Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KMCE, INC. Licensee Doing Business As: KMCE, INC. |
135 Aviation Way #19 Watsonville, CA 95076 United States |
+1 (831) 724-0143 | manager@kmce.tv | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Bradley Jackson The Scotts Valley Group, Inc. DBA 'Marcom' |
Bradley Jackson PO Box 5275 Santa Cruz, CA 95063 United States |
+1 (831) 818-7841 | brad@mar-com.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Station will share a common transmitter room with FacID - 183829. Significant cost savings on this project will come from continuing use of existing major components such as existing Broadcast Antenna and RF Transmission Line. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UTX5KW | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | 7130 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | Station's Legacy Analog Transmitter is not supported, the Manufacturer is out of business and it will not accommodate Digital Transmission to satisfy this Re-Pack effort. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 25.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Mask Filter |
CH24 Full-Service Mask Filter will be necessary. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 8 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 806.00 MHz | |
ERP: | 15.0 kW | |
Manufacturer | Scala | |
Model | 4X2KBBU | |
Year | 2002 |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Name | Description |
---|---|
Azimuth and Mechanical Tilt Adjustments |
Station to reuse existing Broadcast Antenna and RF Transmission Line. Will require re-positioning on Tower Structure to accommodate the Parameters called-out in the Re-Pack Displacement CP. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 222 | |
Explanation | Station does not have the knowledge or qualified personnel necessary to undertake this project. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 15 | |
Justification | Engineer to be onsite to direct and complete successful work in relation to this project: Antenna Re-Positioning, Transmitter Installation, Electrical Transformer and all other tasks to meet the parameters of the Station's Displacement Construction Permit |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Mileage |
Mileage to from site |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $140,276.99 | $140,276.99 | N/A | $40,376.99 | N/A |
Total for all systems | $281,464.13 | $273,145.63 | N/A | $129,175.63 | N/A |
Primary Transmitter 7130 | $140,276.99 | $140,276.99 | $40,376.99 | ||
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | $5,750.00 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $650.00 | $650.00 | N/A | $0.00 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $25,550.00 | N/A | $0.00 | N/A |
Mask Filter | $6,376.99 | $6,376.99 | actual cost of mask filter. | $6,376.99 | Mask filter cost. |
UHF - Liquid Cooled Solid State Transmitter 1.8 kW | $97,700.00 | $97,700.00 | N/A | $28,250.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Building Site Survey/Installation | |
2" Rigid Conduit and Wiring (Cost per foot) | |
Transformer 3 phase/480v - 150 KVA | |
Mask Filter | |
UHF - Liquid Cooled Solid State Transmitter 1.8 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $14,230.00 | $14,230.00 | N/A | $8,500.00 | N/A |
Total for all systems | $281,464.13 | $273,145.63 | N/A | $129,175.63 | N/A |
Primary Antenna 4X2KBBU | $14,230.00 | $14,230.00 | $8,500.00 | ||
Azimuth and Mechanical Tilt Adjustments | $8,500.00 | $8,500.00 | Actual cost to change rotation | $8,500.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Azimuth and Mechanical Tilt Adjustments | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $117,248.50 | $109,095.00 | N/A | $71,625.00 | N/A |
Total for all systems | $281,464.13 | $273,145.63 | N/A | $129,175.63 | N/A |
Outside Professional Services | $117,248.50 | $109,095.00 | $71,625.00 | ||
Additional Field Engineering Service, 15 Days | $28,250.00 | $28,250.00 | actual hours | $28,250.00 | actual hours to complete repack |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $24,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,575.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,050.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,100.00 | N/A | $0.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $0.00 | N/A |
Form 399 assistance or other Program Management costs | $1,710.00 | $1,710.00 | N/A | $0.00 | N/A |
Project management of the transition | $23,421.00 | $43,375.00 | actual hours accumulated for project management | $43,375.00 | Actual hours of project management |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 15 Days | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Project management of the transition | |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,708.64 | $9,543.64 | N/A | $8,673.64 | N/A |
Total for all systems | $281,464.13 | $273,145.63 | N/A | $129,175.63 | N/A |
Other Expenses | $9,708.64 | $9,543.64 | $8,673.64 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,500.00 | $2,500.00 | N/A | $2,250.00 | N/A |
Equipment Delivery and Handling Charges | $2,950.00 | $2,950.00 | N/A | $2,500.00 | N/A |
Equipment Storage | $2,835.00 | $2,835.00 | Actual Cost | $2,835.00 | N/A |
Mileage | $1,088.64 | $1,088.64 | Mileage | $1,088.64 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Equipment Delivery and Handling Charges | |
Equipment Storage | |
Mileage |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $281,464.13 | $273,145.63 | $129,175.63 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |