Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Information not provided. |
ESRT TRP tower modification Part 1 |
- Component Description:
- TRP Logistic Planning. Hanson engineering was engaged late July 2015 to assist with leveling bids for RFS Antenna and releveling bids for the VHS and other UHF antennas
- Amount:
- $82,756.50
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to develop shutdown plan and strategy for TRP phasing, Reponded to question sfrom ESRT Executive team, and conducted preliminary surveys
- Amount:
- $4,499.30
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,580.34
- Component Description:
- ESB TRP Phase 1 CA Service
- Amount:
- $42,256.25
- Component Description:
- TT will provide construction administration services for Phase 1B of the TRP on a Not-to-Exceed basis.
- Amount:
- $5,467.50
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $11,610.00
- Component Description:
- Review of FM Aux antenna mounting design & details submitted by antenna manufacturer
- Amount:
- $4,900.00
- Component Description:
- TRP Phase 1b
- Amount:
- $500.00
- Component Description:
- Fred Geller Electrical will be supplying a site safety officer for ERI and Skanska's wor1c on TRP lb.
- Amount:
- $4,600.00
- Component Description:
- Jessica Spiegel 11/05/18-11/11/18 5TH AVE Univision - Meeting with team to review proposed tower work
- Amount:
- $337.50
- Component Description:
- TRP Phase 1
- Amount:
- $6,240.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $77,400.00
- Component Description:
- TRP Phase 1
- Amount:
- $11,040.00
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,762.91
- Component Description:
- A new chiller will be installed on the 81st Floor (east) setback roof.
- Amount:
- $12,000.00
- Component Description:
- TRP Phase 1
- Amount:
- $2,160.00
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,732,219.59
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
- Amount:
- $2,450.00
- Component Description:
- Services as part of the FM Aux Combiner Room build out; structural analysis of ERI's FM System.
- Amount:
- $3,499.00
- Component Description:
- Consulting re: filing status
- Amount:
- $112.50
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
- Amount:
- $6,220.00
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,454.57
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- Consulting
- Amount:
- $112.50
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
- Amount:
- $12,305.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing Updated
- Amount:
- $1,200.00
- Component Description:
- Filing fee
- Amount:
- $100.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months.
- Amount:
- $105.27
- Component Description:
- ESB TRP Phase 1 Final Structural Design Services
- Amount:
- $20,499.97
- Component Description:
- TRP - Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- Review of FM Aux antenna mounting design; Aux Combiner and AC equipment
- Amount:
- $9,807.50
- Component Description:
- Ariella Berliner 2/25/19-3/03/19 Conference call with project team to review filing strategy for LPC
- Amount:
- $225.00
- Component Description:
- "TRP Phase 1a - Abatement Scaffold
Engineering Filing-Updated"
- Amount:
- $350.00
- Component Description:
- Consultation re: filing
- Amount:
- $675.00
- Component Description:
- TRP Phase 1b, New PO to account for ERI's new invoice
- Amount:
- $26,275.00
- Component Description:
- Broadcasting-TRP Phase 1
- Amount:
- $2,835.00
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
- Amount:
- $8,215.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $34,921.00
- Component Description:
- PAL to conduct removal and disposal of ACPI on the 85th floor corridor.
- Amount:
- $3,048.50
- Component Description:
- Filing forms and structural letter of completion; inspection fee
- Amount:
- $2,500.00
- Component Description:
- Please deny this invoice
- Amount:
- N/A
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $154.80
- Component Description:
- FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- ESB TRP2 Additional Engineering Services
- Amount:
- $7,499.97
- Component Description:
- ESB TRP2 Construction Logistics/Phasing
- Amount:
- $25,000.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
- Amount:
- $4,500.00
- Component Description:
- ESB TRP Phase 1 Construction Support
- Amount:
- $10,108.75
- Component Description:
- Consultation re: filing status
- Amount:
- $900.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months.
