FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
70612
Service:
LPA
Call Sign:
WAMS-LD
Channel:
29 (UHF)
File Number:
0000089727
FRN:
0018282269
Eligibility Status:
Eligible
Date Submitted:
12/15/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WEST CENTRAL OHIO BROADCASTING, INC.

Keith Wilkowski

405 Madison Avenue, Suite 2100

Toledo, OH 43604

United States

+1 (419) 724-7276 kwilkowski@blockcommunications.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Sam Hariton

Widelity

Sam Hariton

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan WAMS-LP is planning to upgrade its transmitter, upgrade its antenna, use an existing transmission line, and move to a different tower.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model FMS
Year 2004
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-4
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 2.88 kW
Justification for New Transmitter WAMS-LD cannot retune the transmitter due to manufacturer bankruptcy. WAMS-LD is not seeking reimbursement for the second exciter required for this new transmitter to function.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? No
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Rigid Conduit and Wiring Yes
Size 2 inches
Length 150.0 feet
Other Electrical Service Yes
Description Wire, breakers, switches, and lighting
HVAC Service Does the replacement transmitter require HVAC Service? No
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 240.0 square feet

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Primary Transmitter - Other Parts

Other parts required for operation of primary transmitter

Primary Transmitter Installation

Cost of installing primary transmitter

Primary Transmitter - Remote Control System

Primary Transmitter - Remote Control System

Transmitter-Demodulator

Transmitter-Demodulator

Primary Transmitter-Transmitter Building Permit

Local permit required for work on transmitter building

Mask Filter

Costs associated with mask filter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 4
Design power capacity in use 50.0 %
Lower Limit 470.00 MHz
Upper Limit 862.00 MHz
ERP: 5.3 kW
Manufacturer
Model 4X1KBBU
Year 2004

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
21476 WPNM-LD

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
ERP: 15.0 kW
Manufacturer
Model ATC-BCE512C1R-V3-29
Year 2018
Justification for New Antenna The previous antenna would not fit on the new tower.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Andrew
Type Flexible Foam
Diameter 7/8 inches
Number of parallel runs 1
Length 600 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
21476 WPNM-LD

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Primary Line - Other Parts

Parts required to reuse existing transmission line already present at new WAMS transmission location

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) No
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1222849
Coordinates (NAD83) Latitude (NAD83) 40° 23' 19.2" N-
Longitude (NAD83) 084° 21' 26.4" W-
Overall Structure Height 299.87 feet
Support Structure Height 299.87 feet
Ground Elevation Above Mean Sea Level (AMSL) 957.01 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner SBA Properties, LLC
Date Constructed 05/09/2001


Other Types of Users

Users
Sprint Cellular

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Tower mapping and report for structural engineer
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Structural Analysis

Tower Structural Analysis

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 254
Explanation WAMS-LP does not have sufficient resource capacity and expertise in house to handle all of the reimbursement activities necessary to facilitate on-time completion of the station's build. WAMS-LP will hire an outside firm to support WAMS-LP in these tasks.
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

FAA consultation

FAA consultation

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Receive Antenna

Receive Antenna required due to repack channel change

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $277,068.40 $277,068.40 N/A $117,769.70 N/A
Total for all systems $825,728.50 $876,037.75 N/A $208,821.80 N/A
Primary Transmitter ULXTE-4 $277,068.40 $277,068.40 $117,769.70
Mask Filter $11,445.02 $11,445.02 Please see GatesAir quote Q-80869 (Upgraded equipment cost).Like for like costs referenced on Q-89238. $7,019.58 x
Primary Transmitter-Transmitter Building Permit $348.33 $348.33 Please see SBA Network Services, LLC quotation dated 11-21-19, plus tax costs on invoice JC292890 $348.33 N/A
Transmitter-Demodulator $918.67 $918.67 Please see Heartland Video Systems quote WISQ63262 $918.67 N/A
Primary Transmitter - Remote Control System $8,971.85 $8,971.85 Please see Burke Technology quote 00003774, Heartland Video Systems quote WISQ63262, and Heartland Video Systems quote WISQ64073, plus freight and tax on Heartland invoice 71983 $4,338.57 N/A
Primary Transmitter Installation $30,423.75 $30,423.75 Please see GatesAir quote Q-80869 (Upgraded equipment cost). Like for like costs referenced on Q-89238. $22,712.91 N/A
Primary Transmitter - Other Parts $1,591.44 $1,591.44 Please see WAMS Heartland Video Systems quote WISQ64073, plus actual tax and shipping on invoice 71983 $0.00 N/A
Other -- Building Addition Size: 240.0 $25,125.24 $25,125.24 Estimated Cost Justification WAMS-LD-110-Primary Transmitter - Building Addition, 240 sq. ft. v0 $25,125.23 N/A
Other Electrical Service: Wire, breakers, switches, and lighting $20,384.30 $20,384.30 see Estimated Cost Justification WAMS-LD-110-Primary Transmitter - Other Electrical Service V0 $20,384.30 N/A
2" Rigid Conduit and Wiring (Cost per foot) $3,900.00 $3,900.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $38,200.00 N/A N/A N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $14,400.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 2.88 kW $121,359.80 $121,359.80 Please see GatesAir quote Q-80869 (Upgraded equipment cost) plus electrical costs. Like for like costs referenced on Q-89238. WAMS will not seek reimbursement for the second exciter on this quote. $36,922.11 N/A

