Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
BUDD BROADCASTING CO., INC. |
4150 N. W. 93RD AVE GAINESVILLE, FL 32653 United States |
+1 (352) 371-7772 | BUDDMEDIA@BELLSOUTH.NET | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Robert Gehman Kessler and Gehman Associates, Inc. |
Robert Gehman 507 NW 60 St, Suite D Gainesville, FL 32607 United States |
+1 (352) 332-3157 | bob@kesslerandgehman.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace transmitter, mask filter and transmitting antenna using the existing line. Rigging to replace antenna. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Modified 5 kW Analog | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.3 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TV-1300-FA-U | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.3 kW | |
Justification for New Transmitter | To accommodate change in channel from 18 to 15 |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Install and Proof |
Install and Proof |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | SWLP16OI | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | SWEDL16EC/15 | |
Year | 2019 | |
Justification for New Antenna | To accommodate change from channel 18 to 15 |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1235223 | |
Coordinates (NAD83) | Latitude (NAD83) | 30° 16' 51.9" N- |
Longitude (NAD83) | 081° 34' 12.2" W- | |
Overall Structure Height | 1042.97 feet | |
Support Structure Height | 925.84 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 7.87 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SBA Towers II LLC | |
Date Constructed | 01/19/2006 |
Facility ID | Call Sign | Service |
---|---|---|
11909 | WFOX-TV | DTV |
73130 | WJCT | DTV |
39420 | WWRJ-LP | LPX |
35576 | WJAX-TV | DTV |
4754 | WJKF-CD | DTV |
19690 | WUJF-LD | LPD |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 250 | |
Explanation | Manage project equipment procurement, delivery and installation. Review progress, prepare and submit Form 387 quarterly, as well as three special FCC required reports | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 30 | |
Justification | Independent contractor to design, install and test the new transmitter and demolish the old transmitter. |
Name | Description |
---|---|
Other Engineering Services |
Engineering services not specifically listed in Form 399 |
Other Legal Services |
Other Legal Services not specifically listed in Form 399 |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Freight |
Freight |
Sales Tax |
Sales Tax |
FCC Filing Fees |
FCC Filing Fees |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $154,619.00 | $96,864.00 | N/A | $58,664.00 | N/A |
Total for all systems | $453,609.07 | $255,169.07 | N/A | $143,415.07 | N/A |
Primary Transmitter TV-1300-FA-U | $154,619.00 | $96,864.00 | $58,664.00 | ||
Switchgear - industrial 800 amp | $38,200.00 | $38,200.00 | N/A | N/A | N/A |
Install and Proof | $32,419.00 | $32,419.00 | See attached / uploaded PDF file titled "R Carr WUJX 4-20-20 v200504jgv1.pdf" | $32,419.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $26,245.00 | See attached / uploaded PDF file titled "RL Media 1909151 v200228jgv1.pdf" | $26,245.00 | N/A |
Actual Information Description | File Name |
---|---|
Switchgear - industrial 800 amp | Information not provided. |
Install and Proof | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $30,105.00 | $28,549.00 | N/A | $23,922.50 | N/A |
Total for all systems | $453,609.07 | $255,169.07 | N/A | $143,415.07 | N/A |
Primary Antenna SWEDL16EC/15 | $30,105.00 | $28,549.00 | $23,922.50 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $19,750.00 | $19,750.00 | See attached / uploaded PDF file titled "RL Media 1909151 v200228jgv1.pdf" | $19,750.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $4,174.00 | See attached / uploaded PDF file titled "John Wasson 01142020 v200528jgv1.pdf" | $4,172.50 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | |
Side Mount antenna brackets | Information not provided. |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $157,750.00 | $19,196.00 | N/A | $19,196.00 | N/A |
Total for all systems | $453,609.07 | $255,169.07 | N/A | $143,415.07 | N/A |
Primary Tower GTOWER | $157,750.00 | $19,196.00 | $19,196.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $19,196.00 | See attached / uploaded PDF file titled "Precision Twr 161021 v200602jgv2.pdf" | $19,196.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $86,782.50 | $86,207.50 | N/A | $37,280.00 | N/A |
Total for all systems | $453,609.07 | $255,169.07 | N/A | $143,415.07 | N/A |
Outside Professional Services | $86,782.50 | $86,207.50 | $37,280.00 | ||
Additional Field Engineering Service, 30 Days | $32,000.00 | $32,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $795.00 | See attached / uploaded PDF file titled "RL Media 2009101 v200928jgv1.pdf" | $795.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $5,180.00 | See attached / uploaded PDF files titled "RL Media 1804106 v200601jgv1.pdf", "RL Media 1807033 v200601jgv1.pdf", "RL Media 1910185 v200601jgv1.pdf" and "RL Media 1912114 v200601jgv1.pdf". | $5,180.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,295.00 | See attached / uploaded PDF file titled "RL Media 2001071 v200601jgv1.pdf" | $1,295.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $3,810.00 | $3,810.00 | See attached / uploaded PDF files titled "KGA 179-68 v200529jgv2.pdf" and "KGA 179-69 v200529jgv2.pdf" | $3,810.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $6,075.00 | The Estimated Cost includes Form 399 submissions including ongoing Actual Cost invoice prep and submission, and amendments as needed. | $6,075.00 | N/A |
Project management of the transition | $26,375.00 | $18,600.00 | Monroe Carr 10-09-2020 v201012jgv1 | $18,600.00 | N/A |
Other Legal Services | $2,050.00 | $2,050.00 | N/A | $1,525.00 | N/A |
Other Engineering Services | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 30 Days | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
Other Legal Services | |
Other Engineering Services | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $24,352.57 | $24,352.57 | N/A | $4,352.57 | N/A |
Total for all systems | $453,609.07 | $255,169.07 | N/A | $143,415.07 | N/A |
Other Expenses | $24,352.57 | $24,352.57 | $4,352.57 | ||
Freight | $1,422.87 | $1,422.87 | See attached / uploaded PDF file titled "RL Media 1909151 v200228jgv1.pdf" | $1,422.87 | N/A |
Sales Tax | $2,759.70 | $2,759.70 | See attached / uploaded PDF file titled "RL Media 1909151 v200228jgv1.pdf" | $2,759.70 | N/A |
FCC Filing Fees | $170.00 | $170.00 | See attached / uploaded PDF file titled "RL Media 2009101 v200928jgv1.pdf" | $170.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Freight | |
Sales Tax | |
FCC Filing Fees | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $453,609.07 | $255,169.07 | $143,415.07 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 12/01/2020 |