- Amount:
- $35.09
- Component Description:
- ESB TRP2 Additional Engineering Services
- Amount:
- $13,500.02
- Component Description:
- TRP Logistics Planning
- Amount:
- $20,000.01
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $566,694.20
- Component Description:
- TRP Phase 1a
- Amount:
- $67,407.00
- Component Description:
- Code review and form filing
- Amount:
- $4,076.00
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $162,262.42
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $7,740.00
- Component Description:
- ESB TRP Phase 1 CA Service
- Amount:
- $811.25
- Component Description:
- RF safety services
- Amount:
- $1,745.81
- Component Description:
- on-site technical advisory services
- Amount:
- $43,890.00
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
- Amount:
- $9,677.50
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
- Amount:
- $225.00
- Component Description:
- ESB TRP Phase 1 Construction Support
- Amount:
- $2,157.50
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $109.50
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,651.13
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
- Amount:
- $16,159.28
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
- Amount:
- $4,410.00
- Component Description:
- TRP Logistics Planning - Thornton Tomaseti is engaged to provide construction logistics, phased engineering support, review applicable building codes as it relates to broadcast tower (222-F vs 222-G)
- Amount:
- $76.02
- Component Description:
- MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work
- Amount:
- $5,044.32
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $468.85
- Component Description:
- TRP Phase 1 , EBS shall provide testing services to determine the existence of ACM in the work areas identified by the construction documents.
- Amount:
- $6,635.60
- Component Description:
- TRP Phase 1B, EBS to provide ACM investigation and reporting for the TRP Phase 1b
- Amount:
- $3,435.91
- Component Description:
- TT will provide construction administration services for Phase 1B of the TRP on a Not-to-Exceed basis.
- Amount:
- $4,915.00
- Component Description:
- Univision-Empire Tower Lighting Mod
- Amount:
- $1,000.00
- Component Description:
- TRP Phase 1A, This PO represents the additional costs associated with CO ERI-004
- Amount:
- $444,146.86
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,379,584.86
- Component Description:
- ESB TRP Phase 1 CA Services
- Amount:
- $22,226.25
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,461,587.27
- Component Description:
- ESB TRP Phase 1 Construction Support
- Amount:
- $771.25
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $9,675.00
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to develop shutdown plan and strategy for TRP phasing,
- Amount:
- $16,366.90
- Component Description:
- Engineering services - 50% Deposit with order
- Amount:
- $5,125.00
- Component Description:
- construction admini services for Phase 1B, FM Aux antenna mounting design,structural support on the new FM Aux Combiner & AC equipment on 85th fl., new chillers on 81st fl. setback
- Amount:
- $5,932.50
- Component Description:
- TRP Phase 1B, EBS will collect and analyze samples of suspect ESB building materials
- Amount:
- $2,010.91
- Component Description:
- Filing fee
- Amount:
- $102.49
- Component Description:
- A new chiller will be installed on the 81st Floor (east) setback roof.
- Amount:
- $4,000.00
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $24,808.75
- Component Description:
- TRP- Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $23,393.25
- Component Description:
- Broadcasting-TRP Phase 1
- Amount:
- $2,351.00
- Component Description:
- TRP Phase 1
- Amount:
- $1,665.00
- Component Description:
- RF safety services
- Amount:
- $1,200.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $77,400.00
- Component Description:
- TRP - Phase 1B FM Aux/Broadcast Equipment
- Amount:
- $3,920.00
- Component Description:
- Review of FM Aux antenna mounting design; Combiner and AC equipment
- Amount:
- $4,410.00
- Component Description:
- Broadcasting - TRP Phase 1, Dielectric shall provide consulting services to support the TRP project, design/develop temporary antennas.
- Amount:
- $9,640.00
- Component Description:
- Fred Geller Electrical, Inc to perform electrical work per attached proposal
- Amount:
- $74,933.00
- Component Description:
- TRP- Phase 1B FM Aux/ Broadcast Equipment
- Amount:
- $23,355.25
- Component Description:
- TRP Phase 1
- Amount:
- $51,971.25
- Component Description:
- Broadcasting-TRP Phase 1
- Amount:
- $1,161.00
|
Serious tower reinforcement/modifications |
- Component Description:
- Smith and Fisher to provide additional RF Mesaurements associated with the Tower Reconfiguration Project Phase
- Amount:
- $11,520.36
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower reconfiguration project pertaining to the increased TV (UFH & VHF) scope.