Components

Actual Information Description File Name
Mask Filter

Component Description:
Mask Filter
Amount:
$416.63

Component Description:
Comb Invoice WAMS-LD-110-Primary Transmitter - Mask Filter Bauman Mechanical Inc. 23092
Amount:
$1,894.81

Component Description:
Mask Filter
Amount:
$1,468.77

Component Description:
Mask Filter
Amount:
$1,770.60

Component Description:
Mask Filter
Amount:
$1,468.77
Primary Transmitter-Transmitter Building Permit

Component Description:
Commercial Permit Application
Amount:
$348.33
Transmitter-Demodulator

Component Description:
Demodulator
Amount:
$918.67
Primary Transmitter - Remote Control System

Component Description:
Remote Control System
Amount:
$4,338.57

Component Description:
Invoice moved to correct budget category.
Amount:
N/A
Primary Transmitter Installation

Component Description:
Fabrication and installation, heat exchanger filter rack
Amount:
$800.62

Component Description:
Installation
Amount:
$13,493.39

Component Description:
Installation
Amount:
$4,209.45

Component Description:
Installation
Amount:
$4,209.45
Primary Transmitter - Other Parts

Component Description:
Invoice to be moved to correct budget category.
Amount:
N/A
Other -- Building Addition Size: 240.0

Component Description:
Mobilization and General Conditions
Amount:
$24,751.26

Component Description:
Additional grounding
Amount:
$373.97
Other Electrical Service: Wire, breakers, switches, and lighting

Component Description:
WAMS-LD-110-Primary Transmitter - Other Electrical Service
Amount:
$20,384.30
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp Information not provided.
Service entrance 3 phase/800 amp/208 volt Information not provided.
UHF - Liquid Cooled Solid State Transmitter 2.88 kW

Component Description:
Transmitter
Amount:
$12,974.99

Component Description:
Transmitter
Amount:
$3,749.68

Component Description:
Transmitter
Amount:
$7,222.45

Component Description:
Transmitter
Amount:
$12,974.99

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $16,676.00 $16,676.00 N/A $10,946.00 N/A
Total for all systems $825,728.50 $876,037.75 N/A $208,821.80 N/A
Primary Antenna ATC-BCE512C1R-V3-29 $16,676.00 $16,676.00 $10,946.00
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical $0.00 $0.00 N/A N/A N/A
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical $10,946.00 $10,946.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***Please see Alive Telecom antenna proposal ATC-BCE512C1R-V3-29 $10,946.00 N/A
Sweep test of transmission line and antenna $5,730.00 $5,730.00 N/A N/A N/A

Components

Actual Information Description File Name
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical Information not provided.
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical

Component Description:
Antenna
Amount:
$1,125.00

Component Description:
Antenna
Amount:
$4,600.00

Component Description:
Antenna
Amount:
$5,221.00
Sweep test of transmission line and antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,510.32 $2,510.32 N/A $2,510.32 N/A
Total for all systems $825,728.50 $876,037.75 N/A $208,821.80 N/A
Primary Transmission Line $2,510.32 $2,510.32 $2,510.32
Primary Line - Other Parts $2,510.32 $2,510.32 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $2,510.32 N/A

Components

Actual Information Description File Name
Primary Line - Other Parts

Component Description:
Connector 1-5/8"
Amount:
$1,520.65

Component Description:
Hoisting Grip
Amount:
$880.27

Component Description:
Ohio sales tax, 2-hole ground kit for 1-5/8" coax
Amount:
$109.40

