Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UNIVISION LOCAL MEDIA, INC. Doing Business As: Univision Local Media, Inc. |
Christopher G. Wood 5999 Center Drive Los Angeles, CA 90045 United States |
+1 (310) 348-3600 | cwood@univision.net | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Theodore Stoner VP Distribution Technology Strategy Univision Management Company |
Theodore Stoner 9405 NW 41st Street Miami, FL 33178 United States |
+1 (513) 608-0308 | tstoner@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WRCF-CD will relocate to American Tower's Bithlo RT site, where it will share the transmitter room of WOTF-DT. All equipment downstream from the existing power distribution panels will be separate, not shared |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Pineapple |
Model | DTX-PRO | |
Year | 2013 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 1.5 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DTX-PRO | |
Year | 2013 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | TMU9-4 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.4 kW | |
Justification for New Transmitter | WRCF did replace its transmitter but is only eligible for reimbursement of the equivalent mask filter. Only the cost of the mask filter will be requested in reimbursement. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Mask Filter |
Reimbursable mask filter costs |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | PSILP16OI SPECIAL | |
Year | 2013 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP8L2-HSH-16 | |
Year | 2017 | |
Justification for New Antenna | Existing slot antenna is for channel 35 - will not work on channel 16 |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1212124 | |
Coordinates (NAD83) | Latitude (NAD83) | 28° 35' 12.6" N- |
Longitude (NAD83) | 081° 04' 57.5" W- | |
Overall Structure Height | 1682.07 feet | |
Support Structure Height | 1574.13 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 66.93 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Tower, LLC | |
Date Constructed | 03/18/2002 |
Facility ID | Call Sign | Service |
---|---|---|
5802 | WVEN-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Analysis |
ATC structural analysis fee |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 635 | |
Explanation | WRCF-CD does not have full-time local technical staff available to oversee and coordinate equipment replacement. Also, Please see the attached quote from Widelity. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Engineering Study for New Channel Assignment and Antenna Development |
An engineering study needed for the new channel assignment. |
Environmental Assessment - Tower Nest Review |
Environmental Assessment - Tower Nest Review |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
American Tower Admin Fee |
Bithlo tower is owned by American Tower - their standard repack is quoted as $9,480 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $237,027.05 | $6,815.71 | N/A | $6,815.71 | N/A |
Total for all systems | $747,857.05 | $275,980.33 | N/A | $248,194.42 | N/A |
Primary Transmitter DTX-PRO | $105,200.00 | $988.66 | $988.66 | ||
UHF and VHF - minor banding issues | $105,200.00 | $988.66 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $988.66 | Invoices match the estimated cost in this locked category. |
Primary Transmitter TMU9-4 | $131,827.05 | $5,827.05 | $5,827.05 | ||
Mask Filter | $5,827.05 | $5,827.05 | Although WRCF replaced its transmitter, only the cost of the mask filter will be requested in reimbursement: Please see Rohde & Schwarz quote 392433.0, plus sales tax of $349.05 and shipping of $108.00 | $5,827.05 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $0.00 | Although WRCF replaced its transmitter, only the cost of the mask filter will be requested in reimbursement | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF and VHF - minor banding issues | |
Mask Filter | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,030.00 | $24,899.34 | N/A | $21,589.82 | N/A |
Total for all systems | $747,857.05 | $275,980.33 | N/A | $248,194.42 | N/A |
Primary Antenna ALP8L2-HSH-16 | $33,030.00 | $24,899.34 | $21,589.82 | ||
Sweep test of existing antenna | $6,730.00 | $4,500.00 | N/A | $2,236.50 | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $20,399.34 | see Estimated Cost Justification WRCF-CD-210-Primary Antenna - UHF Lower Power Side Mount Class A v0 | $19,353.32 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $241,550.00 | $79,549.80 | N/A | $75,549.81 | N/A |
Total for all systems | $747,857.05 | $275,980.33 | N/A | $248,194.42 | N/A |
Primary Tower GTOWER | $241,550.00 | $79,549.80 | $75,549.81 | ||
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $6,590.60 | Please see the attached ATC invoice # 460207446 | $6,590.60 | N/A |
Structural Analysis | $4,750.00 | $4,750.00 | Please see the attached ATC invoice # 460207445 | $4,750.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $68,209.20 | Please see Estimated Cost Justification WRCF-CD-410-Existing Primary Tower - Tall Tower - Tower Rigging and Equipment v2 | $64,209.21 | N/A |
Actual Information Description | File Name |
---|---|
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Structural Analysis | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $213,775.00 | $151,840.48 | N/A | $142,239.08 | N/A |
Total for all systems | $747,857.05 | $275,980.33 | N/A | $248,194.42 | N/A |
Outside Professional Services | $213,775.00 | $151,840.48 | $142,239.08 | ||
Project management of the transition | $100,330.00 | $136,945.48 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $136,945.48 | Please see submitted invoices. |
Environmental Assessment - Tower Nest Review | $1,335.00 | $1,335.00 | Please see WRCF-CD Environmental Assessment - Tower Nest Review Budget Revision Justification Letter | $1,335.00 | N/A |
Engineering Study for New Channel Assignment and Antenna Development | $1,350.00 | $1,350.00 | Please see the combined justification document for WH Beam Associates, LLC - New Channel Assignment and Antenna Development | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $1,360.00 | Please see WRCF-CD A.H. Systems quote 200205-A2 | $1,360.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $2,000.00 | N/A | $1,326.60 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $2,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $1,000.00 | N/A | $750.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $1,350.00 | WRCF Justification Letter for WH Beam Associates, LLC - New Channel Assignment and Antenna Development | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $1,500.00 | N/A | $522.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Environmental Assessment - Tower Nest Review | |
Engineering Study for New Channel Assignment and Antenna Development | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $22,475.00 | $12,875.00 | N/A | $2,000.00 | N/A |
Total for all systems | $747,857.05 | $275,980.33 | N/A | $248,194.42 | N/A |
Other Expenses | $22,475.00 | $12,875.00 | $2,000.00 | ||
DTV Medical Facility Notification | $11,550.00 | $2,000.00 | Please see WRCF-CD RF Notifications Invoice 1316. | $2,000.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
American Tower Admin Fee | $9,480.00 | $9,480.00 | American Tower Repack Services Admin Fee | N/A | N/A |
Actual Information Description | File Name |
---|---|
DTV Medical Facility Notification | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
American Tower Admin Fee | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $747,857.05 | $275,980.33 | $248,194.42 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi , Franchi . VP Finance 01/26/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi , Franchi . VP Finance 01/26/2021 |