- Amount:
- $12,153.90
- Component Description:
- Provide construction management
- Amount:
- $45,618.80
- Component Description:
- "Smith and Fisher to complete preparation of the engineering portion of the FCC Auxiliary applications for 19 FM Stations presently operating at the Empire State Building as part of
the TRP Phase 1b"
- Amount:
- $8,550.00
- Component Description:
- Consulting for a TV systems
- Amount:
- $25,055.00
- Component Description:
- Advent shall attend meetings related to TRP phasing, planning and logistics and provide consulting services through to September 30, 2015.
- Amount:
- $11,404.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $11,600.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $500.00
- Component Description:
- JLL will provide project management services, as outlined in the approved financial document forecasting the JLL PM team's services to maintain project delivery.
- Amount:
- $15,963.16
- Component Description:
- Provide construction management
- Amount:
- $45,928.19
- Component Description:
- Smith and Fisher to provide additional RF Mesaurements associated with the Tower Reconfiguration Project Phase
- Amount:
- $8,296.41
- Component Description:
- Smith and Fisher to complete preparation of the engineering portion of the FCC Auxiliary applications for 19 FM Stations presently operating at the Empire State Building as part of the TRP Phase 1b
- Amount:
- $15,350.00
- Component Description:
- Provide construction management
- Amount:
- $11,200.98
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower reconfiguration project pertaining to the increased TV (UFH & VHF) scope.
- Amount:
- $16,445.37
- Component Description:
- Tower Reconfiguration
- Amount:
- $62,152.74
- Component Description:
- Provide construction management
- Amount:
- $30,618.81
- Component Description:
- JLL will provide project management services, as outlined in the approved financial document forecasting the JLL PM team's services to maintain project delivery.
- Amount:
- $15,729.08
- Component Description:
- Smith and Fisher to provide additional RF Mesaurements associated with the Tower Reconfiguration Project
- Amount:
- $43,437.36
- Component Description:
- BBB shall prepare LPC submission documents
- Amount:
- $7,500.00
- Component Description:
- JLL 2013 Project Management Services
- Amount:
- $18,962.14
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $19,404.50
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $19,404.50
- Component Description:
- Smith & Fisher shall provide onging support for the TRP project
- Amount:
- $31,726.35
- Component Description:
- Smith & Fisher shall provide onging support for the TRP project
- Amount:
- $12,715.32
- Component Description:
- TRP Phase 1B
- Amount:
- $2,125.00
- Component Description:
- TRP Phase 1B
- Amount:
- $2,500.00
- Component Description:
- TRP Phase 1B
- Amount:
- $500.00
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower
- Amount:
- $6,100.00
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower reconfiguration project pertaining to the increased TV (UFH & VHF) scope.
- Amount:
- $4,631.96
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower reconfiguration project pertaining to the increased TV (UFH & VHF) scope.
- Amount:
- $2,681.96
- Component Description:
- Tower Reconfiguration
- Amount:
- $1,792.63
- Component Description:
- Tower Reconfiguration
- Amount:
- $7,600.00
- Component Description:
- Consulting for a TV systems
- Amount:
- $4,945.00
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower reconfiguration project pertaining to the increased TV (UFH & VHF) scope.
- Amount:
- $4,726.41
- Component Description:
- Smith & Fisher to provide assistance in the design of the tower reconfiguration project pertaining to the increased TV (UFH & VHF) scope.
- Amount:
- $7,821.72
- Component Description:
- JLL 2013 Project Management Services
- Amount:
- $4,213.84
- Component Description:
- Advent industrial shall provide precon services and subject matter expertise during the project review meetings
- Amount:
- $9,680.00
- Component Description:
- JLL 2013 Project Management Services
- Amount:
- $6,320.73
- Component Description:
- JLL will provide project management services, as outlined in the approved financial document forecasting the JLL PM team's services to maintain project delivery.
- Amount:
- $4,719.50
- Component Description:
- JLL will provide project management services, as outlined in the approved financial document forecasting the JLL PM team's services to maintain project delivery.