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $479,690.00 $479,690.00 N/A $3,087.12 N/A
Total for all systems $825,728.50 $876,037.75 N/A $208,821.80 N/A
Primary Tower TOWER $479,690.00 $479,690.00 $3,087.12
Tower mapping and report for structural engineer $21,000.00 $21,000.00 N/A $0.00 N/A
Major tower reinforcement/modifications $400,000.00 $400,000.00 Per full-power catalog of costs (this cost is not listed in LPTV catalog), pending quote N/A N/A
Tower Rigging Short Tower (less than 500') $56,190.00 $56,190.00 N/A $587.12 N/A
Tower Structural Analysis $2,500.00 $2,500.00 Please see BLOCK WAMS-LD Structural Analysis Budget Justification Letter $2,500.00 N/A

Components

Actual Information Description File Name
Tower mapping and report for structural engineer Information not provided.
Major tower reinforcement/modifications Information not provided.
Tower Rigging Short Tower (less than 500')

Component Description:
Mount Antenna
Amount:
$587.12
Tower Structural Analysis

Component Description:
Location Name-Structural
Amount:
$2,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $42,386.50 $92,695.75 N/A $73,516.38 N/A
Total for all systems $825,728.50 $876,037.75 N/A $208,821.80 N/A
Outside Professional Services $42,386.50 $92,695.75 $73,516.38
FAA consultation $304.50 $304.50 Please see BLOCK WAMS-LD FAA Consultation Budget Justification Letter $304.50 N/A
Prepare/ Review 399 reimbursement form $1,710.00 $1,883.50 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $1,409.83 Please see submitted invoices.
Project management of the transition $26,797.00 $41,910.00 Please see WAMS-LP-LPTV strategic support quote $34,124.50 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A $854.80 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Perform engineering study for displacement application $1,800.00 $36,822.75 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $36,822.75 Please see submitted invoices.
Attorney Fees - Negotiation of lease and other matters for shared locations $3,262.50 $3,262.50 N/A N/A N/A
Prepare Form 601 $755.00 $755.00 N/A N/A N/A

Components

Actual Information Description File Name
FAA consultation

Component Description:
WAMS-LD-550-Attorney - FAA Consultation
Amount:
$304.50
Prepare/ Review 399 reimbursement form

Component Description:
Fees
Amount:
$424.33

Component Description:
Fees
Amount:
$985.50
Project management of the transition

Component Description:
Project Management
Amount:
$905.25

Component Description:
Project Management
Amount:
$4,580.90

Component Description:
Project Management
Amount:
$553.00

Component Description:
Project Management
Amount:
$126.45

Component Description:
Project management
Amount:
$6,139.55

Component Description:
Project Management
Amount:
$3,081.55

Component Description:
Project Management
Amount:
$2,508.90

Component Description:
Project management
Amount:
$4,448.70

Component Description:
Project Management
Amount:
$428.45

Component Description:
Project Management
Amount:
$2,120.60

Component Description:
Project Management
Amount:
$309.80

Component Description:
Project Management
Amount:
$907.55

Component Description:
Project Management
Amount:
$692.85

Component Description:
Project Management
Amount:
$7,320.95
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Consulting engineering services
Amount:
$854.80
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for displacement application

Component Description:
Consulting and Engineering services
Amount:
$637.50

Component Description:
Consulting engineering services
Amount:
$7,637.60

Component Description:
Consulting Engineering Services
Amount:
$307.90

Component Description:
Consulting engineering services
Amount:
$2,275.42

Component Description:
Consulting engineering services
Amount:
$1,270.35

Component Description:
Consulting engineering services
Amount:
$3,178.15

Component Description:
Consulting Engineering Services
Amount:
$883.90

Component Description:
Professional Services
Amount:
$959.10

Component Description:
Consulting engineering services
Amount:
$6,342.10

Component Description:
Professional Services
Amount:
$3,283.80

Component Description:
Consulting Engineering Services
Amount:
$4,997.33

Component Description:
Professional Services
Amount:
$3,134.50

Component Description:
Professional Services
Amount:
$1,915.10
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Prepare Form 601 Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $7,397.28 $7,397.28 N/A $992.28 N/A
Total for all systems $825,728.50 $876,037.75 N/A $208,821.80 N/A
Other Expenses $7,397.28 $7,397.28 $992.28
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
FCC Filing Fees - Form 2100 Major change CP application $4,960.00 $4,960.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
Receive Antenna $992.28 $992.28 Please see Heartland Video Systems quote WISQ64563-02, plus actual shipping and tax on invoice 72301 $992.28 N/A

Components

Actual Information Description File Name
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 Major change CP application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
Receive Antenna

Component Description:
4' Parabolic UHF Broadband
Amount:
$992.28

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $825,728.50 $876,037.75 $208,821.80

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Keith Wilkowski

VP, Legal & Governmental Affairs


12/15/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Keith Wilkowski

VP, Legal & Governmental Affairs


12/15/2020