Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
LOUISIANA EDUCATIONAL TELEVISION AUTHORITY Doing Business As: Louisiana Public Broadcasting |
Donald R Ballard 7733 PERKINS RD BATON ROUGE, LA 70810 United States |
+1 (225) 767-4273 | dballard@lpb.org | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | 1.Install an interim antenna on channel 24 at our present licensed ERP or as close to it as we can obtain with our existing transmitter. 2.Purchase a replacement top mount antenna and line for the repack channel 17 with new mask filter and transmitter. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Used as current backup transmitter | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | LDU3A-8 (HX) | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 11.25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | CTX724 20kW UHF ATSC Transmitter | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 21.0 kW | |
Justification for New Transmitter | Existing Auxiliary Transmitter is channel-specific. Mask filter and cooling system blocks entrance. Footprint is too large, a smaller more compact transmitter is needed. Manufacturer is out of business as of Dec. 2019 (See Attachment ) |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Install of Aux Transmitter Power Conditioner |
Electricians to install Aux Transmitter Power Conditioner |
Aux Transmitter Site Demo Phase 1 |
Demo and Removal of existing Auxiliary Transmitter |
Shipping |
Shipping charge for transmitter from manufacturer to site only. |
Aux RF Components |
Components needed for transmitter install |
Aux Transmitter Power Conditioner |
Regulator for power conditioning at facility |
Electricians Phase 3 |
Demo of existing electrical and installation of new electrical for Auxiliary transmitter |
Transmitter Site Survey |
Initial transmitter site survey to define the scope of work for the transmitter install |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HU0015KAD | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 15 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | CTX728 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 23 kW | |
Justification for New Transmitter | Required transmitter to operate on repack channel. Existing mask filter can not be retuned. A lower gain antenna is required to keep the tower height in compliance with the FAA resulting in a higher required TPO than the existing transmitter. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 500.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 600.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Install equipment rental |
Heavy lift equipment rental. |
Primary Transmitter site prep |
Removal of primary transmitter and feeder lines |
Shipping and Handling |
Manufacturer delivery |
Additional Equipment |
Items needed to make new transmitters equivalent to existing transmitter equipment. |
Other - Continental Electronics |
36" inch legs for Heat Exchangers |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 350.0 kW | |
Manufacturer | ||
Model | TFU-47J | |
Year | 1978 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 280.0 kW | |
Manufacturer | ||
Model | ATC-BCE4280-V0-17 | |
Year | 2019 | |
Justification for New Antenna | Existing antenna can not be retuned by the manufacturer and must be replaced for the new repack channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Shipping |
Alive has put TBD on the quote. This is an arbitrary number |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 350.0 kW | |
Manufacturer | ||
Model | ATC-BCSE16M-U1 | |
Year | 2018 | |
Justification for New Antenna | KLTS-DT wishes to broadcast at close to full power while the main transmission system is replaced for the repack channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Shipping |
Alive has put TBD on the attached quote. This is an arbitrary number |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 3/4 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1316 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1316 feet per run | |
Justification for New Transmission Line | Existing line is not compatible with the repack channel. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 5 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1300 feet per run | |
Justification for New Transmission Line | KLTS-DT would like to remain on the air while the existing transmission system is replaced for the repack channel. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 32° 40' 40.1" N- |
Longitude (NAD83) | 093° 55' 30.7" W- | |
Overall Structure Height | 1080.04 feet | |
Support Structure Height | 1006.88 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 250.00 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | LOUISIANA EDUCATIONAL TELEVISION AUTHORITY DBA KLTS | |
Date Constructed | 05/26/1978 |