- Amount:
- $5,702.70
- Component Description:
- JLL will provide project management services, as outlined in the approved financial document forecasting the JLL PM team's services to maintain project delivery.
- Amount:
- $11,475.32
- Component Description:
- Provide construction management
- Amount:
- $34,727.22
- Component Description:
- Tower Reconfiguration
- Amount:
- $48,000.00
- Component Description:
- Broadcast Equipment Consulting
- Amount:
- $12,809.65
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $60,118.62
- Component Description:
- Processing and disbursement
- Amount:
- $569.50
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $31,500.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $1,170.00
- Component Description:
- MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work
- Amount:
- $450.43
- Component Description:
- Broadcast Equipment Consulting
- Amount:
- $21,525.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $333,377.71
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $14,700.00
- Component Description:
- TRP Phase 1
- Amount:
- $12,300.00
- Component Description:
- Smith and Fisher to provide RF and Power Density Consulting as part of the TRP Phase 1b
- Amount:
- $12,944.74
- Component Description:
- TRP Phase 1b
- Amount:
- $5,156.50
- Component Description:
- furnish and install a complete FM Aux system
- Amount:
- $82,609.17
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $2,450.00
- Component Description:
- Philips shall provide the light fixtures, data enablers, and necessary power cords for installing new LED fixtures on the Cocoon.
- Amount:
- $15,885.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $167,102.69
- Component Description:
- Expedited filing services for the structural work
- Amount:
- $3,365.00
- Component Description:
- UBSL to perform special inspections for the TRP Phase 1b FM Aux Combiner and antenna project.
- Amount:
- $28,550.00
- Component Description:
- TRP Phase 1
- Amount:
- $1,400.00
- Component Description:
- furnish and install a complete FM Aux system
- Amount:
- $21,880.28
- Component Description:
- Tower reconfiguration
- Amount:
- $10,036.81
- Component Description:
- Rizzo Group shall prvide code consultation, expedite filings and permits
- Amount:
- $1,587.50
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $260,634.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $2,045.83
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $6,674.34
- Component Description:
- 19698 Review plans and concepts
- Amount:
- $2,200.00
- Component Description:
- TRP Phase 1
- Amount:
- $48,700.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
- Amount:
- $5,578.00
- Component Description:
- TRP Phase 1
- Amount:
- $24,788.39
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $1,000.00
- Component Description:
- TRP Phase 1
- Amount:
- $930.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $112.50
- Component Description:
- AIC
- Amount:
- $24,950.00
- Component Description:
- TRP Phase 1
- Amount:
- $17,750.00
- Component Description:
- TRP Phase 1
- Amount:
- $17,450.00
- Component Description:
- Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system including, but not limited to, new FM Aux Combiner and FM Aux Antenna.
- Amount:
- $984,286.95
- Component Description:
- Turris engineering shall provide a visual inspection of tower, take measurements, visually record observations and submit a report of findings
- Amount:
- $4,950.00
- Component Description:
- Smith & Fisher shall provide onging support for the TRP project
- Amount:
- $32,566.11
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $232.50
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $1,840.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2.
- Amount:
- $3,045.66
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $4,000.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $10,000.00
- Component Description:
- Provide broadcast construction management
- Amount:
- $31,075.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $601,201.30
- Component Description:
- Broadcast tower and 85th floor, FGE to furnish all labor and material to complete electrical work.
- Amount:
- $5,966.35
- Component Description:
- MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $1,970.88
- Component Description:
- TRP Phase 1, EverGreene Architectural Arts shall furnish and install the current murals
- Amount:
- $12,286.54
- Component Description:
- ESP TRP Phase 1 Construction Support
- Amount:
- $24,306.25
- Component Description:
- Tower Reconfiguration
- Amount:
- $4,290.00
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $5,000.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $67,606.00
- Component Description:
- Processing and disbursement of funds
- Amount:
- $106,703.90
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $12,000.00
- Component Description:
- provide additional services preparing coordinated drawings for submission to Landmarks.
