Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GRAY TELEVISION LICENSEE, LLC |
WHSV-TV 50 NORTH MAIN STREET HARRISONBURG, VA 22802 United States |
+1 (540) 433-9191 | robert.folliard@gray.tv | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity |
4031 University Dr Suite 100 Fairfax, VA, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WSHV will be purchasing an upgraded transmitter and antenna, while reusing the pre-displacement transmission line. The station will remain on the current tower. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Mxi 101 | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 50 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | EC702HP-BB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.7 kW | |
Justification for New Transmitter | The existing transmitter could not function on the new channel. WHSV - Signal Knob's new purchased main transmitter will be an upgrade from its old, existing transmitter. Please see narrative and justification letter for further explanation |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Splitter and other electrical expenses | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Primary Transmitter- Inside UHF RF |
Primary Transmitter- Inside UHF RF |
Primary Transmitter - Receiver |
Primary Transmitter - Receiver |
Primary Transmitter - UPS |
Primary Transmitter - UPS |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Leased | |
Owner | WVPY | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | PHP24C | |
Year | 1996 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | AL8WR-24-E-R | |
Year | 2019 | |
Justification for New Antenna | The pre-displacement antenna could not reach WHSV's new channel. The station acknowledges that the addition of V-Pol components is not reimbursable. Please see the narrative and justification letter for further information. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 38° 57' 37.21" N- |
Longitude (NAD83) | 078° 19' 51.6" W- | |
Overall Structure Height | 75.00 feet | |
Support Structure Height | 75.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4340.50 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WVPY | |
Date Constructed | 01/01/1996 |
Facility ID | Call Sign | Service |
---|---|---|
18862 | W255CK | FX |
18881 | W243AF | FX |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | WHSV-Signal Knob requires the aid of outside project management services to fulfill the requirements of the repack. WHSV-Signal Knob will hire an outside firm to facilitate and support WHSV-Signal Knob in these tasks to ensure a timely transition. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | Yes | |
Type | 7/13 GHz Licensed Part 74 |
Name | Description |
---|---|
TSL Monitoring |
Required due to layout changes at translator site |
IT Equipment |
Required due to layout changes at translator site |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $93,046.92 | $92,676.92 | N/A | $87,642.80 | N/A |
Total for all systems | $402,667.97 | $431,141.48 | N/A | $202,881.06 | N/A |
Primary Transmitter EC702HP-BB | $93,046.92 | $92,676.92 | $87,642.80 | ||
Primary Transmitter - UPS | $750.51 | $750.51 | Please see WHSV-TV1 Primary Transmitter-UPS Budget Revision Justification Letter | $750.50 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $83,630.00 | Please see Comark Proposal P#4093R1-EC702-180731 | $78,595.89 | N/A |
Other Electrical Service: Splitter and other electrical expenses | $131.00 | $131.00 | Please see WHSV-TV1 Primary Transmitter - Other Electrical Service Budget Revision Justification Letter | $131.00 | N/A |
Primary Transmitter- Inside UHF RF | $4,414.00 | $4,414.00 | Please see Hitachi Kokusai Electric Comark LLC proposal P#5108-WHSV-200414 | $4,414.00 | N/A |
Primary Transmitter - Receiver | $3,751.41 | $3,751.41 | Please see Hitachi Kokusai Electric Comark LLC Proposal P#3740-EC702-190220-R2, plus actual freight on invoice 13110 | $3,751.41 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - UPS | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Other Electrical Service: Splitter and other electrical expenses | |
Primary Transmitter- Inside UHF RF | |
Primary Transmitter - Receiver |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $81,358.80 | $82,028.80 | N/A | $72,810.86 | N/A |
Total for all systems | $402,667.97 | $431,141.48 | N/A | $202,881.06 | N/A |
Primary Antenna AL8WR-24-E-R | $81,358.80 | $82,028.80 | $72,810.86 | ||
Sweep test of transmission line and antenna | $5,730.00 | $6,400.00 | Please see DTVPros Quote JEHQ1515 for Sweep Test quote | $0.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $75,628.80 | $75,628.80 | Please see DTVPros quote JEHQ1514-01 | $72,810.86 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $74,140.00 | $94,300.00 | N/A | $14,350.00 | N/A |
Total for all systems | $402,667.97 | $431,141.48 | N/A | $202,881.06 | N/A |
Primary Tower TOWER | $74,140.00 | $94,300.00 | $14,350.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $79,950.00 | Please see SRI Proposal - Tower Rigging | N/A | N/A |
Tower Mapping | $9,250.00 | $9,250.00 | Please see WHSV-TV ERI proposal 20190321-031 | $9,250.00 | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $5,100.00 | see Estimated Cost Justification WHSV-TV1-410-Existing Primary Tower - Structural Analysis Study v1 | $5,100.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | Information not provided. |
Tower Mapping | |
Study needed for guyed or free-standing tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $93,927.00 | $92,865.15 | N/A | $26,885.15 | N/A |
Total for all systems | $402,667.97 | $431,141.48 | N/A | $202,881.06 | N/A |
Outside Professional Services | $93,927.00 | $92,865.15 | $26,885.15 | ||
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $7,122.50 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $6,247.50 | Please see submitted invoices. |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Project management of the transition | $26,797.00 | $20,412.65 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $20,412.65 | x |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $225.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Project management of the transition | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $60,195.25 | $69,270.61 | N/A | $1,192.25 | N/A |
Total for all systems | $402,667.97 | $431,141.48 | N/A | $202,881.06 | N/A |
Other Expenses | $60,195.25 | $69,270.61 | $1,192.25 | ||
IT Equipment | $895.25 | $895.25 | Please see Estimated Cost Justification WHSV-TV1-610-IT Equipment v0 | $895.25 | N/A |
TSL Monitoring | $1,595.00 | $1,595.00 | Please see Burk Technology Quote 00003514 | $297.00 | N/A |
New Point to Point Microwave System: 7/13 GHz Licensed Part 74 | $51,300.00 | $60,375.36 | Please see Heartland Video Systems Quote WISQ52594. The estimated cost above represents WHSV - Signal Knob's portion of the cost. | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
IT Equipment | |
TSL Monitoring | |
New Point to Point Microwave System: 7/13 GHz Licensed Part 74 | Information not provided. |
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $402,667.97 | $431,141.48 | $202,881.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 11/30/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 11/30/2020 |