Facility ID | Call Sign | Service |
---|---|---|
4317 | KDAQ | FM |
Users |
---|
Bluebird Wirele |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 500 | |
Explanation | We will need outside assistance with project management due to insufficient staffing levels to support a major project. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 60 | |
Justification | We do not have comprehensive internal resources. Consulting RF Engineers are needed to meet the analytical, coordination, and FCC compliance needs of the station. |
Name | Description |
---|---|
Field Engineering Fees |
Comprehensive coverage verification via field study |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,593,707.00 | $2,538,707.00 | N/A | $1,875,572.14 | N/A |
Total for all systems | $5,405,254.00 | $5,242,696.00 | N/A | $3,250,313.06 | N/A |
Primary Transmitter CTX728 | $1,259,307.00 | $1,204,307.00 | $1,005,474.34 | ||
20 Ton system | $115,500.00 | $110,000.00 | This building is going to require adjustments to the environmental controls. Cooling is estimated to require 20 Tons of capacity and due to the location in a more northern latitude additional heating will also be required at this site for the winter. | $67,048.00 | N/A |
Other - Continental Electronics | $5,307.00 | $5,307.00 | N/A | N/A | N/A |
Additional Equipment | $50,000.00 | $50,000.00 | Items needed to make new transmitters equivalent to existing transmitter equipment. | $0.00 | This is the invoice for the Main Cooling system. The quote was submitted on 1/31/2020 |
Primary Transmitter site prep | $25,000.00 | $25,000.00 | N/A | $17,791.00 | KLTS Phase IV Transmitter removal invoice payment 1 of 2. Quote was filed earlier. |
Transmitter Install equipment rental | $22,000.00 | $22,000.00 | Rental of heavy duty equipment will be required to install the transmitter and the heat exchanger. | $14,135.34 | N/A |
Other -- Building Addition Size: 600.0 | $22,000.00 | $22,000.00 | N/A | N/A | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $50,500.00 | $48,000.00 | N/A | N/A | N/A |
Shipping and Handling | $22,000.00 | $22,000.00 | N/A | $6,500.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $900,000.00 | N/A | $900,000.00 | N/A |
Auxiliary Transmitter CTX724 20kW UHF ATSC Transmitter | $1,334,400.00 | $1,334,400.00 | $870,097.80 | ||
Transmitter Site Survey | $8,000.00 | $8,000.00 | N/A | $7,223.80 | N/A |
Electricians Phase 3 | $30,000.00 | $30,000.00 | N/A | $23,256.00 | Invoice for KLTS Phase III Transmitter Electrical Install. Payment 1 of 2. Quoted was filed earlier. |
Aux Transmitter Power Conditioner | $20,000.00 | $20,000.00 | N/A | $12,700.00 | This is the invoice for the Aux Transmitter Power Conditioner. The quote was filed first. |
Aux RF Components | $180,000.00 | $180,000.00 | N/A | $119,458.00 | KLTS-TV_Invoice_#02172002-IRO_Updated Price Change Letter_03-05-2020 |
Shipping | $15,000.00 | $15,000.00 | Shipping cost of Interim Transmitter from manufacturer to site. | N/A | N/A |
Aux Transmitter Site Demo Phase 1 | $25,000.00 | $25,000.00 | N/A | $9,134.00 | This is the invoice for KLTS Phase 1 removal. Payment 1 of 2. The quote was submitted first |
Install of Aux Transmitter Power Conditioner | $20,000.00 | $20,000.00 | N/A | $15,920.00 | KLTS Phase V Regulator Invoice payment 1 of 2. Quote was filed earlier |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $36,800.00 | N/A | $0.00 | These are quotes for the 3 phase/ 480v - 300KVA Transformer for KLTS Transmitter site. |
Switchgear - industrial 800 amp | $38,200.00 | $38,200.00 | N/A | $13,031.00 | Invoice for KLTS Phase II Switch Gear REP MDP Payment 1 of 2. Quote was filed first. |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,400.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $947,000.00 | N/A | $669,375.00 | N/A |
Actual Information Description | File Name |
---|---|
20 Ton system | |
Other - Continental Electronics | Information not provided. |
Additional Equipment | |
Primary Transmitter site prep | |
Transmitter Install equipment rental | |
Other -- Building Addition Size: 600.0 | Information not provided. |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Shipping and Handling | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
Transmitter Site Survey | |
Electricians Phase 3 | |
Aux Transmitter Power Conditioner | |
Aux RF Components | |
Shipping | Information not provided. |
Aux Transmitter Site Demo Phase 1 | |
Install of Aux Transmitter Power Conditioner | |
Transformer 3 phase/480v - 300 KVA | |
Switchgear - industrial 800 amp | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $631,370.00 | $602,500.00 | N/A | $285,285.00 | N/A |
Total for all systems | $5,405,254.00 | $5,242,696.00 | N/A | $3,250,313.06 | N/A |
Interim Antenna ATC-BCSE16M-U1 | $297,840.00 | $284,400.00 | $39,650.00 | ||