- Amount:
- $270.70
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $910.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $375.00
- Component Description:
- Processing and disbursement
- Amount:
- $300.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $225.00
- Component Description:
- Kevin Fisher of Smith & Fisher has provided consulting support for ESRT on the logistics of TRP Project.
- Amount:
- $19,500.00
- Component Description:
- Broadcast Equipment Consulting
- Amount:
- $3,410.00
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $3,574.95
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $4,700.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $12,078.63
- Component Description:
- TRP Phase 1
- Amount:
- $5,370.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $235,644.85
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $3,600.00
- Component Description:
- 19698 Review plans and concepts
- Amount:
- $1,700.00
- Component Description:
- Duggal to create replacement banner for State Bar and Grill to be attached on the new 33rd street side walk shed.
- Amount:
- $4,904.81
- Component Description:
- WSP to provide extended Construction Administration covering TRP Phase 1b - FM Aux project, covering MEP construction, and weekly meeting attendance.
- Amount:
- $6,500.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
- Amount:
- $1,763.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
- Amount:
- $1,763.00
- Component Description:
- 19698 Review plans and concepts
- Amount:
- $2,700.00
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $4,965.25
- Component Description:
- TRP Phase 1
- Amount:
- $8,988.95
- Component Description:
- TRP Phase 1
- Amount:
- $4,591.38
- Component Description:
- TRP Phase 1B, Flagg Waterproofing and Restoration to perform water proofing work in accordance with CRS documents SK-A
- Amount:
- $88,330.00
- Component Description:
- TRP Phase 1
- Amount:
- $25,000.00
- Component Description:
- Broadcasting - TRP
- Amount:
- $1,197.62
- Component Description:
- Smith and Fisher to provide RF and Power Density Consulting as part of the TRP Phase 1b
- Amount:
- $6,706.20
- Component Description:
- Processing and disbursement of funds
- Amount:
- $5,703.50
- Component Description:
- Tower Reconfiguration
- Amount:
- $2,500.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $1,125.42
- Component Description:
- Smith and Fisher to provide additional RF Mesaurements associated with the Tower Reconfiguration Project Phase
- Amount:
- $18,174.85
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $14,080.00
- Component Description:
- prepare LPC submission documents
- Amount:
- $150.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $537,064.89
- Component Description:
- TRP Phase 1a-Abatement Scaffold Engineering Filing-Updated, Fred Geller Electric (FGE) to provide all material and labor
- Amount:
- $25,962.33
- Component Description:
- Tower Reconfiguration
- Amount:
- $725.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $1,755.45
- Component Description:
- Tower Reconfiguration
- Amount:
- $13,000.00
- Component Description:
- TRP Phase 1B, Flagg Waterproofing and Restoration to perform water proofing work
- Amount:
- $63,774.00
- Component Description:
- FM Aux/Broadcast Equipment
- Amount:
- $8,550.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $25,000.00
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $4,253.61
- Component Description:
- WSP to perform additional design work associated as part of the FM Aux Combiner Room build out.
- Amount:
- $14,000.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $1,363.00
- Component Description:
- 19698 Review plans and concepts
- Amount:
- $2,950.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $4,542.06
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $4,515.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $1,126,291.37
- Component Description:
- TRP Phase 1
- Amount:
- $48,450.00
- Component Description:
- TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
- Amount:
- $1,750.00
- Component Description:
- 19698 Review plans and concepts
- Amount:
- $8,849.19
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $663,688.64
- Component Description:
- Processing and disbursement of funds
- Amount:
- $15,005.90
- Component Description:
- Smith and Fisher to provide ongoing support associated with the TRP phase 1 project
- Amount:
- $3,300.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $121.37
- Component Description:
- Tower reconfiguration
- Amount:
- $40,766.27
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $11,381.00
- Component Description:
- Preparation and filing of forms and structural letter of completion
- Amount:
- $1,526.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $232.00
- Component Description:
- TRP Phase 1a Construction Rev1
- Amount:
- $1,237.50
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $43,144.06
- Component Description:
- Smith & Fisher shall provide onging support for the TRP project
- Amount:
- $36,799.84
- Component Description:
- TRP Phase 1
- Amount:
- $14,867.55
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $28,000.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $150.00
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $4,900.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $6,080.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $9,900.00
- Component Description:
- Hanson to provide bid review including leveling, review meetings, and technical review.
