Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CBS BROADCASTING INC. Doing Business As: CBS BROADCASTING INC. |
Daniel G. Ryson 2020 M. St., NW - Licensing DEPT WASHINGTON, DC 20036 United States |
+1 (202) 457-4074 | dryson@cbs.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Daniel G. Ryson Director Spectrum Management ViacomCBS |
Daniel Ryson 2020 M. St., NW - Licensing DEPT Washington, DC 20036 United States |
+1 (202) 457-4074 | dryson@cbs.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Facility has dual broadband antennas and combiners. One transmitter and combiner will be pretuned to the post-transition channel and enabled at the appropriate time. The other transmitter and combiner will then be retuned. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Used When Main Site Isn't Available | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 10.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-60R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 38.0 kW | |
Justification for New Transmitter | Please see Attachment 68 for details. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1500.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Installation |
West Orange, NJ Transmitter Installation. |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Alternate Main | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXT-80 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 68.5 kW | |
Justification for New Transmitter | Harris cannot retune existing transmitter. New FCC allocation requires greater TPO than original to maintain proper coverage on new channel. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Install Electrical Power Distribution Including Panel Boards, Cable Tray, Cables, Recepacles, Transformers, and Grounding System. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Install Transmitter, Racks |
Installation of Transmitter Cabinets and Racks. |
Miscellaneous |
General Conditions, Contract Submittals, Documentation, Mobilization, Misc. Installation Materials, Hardware, and Field Testing. |
Electrical Accessories |
75 kVA 480v/208V Transformer, Parallel Surge Suppressor |
Closeout Documents |
Closeout documentation (warranties, certifications, as-built drawings, etc.) See Attachment 6, Schedule B, Item 3. |
Terminate and Test |
Other transmitter costs, delivery, handling, etc. See Attachment 6, Schedule D, Item 8. |
Cooling Pumps, Etc. |
Install cooling pumps, piping, hoses, heat exchangers. |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma | |
Year | 2009 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 42 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXT-80 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 68.5 kW | |
Justification for New Transmitter | Gates/Harris has stipulated that it cannot and will not attempt to retune any IOT transmitters |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Install Electrical Power Distribution Including Panel Boards, Cable Tray, Cables, Recepacles, Transformers, and Grounding System. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Cooling Pumps, Etc. |
Install cooling pumps, piping, hoses, heat exchangers. |
Install Transmitter, Racks |
Installation of Transmitter Cabinets and Racks. |
Closeout Documents |
Closeout documentation (warranties, certifications, as-built drawings, etc.) See Attachment 6, Schedule B, Item 3. |
Terminate and Test |
Other transmitter costs, delivery, handling, etc. See Attachment 6, Schedule D, Item 8. |
Miscellaneous |
General Conditions, Contract Submittals, Documentation, Mobilization, Misc. Installation Materials, Hardware, and Field Testing. |
Switchless Combiner |
Magic Tee Switchless Combiner |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Auxiliary (Backup) | |
Description of Use | When Main Site Isn't Available | |
Ownership | Leased | |
Owner | American Tower Corporation | |
Site | N/A | |
Is this antenna currently shared with any other stations? | Yes | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 5 | |
Number of Panels | 34 | |
Design power capacity in use | 7.0 % | |
Lower Limit | 506.00 MHz | |
Upper Limit | 725.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 2041.0 kW | |
Manufacturer | Dielectric | |
Model | TUD C5SP-10/34U-2-B | |
Year | 2006 |
Facility ID | Call Sign |
---|---|
47535 | WNBC |
22206 | WNYW |
73333 | WNJU |
74197 | WWOR-TV |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | No |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 1 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
36 |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Lease New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | When Primary Unavailable | |
Ownership | Leased | |
Owner | Durst Broadcasting | |
Site | N/A | |
Is this antenna currently shared with any other stations? | Yes | |
Is this antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels | 96 | |
Design power capacity in use | 75.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 656.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 241.0 kW | |
Manufacturer | ||