Shipping | $22,000.00 | $22,000.00 | Alive has put TBD on the attached quote. This is an arbitrary number that should cover the cost with some left over. | $0.00 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $0.00 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $13,000.00 | N/A | $2,150.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | $227,000.00 | $216,000.00 | N/A | $37,500.00 | N/A |
Primary Antenna ATC-BCE4280-V0-17 | $333,530.00 | $318,100.00 | $245,635.00 | ||
Shipping | $25,000.00 | $25,000.00 | Alive has put TBD on the quote that is attached. This is an arbitrary number that should cover the cost with value left over. | $24,835.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $11,700.00 | N/A | $8,300.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $4,500.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $275,000.00 | N/A | $208,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Shipping | Information not provided. |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | Information not provided. |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | |
Shipping | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $402,332.00 | $382,672.00 | N/A | $266,200.00 | N/A |
Total for all systems | $5,405,254.00 | $5,242,696.00 | N/A | $3,250,313.06 | N/A |
Interim Transmission Line | $136,500.00 | $130,000.00 | $66,500.00 | ||
Flexible Air Transmission Line - dielectric, 5" | $136,500.00 | $130,000.00 | N/A | $66,500.00 | N/A |
Primary Transmission Line | $265,832.00 | $252,672.00 | $199,700.00 | ||
Rigid Transmission Line - copper, 6 1/8" | $265,832.00 | $252,672.00 | N/A | $199,700.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 5" | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,288,800.00 | $1,242,867.00 | N/A | $772,916.20 | N/A |
Total for all systems | $5,405,254.00 | $5,242,696.00 | N/A | $3,250,313.06 | N/A |
Primary Tower GTOWER | $1,288,800.00 | $1,242,867.00 | $772,916.20 | ||
Tall Tower (greater than 500') | $210,500.00 | $217,867.00 | Please see attached tower crew quote. | N/A | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $0.00 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $1,000,000.00 | N/A | $772,916.20 | N/A |
Actual Information Description | File Name |
---|---|
Tall Tower (greater than 500') | Information not provided. |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Serious tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $447,495.00 | $434,950.00 | N/A | $40,051.72 | N/A |
Total for all systems | $5,405,254.00 | $5,242,696.00 | N/A | $3,250,313.06 | N/A |
Outside Professional Services | $447,495.00 | $434,950.00 | $40,051.72 | ||
Additional Field Engineering Service, 60 Days | $125,000.00 | $125,000.00 | Additional Field Engineering services required for Transmitter install and RF modifications. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | $806.40 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $57.60 | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | $1,141.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $240.00 | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $139.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $8,000.00 | due to the complexity of channel reassignment |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $78.00 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Project management of the transition | $79,000.00 | $75,000.00 | N/A | $24,088.72 | N/A |
Additional Field Engineering Service, 22 Days | $5,500.00 | $5,500.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $5,500.00 | N/A |
Field Engineering Fees | $84,200.00 | $84,200.00 | Professional Comprehensive coverage verification via a field study will be needed for new maximized power and coverage pattern. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 60 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
RF Exposure Measurements | Information not provided. |
Project management of the transition | |
Additional Field Engineering Service, 22 Days | |
Field Engineering Fees | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $41,550.00 | $41,000.00 | N/A | $10,288.00 | N/A |
Total for all systems | $5,405,254.00 | $5,242,696.00 | N/A | $3,250,313.06 | N/A |
Other Expenses | $41,550.00 | $41,000.00 | $10,288.00 | ||
MVPD Notification of Channel Change | $10,000.00 | $10,000.00 | N/A | $288.00 | N/A |
Develop and air announcement of upcoming channel change | $10,000.00 | $10,000.00 | N/A | $10,000.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
DTV Medical Facility Notification | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $5,405,254.00 | $5,242,696.00 | $3,250,313.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Donald Ray Ballard , Mr. . Television Manager 02/12/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Donald Ray Ballard , Mr. . Television Manager 02/12/2021 |