- Amount:
- $41,653.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $18,000.00
- Component Description:
- TRP Phase 1
- Amount:
- $2,445.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $570.49
- Component Description:
- ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
- Amount:
- $4,250.00
- Component Description:
- WSP shall prepare filing documents for Phase1 and Phase 2. WSP shall provide construction admin services for the combiner room fit out on 85
- Amount:
- $7,350.00
- Component Description:
- BBB shall prepare LPC submission documents.
- Amount:
- $354.18
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $1,965.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $990.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $225.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $1,891.36
- Component Description:
- ACM Investigator Service of a New York City Certified Asbestos Investigator to perform an inspection related to structural work
- Amount:
- $375.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $4,120.00
- Component Description:
- UBSL to perform special inspections for the TRP Phase 1b FM Aux Combiner and antenna project.
- Amount:
- $8,500.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $31,370.00
- Component Description:
- 19698 review plans and concepts
- Amount:
- $16,675.01
- Component Description:
- UBSL to perform special inspections for the TRP Phase 1b FM Aux Combiner and antenna project.
- Amount:
- $900.00
- Component Description:
- Broadcasting - TRP
- Amount:
- $630.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $8,625.00
- Component Description:
- TRP Proposal 1
- Amount:
- $18.95
- Component Description:
- TRP Phase 1
- Amount:
- $20,000.00
- Component Description:
- ESB TRP Phase 1 Final Structural Design Services
- Amount:
- $22,000.01
- Component Description:
- TRP Phase 1A, This PO represents the additional cost associated with CO ERI-004
- Amount:
- $111,036.72
- Component Description:
- See Turris proposal 16-0620-R2 dated 6/20/16. This proposal includes services required to document where the existing transmission lines are located in the tower structure from levels 0 thru 4.
- Amount:
- $6,575.00
- Component Description:
- prepare LPC submission documents
- Amount:
- $7,149.62
- Component Description:
- TRP Phase 1
- Amount:
- $43,890.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $5,001.48
- Component Description:
- TRP Phase 1
- Amount:
- $53,000.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $2,205.00
- Component Description:
- TRP Phase 1
- Amount:
- $11,627.50
- Component Description:
- Fire Alarm Fee
- Amount:
- $840.00
- Component Description:
- TRP Phase 1
- Amount:
- $810.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $620.00
- Component Description:
- The Lighting Practice shall provide consulting services
- Amount:
- $3,737.50
- Component Description:
- "Smith and Fisher to provide RF and Power Density Consulting as part of the TRP Phase 1b
- Amount:
- $9,538.03
- Component Description:
- Philips shall provide the light fixtures, data enablers, and necessary power cords for installing new LED fixtures on the Cocoon.
- Amount:
- $63,540.00
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $3,219.64
- Component Description:
- Philips Lighting shall provide engineering services to design the LED system details for the Site Safety Enclosure and integrate into the lighting control system.
- Amount:
- $8,000.00
- Component Description:
- TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
- Amount:
- $1,445,945.00
- Component Description:
- TRP Phase 1b
- Amount:
- $11,500.00
- Component Description:
- TRP Phase 1, TRP Phase 1
- Amount:
- $12,286.54
- Component Description:
- TRP Phase 1
- Amount:
- $700.00
- Component Description:
- ESB Tower Reconfiguration- revision of construction documents
- Amount:
- $12,000.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $3,850.00
|
Structural engineering tower load study for well documented tower |
- Component Description:
- BROADCAST TOWER RECONFIGURATION PROJECT FM
- Amount:
- $15,750.00
- Component Description:
- Please Deny this invoice.
- Amount:
- N/A
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $27,500.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $3,140.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $55,000.00
- Component Description:
- Please Deny this invoice.
- Amount:
- N/A
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $7.92
- Component Description:
- Advent shall attend meetings related to TRP phasing
- Amount:
- $13,904.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $114,700.00
- Component Description:
- TRP Phase 1
- Amount:
- $2,640.00
- Component Description:
- Services to do a full-scale windload testing o
- Amount:
- $8,850.00
- Component Description:
- Advent shall provide pre-con services as directed by ESRT.
