Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GOOD NEWS BROADCASTING NETWORK, INC. Doing Business As: GOOD NEWS BROADCASTING NETWORK, INC. |
Luke Skelton 15560 NORTH FRANK LLOYD WRIGHT BOULEVARD SUITE B4-5195 SCOTTSALE, AZ 85260 United States |
+1 (480) 888-6981 | LUKESKELTON@COX.NET | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Purchase and install transmitter, band pass filter, antenna and receive antenna equipment for displacement from analog channel 46 to digital channel 31. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UST-106A | |
Year | 2010 | |
Type | Other Type | |
Other Transmitter Type | analog tube | |
Power Capacity | .1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-200-D-FB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | .2 kW | |
Justification for New Transmitter | Analog transmitters can no longer be retuned to new frequencies. This is minimum output power replacement transmitter |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Retune temporary BPF |
Retuned temporary BPF as full service for displacement channel 31. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 2.5 kW | |
Manufacturer | ||
Model | PSILP8-46 OI | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 2.5 kW | |
Manufacturer | ||
Model | AL8-31 | |
Year | 2017 | |
Justification for New Antenna | Original antenna could not be retuned for new displacement frequency. This replacement antenna is only horizontally polarized, so not upgraded. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
Connection to feed line |
AL7E78-PS -- 7/8" EIA Flange Positive Stop for 1-5/8" AVA7-50 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Tower Install Services |
Site inspection, install antenna & feed line, ACS tower climber, Christian discount. |
Attorney Fees - Prepare and File request for Special Temporary Authorization -- RESUBMITTED |
Review, draft and edit request for STA and displacement application for K46IL-D. UPDATED 6/23/2020. UPDATED 12/8/2020. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Install Crew -- AZ Broadcast Srvc |
Invoice -- Arizona Broadcast Service |
Installation Crew -- RPD Electronics |
Invoices -- RPD Electronics |
DCI Receive BPF |
Invoice -- DCI for receive BPF |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,048.00 | $14,518.00 | N/A | $14,518.00 | N/A |
Total for all systems | $47,116.31 | $34,863.81 | N/A | $26,936.31 | N/A |
Primary Transmitter TRN-U-200-D-FB | $25,048.00 | $14,518.00 | $14,518.00 | ||
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | $24,300.00 | $13,770.00 | N/A | $13,770.00 | N/A |
Retune temporary BPF | $748.00 | $748.00 | N/A | $748.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | |
Retune temporary BPF |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,200.64 | $6,200.64 | N/A | $6,200.64 | N/A |
Total for all systems | $47,116.31 | $34,863.81 | N/A | $26,936.31 | N/A |
Primary Antenna AL8-31 | $6,200.64 | $6,200.64 | $6,200.64 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 2.5kW input, Horizontal | $5,858.29 | $5,858.29 | N/A | $5,858.29 | N/A |
Connection to feed line | $342.35 | $342.35 | N/A | $342.35 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 2.5kW input, Horizontal | |
Connection to feed line |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,382.50 | $11,660.00 | N/A | $3,987.50 | N/A |
Total for all systems | $47,116.31 | $34,863.81 | N/A | $26,936.31 | N/A |
Outside Professional Services | $13,382.50 | $11,660.00 | $3,987.50 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization -- RESUBMITTED | $962.50 | $962.50 | N/A | $962.50 | N/A |
Tower Install Services | $1,675.00 | $1,675.00 | N/A | $1,675.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $962.50 | N/A | $0.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,350.00 | N/A | $1,350.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization -- RESUBMITTED | |
Tower Install Services | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Form 399 assistance or other Program Management costs | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,485.17 | $2,485.17 | N/A | $2,230.17 | N/A |
Total for all systems | $47,116.31 | $34,863.81 | N/A | $26,936.31 | N/A |
Other Expenses | $2,485.17 | $2,485.17 | $2,230.17 | ||
Installation Crew -- RPD Electronics | $507.67 | $507.67 | N/A | $507.67 | N/A |
Install Crew -- AZ Broadcast Srvc | $255.00 | $255.00 | N/A | $0.00 | N/A |
DCI Receive BPF | $1,722.50 | $1,722.50 | N/A | $1,722.50 | N/A |
Actual Information Description | File Name |
---|---|
Installation Crew -- RPD Electronics | |
Install Crew -- AZ Broadcast Srvc | |
DCI Receive BPF |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $47,116.31 | $34,863.81 | $26,936.31 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lucas Skelton President 12/08/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lucas Skelton President 12/08/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lucas Skelton President 12/08/2020 |