Model | PEP96L | |
Year | 2015 |
Facility ID | Call Sign |
---|---|
74197 | WWOR-TV |
22206 | WNYW |
47535 | WNBC |
73333 | WNJU |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | When Primary Unavailable | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | No | |
Ownership | Leased | |
Owner | Durst Broadcasting | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels/Bays | 96 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 656.00 MHz | |
Design power capacity in use | 75.0 % | |
Other Antenna Type | N/A | |
ERP: | 241.0 kW | |
Manufacturer | ||
Model | PEP-96L | |
Year | 2015 | |
Justification for New Antenna | Replaces Existing Auxiliary |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 1 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
36 |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Lease New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | Empire State Building | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Composite Antenna | |
ERP: | 284.0 kW | |
Manufacturer | ||
Model | ESBTUF80 | |
Year | 2008 |
Facility ID | Call Sign |
---|---|
74197 | WWOR-TV |
47535 | WNBC |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | No | |
Ownership | Leased | |
Owner | Durst Broadcasting | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Middle | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 5 | |
Number of Panels/Bays | 40 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 656.00 MHz | |
Design power capacity in use | 46.0 % | |
Other Antenna Type | N/A | |
ERP: | 455.0 kW | |
Manufacturer | ||
Model | PEP40E | |
Year | 2015 | |
Justification for New Antenna | Please see Statement. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 1 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
36 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Myat |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 165 feet per run |
Name | Description |
---|---|
Gas Barriers |
See Attachment 37. Gas barriers required to pressurize primary transmission line. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | When Main Site Unavailable | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 65 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | When Main Site Unavailable | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 65 feet per run | |
Justification for New Transmission Line | Incorrect segment lengths for channel 36. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 2 | |
Length | 165 feet per run | |
Justification for New Transmission Line | Additional line to feed new main and auxiliary, pre-transition combiner modules. |
Name | Description |
---|---|
Gas Barriers |
See Attachment 37. Gas barriers required to pressurize interim transmission line. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Auxiliary (Backup) | |
Description of Use | When Primary Unavailable | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1060205 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 48' 07.6" N- |
Longitude (NAD83) | 074° 14' 45.5" W- | |
Overall Structure Height | 339.89 feet | |
Support Structure Height | 299.87 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 622.04 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | American Tower, LLC | |
Date Constructed | 01/01/1974 |
Facility ID | Call Sign | Service |
---|---|---|
74197 | WWOR-TV | DTV |
22206 | WNYW | DTV |
73333 | WNJU | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1263701 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 42' 46.8" N- |
Longitude (NAD83) | 074° 00' 47.3" W- | |
Overall Structure Height | 1791.97 feet | |
Support Structure Height | 1334.63 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 14.11 feet | |
Structure Type | BTWR - Building with Tower | |
Tower Owner | Port Authority of New York and New Jersey | |
Date Constructed | 05/10/2013 |
Facility ID | Call Sign | Service |
---|---|---|
73333 | WNJU | DTV |
73356 | WPXN-TV | DTV |
47535 | WNBC | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Install Transmission Line |
Install transmission line between transmitters and combiner modules |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 250 | |
Explanation | Company lacks sufficient internal resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Electrical Mechanical Structural Engineers |
Designs for transmitter and load cooling, switch design, suspending lines, switches, etc. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,526,575.01 | $4,727,626.17 | N/A | $4,335,284.48 | N/A |
Total for all systems | $8,108,651.42 | $5,896,290.58 | N/A | $5,144,093.21 | N/A |
Primary Transmitter ULXT-80 | $2,437,998.15 | $2,129,418.48 | $2,083,999.76 | ||
Switchless Combiner | $125,248.15 | $125,248.15 | Magic Tee Switchless Combiner. Replaces existing pre-transition combiner. See Statement (Attachment 61) and quotation (Attachment 57). | $125,248.15 | N/A |
Miscellaneous | $85,250.00 | $85,250.00 | Please see attached Statement 3. | $80,393.78 | CBS seeks no reimbursement for some Prime Contractor costs and only 50% reimbursement for mobilization costs since some construction at 1WTC would be required even if there was no incentive auction repack. |