- Amount:
- $24,688.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $55,000.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $13,930.00
- Component Description:
- 17245 BROADCAST TOWER RECONFIGURATION PROJECT FM EMPIRE STATE BUILDING, NEW YORK, NY
- Amount:
- $3,500.00
- Component Description:
- TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
- Amount:
- $12,416.30
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $82,500.00
- Component Description:
- Advent shall provide pre-con services as directed by ESRT.
- Amount:
- $9,622.00
- Component Description:
- TRP Phase 1
- Amount:
- $19.37
- Component Description:
- 17245 BROADCAST TOWER RECONFIGURATION PROJECT FM EMPIRE STATE BUILDING, NEW YORK, NY
- Amount:
- $70.23
- Component Description:
- Structural study
- Amount:
- $20,000.00
- Component Description:
- TRP Phase 1
- Amount:
- $25,384.41
- Component Description:
- ESB TRP2 Additional Engineering Services
- Amount:
- $38.23
- Component Description:
- TRP Phase 1
- Amount:
- $7,300.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $7,050.00
- Component Description:
- Tower Reconfiguration
- Amount:
- $24,950.00
- Component Description:
- Advent shall attend meetings related to TRP phasing,
- Amount:
- $1,295.25
- Component Description:
- Tower Reconfiguration
- Amount:
- $25,870.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $41,880.00
- Component Description:
- Initial Structural Design Services
- Amount:
- $50.33
- Component Description:
- BROADCAST TOWER RECONFIGURATION PROJECT FM
- Amount:
- $15,750.00
- Component Description:
- Tower Reconfiguration - Structural Design
- Amount:
- $9,677.97
- Component Description:
- TRP Logistic Planning, Tom Silliman of ERI will attend a three day walk thru and meetings at ESB from 8/20 to 8/22.
- Amount:
- $9,038.00
- Component Description:
- Please deny this invoice.
- Amount:
- N/A
- Component Description:
- Structural Engineering Tower load study
- Amount:
- $19,998.00
- Component Description:
- TRP Phase 1
- Amount:
- $164.36
- Component Description:
- TRP Phase 1
- Amount:
- $21,697.79
- Component Description:
- RWDI will review the preliminary along-wind loading used to date based on the design information provided by architect and the engineer.
- Amount:
- $3,525.00
- Component Description:
- Please deny this invoice
- Amount:
- N/A
- Component Description:
- Advent industrial shall provide precon services and subject matter expertise during the project review meetings and at times provide engineering
- Amount:
- $7,788.00
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $27,500.00
- Component Description:
- RWDI will review the preliminary along-wind loading used to date based on the design information provided by architect and the engineer.
- Amount:
- $12,925.00
- Component Description:
- Univision Antenna Installation
- Amount:
- $14,999.98
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $10,470.00
- Component Description:
- Advent industrial shall provide precon services and subject matter expertise during the project review meetings and at times provide engineering
- Amount:
- $900.00
- Component Description:
- Advent industrial shall provide precon services
- Amount:
- $1,656.75
- Component Description:
- Advent industrial shall provide precon services
- Amount:
- $3,064.00
- Component Description:
- TRP Logistic Planning
- Amount:
- $3,622.00
- Component Description:
- TRP Phase 1
- Amount:
- $44.63
- Component Description:
- TRP Phase 1
- Amount:
- $82.91
- Component Description:
- structural review and analysis services
- Amount:
- $2,500.02
- Component Description:
- Aerodynamic Assessment of Antenna, Additional Iteration, Additional Iteration
- Amount:
- $10,800.00
- Component Description:
- Tower Load Study
- Amount:
- $1,326.76
- Component Description:
- Tower Reconfiguration (Design)
- Amount:
- $49,150.00
- Component Description:
- TT to provide additional structural engineering services as part of the TRP Phase 1B project.
