Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CALIFORNIA OREGON BROADCASTING, INC. |
Patricia C. Smullin PO Box 1489 MEDFORD, OR 97501 United States |
+1 (541) 779-5555 | cobiadmin@kobi5.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Displacement requires new transmitter/modulator. Antenna system will be shared with co-owned co-located station. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MFP1PAU | |
Year | 1996 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.20 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | 250WattPA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 0.28 kW | |
Justification for New Transmitter | Prior transmitter was frequency sensitive and unable to retune. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Modulator Exciter |
Single channel agile |
Mask Filter |
1 kW Full Service |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Frequency limited panel | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | 1X1KBBU | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 3 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
Design power capacity in use | 12.5 % | |
ERP: | 0.605 kW | |
Manufacturer | ||
Model | 750-10210 | |
Year | 2018 | |
Justification for New Antenna | Current antenna is frequency selective vertical slot. Replacement cost with same style antenna is approx $5800. It was more cost effective to use a combined panel array for this station and the co-owned, co-located FacID 183755 at $4000, saving 60%. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Power Dividers | Does the panel antenna require power dividers? | Yes |
Number of Power Dividers | 1 | |
Cable Harness | Does the panel antenna require cable harness? | Yes |
Number of Cable Harnesses | 3 |
RF Channel Number |
---|
33 |
20 |
Name | Description |
---|---|
Ridgeline Broadcast Services LLC |
Tower crew to add third panel .Replace mounting bracket, splitter and add third panel. |
Ridgeline Broadcast Services LLC |
Tower crew to remove current antenna and replace with new panel array antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Ridgeline Broadcast Services LLC |
Tower Services to remove current antenna and replace with new antenna array. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $30,600.00 | $17,110.00 | N/A | $12,905.50 | N/A |
Total for all systems | $70,740.00 | $35,588.05 | N/A | $22,981.47 | N/A |
Primary Transmitter 250WattPA | $30,600.00 | $17,110.00 | $12,905.50 | ||
Mask Filter | $2,800.00 | $2,800.00 | N/A | $2,095.50 | N/A |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | $24,300.00 | $10,810.00 | N/A | $10,810.00 | N/A |
Modulator Exciter | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Mask Filter | |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | |
Modulator Exciter | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,575.00 | $8,193.05 | N/A | $3,451.55 | N/A |
Total for all systems | $70,740.00 | $35,588.05 | N/A | $22,981.47 | N/A |
Primary Antenna 750-10210 | $25,575.00 | $8,193.05 | $3,451.55 | ||
Cable harness (each, for panel antenna system, if not included in antenna cost) | $3,000.00 | $300.00 | N/A | N/A | N/A |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $1,300.00 | $1,000.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $343.77 | N/A | $343.77 | N/A |
1 kW UHF Combiner (per channel) | $9,400.00 | $3,000.00 | N/A | N/A | N/A |
Ridgeline Broadcast Services LLC | $2,000.00 | $2,000.00 | N/A | $1,558.50 | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $5,250.00 | $1,549.28 | N/A | $1,549.28 | N/A |
Actual Information Description | File Name |
---|---|
Cable harness (each, for panel antenna system, if not included in antenna cost) | Information not provided. |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | Information not provided. |
Side Mount antenna brackets | |
1 kW UHF Combiner (per channel) | Information not provided. |
Ridgeline Broadcast Services LLC | |
UHF Broadband panel antenna (per panel), horizontally-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,925.00 | $9,550.00 | N/A | $6,079.42 | N/A |
Total for all systems | $70,740.00 | $35,588.05 | N/A | $22,981.47 | N/A |
Outside Professional Services | $13,925.00 | $9,550.00 | $6,079.42 | ||
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $450.00 | N/A | $450.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $4,600.00 | Fees charged are a flat fee for the displacement and are inclusive of the engineering study, STA prep and CP engineering. The antenna system needed to be modified due to a terrain shielding issue, so an additional engineering study had to modify the CP. | $4,600.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $1,500.00 | N/A | $746.25 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $600.00 | N/A | $283.17 | N/A |
Ridgeline Broadcast Services LLC | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $4,470.00 | $400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Perform engineering study for displacement application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Ridgeline Broadcast Services LLC | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $640.00 | $735.00 | N/A | $545.00 | N/A |
Total for all systems | $70,740.00 | $35,588.05 | N/A | $22,981.47 | N/A |
Other Expenses | $640.00 | $735.00 | $545.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $165.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $400.00 | Two legal STA's had to be filed due to a modification of the Construction Permit due to an unexpected terrain shielding issue. | $380.00 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Special Temporary Authorization request |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $70,740.00 | $35,588.05 | $22,981.47 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Karl D Sargent Director of Engineering 11/10/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Karl D Sargent Director of Engineering 11/10/2020 |