Terminate and Test | $12,250.00 | $12,250.00 | Other transmitter costs, delivery, handling, etc. Cost split 50/50 with Auxiliary (Alternate Main) Transmitter. See Attachment 6, Schedule D, Item 8 and Statement 3. | $9,262.50 | N/A |
Closeout Documents | $4,750.00 | $4,750.00 | Closeout documentation (warranties, certifications, as-built drawings, etc.). Cost Split 50/50 with Auxiliary (Alternate Main) Transmitter. See Attachment 6, Schedule B, Item 3 and Statement 3. | $4,750.00 | N/A |
Install Transmitter, Racks | $52,500.00 | $52,500.00 | Please see attached statement. | $38,625.00 | N/A |
Other Electrical Service: Install Electrical Power Distribution Including Panel Boards, Cable Tray, Cables, Recepacles, Transformers, and Grounding System. | $70,000.00 | $70,000.00 | Please see attached Statement 3. | $66,500.00 | N/A |
Cooling Pumps, Etc. | $89,000.00 | $89,000.00 | Please see attached statement. | $68,800.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW | $1,999,000.00 | $1,690,420.33 | Please see Statement and Attachment 2. | $1,690,420.33 | N/A |
Auxiliary Transmitter ULXTE-60R37 | $1,759,475.00 | $709,677.14 | $419,422.89 | ||
Transmitter Installation | $223,875.00 | $223,875.00 | Please see attached statement. | N/A | N/A |
Other -- Building Addition Size: 1500.0 | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $425,802.14 | Includes Transmitter, Mask Filter System, RF Accessories, Electrical, and Installation & Proof. Excludes shipping and tax, listed separately. Please see Attachment 5. | $419,422.89 | N/A |
Auxiliary Transmitter ULXT-80 | $2,329,101.86 | $1,888,530.55 | $1,831,861.83 | ||
Cooling Pumps, Etc. | $89,000.00 | $89,000.00 | Please see attached statement. | $84,550.00 | N/A |
Terminate and Test | $12,250.00 | $12,250.00 | Other transmitter costs, delivery, handling, etc. Cost split 50/50 with Primary Transmitter. See Attachment 6, Schedule D, Item 8 and Statement 3. | $9,262.50 | N/A |
Closeout Documents | $4,750.00 | $4,750.00 | Closeout documentation (warranties, certifications, as-built drawings, etc.). Cost Split 50/50 with Primary Transmitter. See Attachment 6, Schedule B, Item 3 and Statement 3. | $4,750.00 | N/A |
Electrical Accessories | $16,351.86 | $16,351.86 | Please see quotations provided as Attachments 48 & 49. Site Digital Network Wiring Hardware. | $16,351.86 | N/A |
Miscellaneous | $85,250.00 | $85,250.00 | Please see attached Statement 3. | $80,393.78 | CBS seeks no reimbursement for some Prime Contractor costs and only 50% reimbursement for mobilization costs since some construction at 1WTC would be required even if there was no incentive auction repack. |
Install Transmitter, Racks | $52,500.00 | $52,500.00 | Please see attached statement. | $38,625.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW | $1,999,000.00 | $1,558,428.69 | Please see Quotes provided as Attachments 32, 33, and 35 plus Invoices for freight (see Attachment 45) and Sales Tax (Attachment 46) for some items shipped to a staging location in nearby, taxable New Jersey. | $1,558,428.69 | N/A |
Other Electrical Service: Install Electrical Power Distribution Including Panel Boards, Cable Tray, Cables, Recepacles, Transformers, and Grounding System. | $70,000.00 | $70,000.00 | Please see attached Statement 3. | $39,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Switchless Combiner | |
Miscellaneous | |
Terminate and Test | |
Closeout Documents | |
Install Transmitter, Racks | |
Other Electrical Service: Install Electrical Power Distribution Including Panel Boards, Cable Tray, Cables, Recepacles, Transformers, and Grounding System. | |
Cooling Pumps, Etc. | |
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW | |
Transmitter Installation | Information not provided. |
Other -- Building Addition Size: 1500.0 | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Cooling Pumps, Etc. | |
Terminate and Test | |
Closeout Documents | |
Electrical Accessories | |
Miscellaneous | |
Install Transmitter, Racks | |
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW | |
Other Electrical Service: Install Electrical Power Distribution Including Panel Boards, Cable Tray, Cables, Recepacles, Transformers, and Grounding System. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $266,060.00 | $320,646.00 | N/A | $149,962.00 | N/A |
Total for all systems | $8,108,651.42 | $5,896,290.58 | N/A | $5,144,093.21 | N/A |
Primary Antenna PEP40E | $90,930.00 | $120,248.00 | $74,981.00 | ||
Adding a module to existing combiner (without antenna) | $84,200.00 | $113,848.00 | Modify and Retune Combiner. See Quotes in Attachment 62A divided by two. The other half is shown under the 1WTC auxiliary antenna section. | $74,981.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power Top Mount Five Station broadband panel antenna elliptically or circularly polarized | $0.00 | $0.00 | Using Existing Antenna. | N/A | N/A |
Auxiliary Antenna TUD C5SP-10/34U-2-B | $84,200.00 | $80,000.00 | $0.00 | ||
