/A |
Additional Field Engineering Service, 15 Days | $6,885.20 | $6,885.20 | Please see WSFA RF Eng - Additional Field Engineering Service Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $6,885.20 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $429.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,525.00 | Invoices received | $1,525.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $216.66 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $4,729.13 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $94,010.00 | $133,758.49 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $133,758.49 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $864.50 | N/A |
Actual Information Description | File Name |
---|---|
RF Eng - Prepare and Review Reimbursement Form | |
Additional Field Engineering Service, 15 Days | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | |
Attorney Fees - Prepare and File request for Special Temporary Authorization |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $125,744.71 | $117,149.71 | N/A | $82,064.71 | N/A |
Total for all systems | $2,592,928.40 | $2,341,069.63 | N/A | $1,884,893.17 | N/A |
Other Expenses | $125,744.71 | $117,149.71 | $82,064.71 | ||
Tower Site Prep | $24,493.00 | $24,493.00 | Please see WSFA Tower Site Prep Budget Revision Justification Letter | $20,668.00 | N/A |
Site Security | $1,980.00 | $1,980.00 | WSFA Site Security Budget Revision Justification Letter | $1,980.00 | N/A |
Land Use for Antenna Removal and Replacement | $5,000.00 | $5,000.00 | Please see WSFA Land Use for Antenna Removal and Replacement Budget Revision Justification Letter | $0.00 | N/A |
MVPD Notification of Channel Change | $2,017.00 | $2,017.00 | see Estimated Cost Justification WSFA-610-MVPD Notification v0 | $2,017.00 | N/A |
Develop and air announcement of upcoming channel change | $2,850.00 | $2,850.00 | estimate for on air rescan announcement production Quote attached | N/A | N/A |
Equipment Storage | $30,500.00 | $30,500.00 | Estimate for Dielectric on site antenna storage Dielectric letter attached | $7,090.00 | N/A |
Equipment Delivery and Handling Charges | $45,910.71 | $45,910.71 | see Estimated Cost Justification WSFA-610-Equipment Delivery and Handling v3 | $45,910.71 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,249.00 | $1,249.00 | please see Estimated Cost Justification WSFA-610-Disposal v0 | $1,249.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $200.00 | Please see WSFA Filing Fee STA Budget Justification Cover Letter | $200.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,950.00 | Group quote attached | $2,950.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Site Prep | |
Site Security | |
Land Use for Antenna Removal and Replacement | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Special Temporary Authorization request | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,592,928.40 | $2,341,069.63 | $1,884,893.17 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 03/29/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 03/29/2021 |