- Amount:
- $7,500.00
- Component Description:
- Aerodynamic Assessment of Antenna, Additional Iteration, Attendance at a Meeting in New York
- Amount:
- $2,700.00
- Component Description:
- services to do a full-scale windload testing of the Temporary enclosure material
- Amount:
- $19,600.00
- Component Description:
- 4000 -- Aerodynamic Assessment of Antenna
- Amount:
- $15,000.00
|
ESRT TRP tower modification Part 2 |
- Component Description:
- TRP Phase la Construction - Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $2,766,733.63
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to develop shutdown plan and strategy for TRP phasing, Reponded to question sfrom ESRT Executive team
- Amount:
- $17,996.80
- Component Description:
- Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
- Amount:
- $3,780.00
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $510,059.00
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $17,047.12
- Component Description:
- CE002 - Fire Alarm not included in original scope
- Amount:
- $248,713.10
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $447,617.20
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $99,747.88
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $133,062.50
- Component Description:
- TRP Phase la Construction - Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,853,848.34
- Component Description:
- TRP Phase 2&3
- Amount:
- $2,730.00
- Component Description:
- Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system including, but not limited to, new FM Aux Combiner and FM Aux Antenna.
- Amount:
- $344,393.27
- Component Description:
- TRP Phase 2&3
- Amount:
- $1,200.00
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $518,020.40
- Component Description:
- Structural reinforcement services
- Amount:
- $4,533,753.80
- Component Description:
- Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
- Amount:
- $1,755,613.70
- Component Description:
- TPR Phase 2&3
- Amount:
- $630.00
- Component Description:
- Hanson provided services from 8/14 to 8/20/2015 to developshutdown plan and strategy for TRP phasing, Reponded to question sfrom ESRT Executive team, and conducted preliminary surveys
- Amount:
- $46,590.00
- Component Description:
- Skanska to perform all construction work, per overall Tower Reconfiguration Project contract and in accordance with, construction drawings associated with the construction of the FM Aux Combiner Room
- Amount:
- $71,567.78
|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
- Component Description:
- WFUT Remove Tower Mounted Antenna
- Amount:
- $465,918.75
- Component Description:
- Univision-Empire Tower Lighting Mod
- Amount:
- $3,000.00
- Component Description:
- Professional Services
- Amount:
- $4,000.00
- Component Description:
- Univision-Empire Tower Lighting Mod
- Amount:
- $1,000.00
- Component Description:
- Professional Services
- Amount:
- $1,013.71
- Component Description:
- Furnished Necessary Services
- Amount:
- $6,086.42
- Component Description:
- Re: Univision- ESB Tower Climb- Cancellation
- Amount:
- $4,512.00
- Component Description:
- Night tower Climb at Empire State Building
- Amount:
- $14,244.00
- Component Description:
- Engineering Services
- Amount:
- $5,125.00
|
Site Safety |
- Component Description:
- Ariella Berliner 8/12/19-8/18/19
- Amount:
- $112.50
- Component Description:
- ESB Univision Top Mount (18331)
- Amount:
- $23,750.00
|
Sidewalk Sheds, General Construction |
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $3,266.25
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $3,266.25
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $5,044.32
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $3,266.25
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $3,266.25
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $3,266.25
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $5,044.32
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $3,266.25
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $2,877.77
- Component Description:
- The monthly rent for the sidewalk bridge is being allocated to the TRP project.
- Amount:
- $37,690.41
- Component Description:
- BBB to coordinate filing of an amendment to the existing Tower Reconfiguration Project
- Amount:
- $475.00
- Component Description:
- BBB to coordinate filing of an amendment to the existing Tower Reconfiguration Project
- Amount:
- $2,875.42
- Component Description:
- TRP Phase 1B - FM Aux
- Amount:
- $17,945.00
- Component Description:
- "MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
- Amount:
- $5,044.32
- Component Description:
- BBB to coordinate filing of an amendment to the existing Tower Reconfiguration Project
- Amount:
- $6,180.17
- Component Description:
- Abatement Scaffold Engineering Filing-Updated
- Amount:
- $18,698.80
- Component Description:
- Please deny this invoice
- Amount:
- N/A
- Component Description:
- TRP Phase 1b
- Amount:
- $8,181.75
|