Adding a module to existing combiner (without antenna) | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Auxiliary Antenna PEP-96L | $90,930.00 | $120,398.00 | $74,981.00 | ||
Adding a module to existing combiner (without antenna) | $84,200.00 | $113,848.00 | Modify and Retune Combiner. See Quote in Attachment 62 divided by two. The other half is shown under the 1WTC main antenna section. | $74,981.00 | N/A |
UHF - High Power, Side Mount, broadband panel, 96 bay,, 241 kW input, elliptically or circularly polarized | $0.00 | $0.00 | Using Existing Antenna | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,550.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Adding a module to existing combiner (without antenna) | |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount Five Station broadband panel antenna elliptically or circularly polarized | Information not provided. |
Adding a module to existing combiner (without antenna) | Information not provided. |
Adding a module to existing combiner (without antenna) | |
UHF - High Power, Side Mount, broadband panel, 96 bay,, 241 kW input, elliptically or circularly polarized | Information not provided. |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $159,113.41 | $211,325.41 | N/A | $196,397.95 | N/A |
Total for all systems | $8,108,651.42 | $5,896,290.58 | N/A | $5,144,093.21 | N/A |
Interim Transmission Line | $138,826.71 | $191,688.71 | $189,241.25 | ||
Rigid Transmission Line - copper, 8 3/16" broadband | $131,670.00 | $184,532.00 | Replace Widelity Cost with Estimated and Actual Costs. See Attachment 26 plus shipping from Attachments 38, 39, and 64. Transmission line includes many custom length cut sections, elbows, etc. due to being used within a building. | $182,084.54 | N/A |
Gas Barriers | $7,156.71 | $7,156.71 | Required to pressurize interim transmission line. See Quote and Invoice (Attachment 37B) which includes shipping. This cost is divided 50/50 between primary and interim transmission line cost categories. | $7,156.71 | N/A |
Primary Transmission Line | $7,156.70 | $7,156.70 | $7,156.70 | ||
Gas Barriers | $7,156.70 | $7,156.70 | Required to pressurize interim transmission line. See Quote and Invoice (Attachment 37B) which includes shipping. This cost is divided 50/50 between primary and interim transmission line cost categories. | $7,156.70 | N/A |
Auxiliary Transmission Line | $13,130.00 | $12,480.00 | $0.00 | ||
Rigid Transmission Line - copper, 6 1/8" | $13,130.00 | $12,480.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 8 3/16" broadband | |
Gas Barriers | |
Gas Barriers | |
Rigid Transmission Line - copper, 6 1/8" | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $612,200.00 | $107,000.00 | N/A | $101,650.00 | N/A |
Total for all systems | $8,108,651.42 | $5,896,290.58 | N/A | $5,144,093.21 | N/A |
Primary Tower BTWR | $528,000.00 | $107,000.00 | $101,650.00 | ||
Install Transmission Line | $107,000.00 | $107,000.00 | See Attachment 6, Schedule D, Item 4. | $101,650.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $0.00 | Using Existing Antenna. | N/A | N/A |
Auxiliary Tower LTOWER | $84,200.00 | $0.00 | $0.00 | ||
Short Tower (less than 500') | $84,200.00 | $0.00 | Using Existing Antenna. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Install Transmission Line | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | Information not provided. |
Short Tower (less than 500') | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $127,712.00 | $123,542.00 | N/A | $47,417.00 | N/A |
Total for all systems | $8,108,651.42 | $5,896,290.58 | N/A | $5,144,093.21 | N/A |
Outside Professional Services | $127,712.00 | $123,542.00 | $47,417.00 | ||
Electrical Mechanical Structural Engineers | $44,542.00 | $44,542.00 | Please see Attachment 22, 28, and 28A. | $44,542.00 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $1,100.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $39,500.00 | $37,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,775.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Electrical Mechanical Structural Engineers | |
RF Exposure Measurements | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $326,061.00 | $319,751.00 | N/A | $313,381.78 | N/A |
Total for all systems | $8,108,651.42 | $5,896,290.58 | N/A | $5,144,093.21 | N/A |
Other Expenses | $326,061.00 | $319,751.00 | $313,381.78 | ||
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $41,000.00 | $41,000.00 | N/A | $40,955.78 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $267,176.00 | $267,176.00 | Please see Attachments 8A, 9A, and 74. Please note that additional Empire State Building elevator fee estimates are provided in Attachments 8A and 9A. | $267,176.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $5,250.00 | See quote provided as Attachment 53 | $5,250.00 | N/A |
Local Zoning | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Local Zoning | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $8,108,651.42 | $5,896,290.58 | $5,144,093.21 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 11/04/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 11/04/2020 |