Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CBS BROADCASTING INC. Doing Business As: CBS BROADCASTING INC. |
Daniel G. Ryson 1725 DeSales St. NW Suite 501 Washington, DC 20036 United States |
+1 (202) 457-4505 | dryson@cbs.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Daniel G. Ryson Associate Director of Spectrum Management CBS |
Daniel G. Ryson 1725 DeSales St. NW Suite 501 Washington, DC 20036 United States |
+1 (202) 457-4074 | dryson@cbs.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Interim post-transition transmitter will be commissioned at the interim site. Following the transition, the interim site will become the new main and the prior main site will be equipped with new transmitter and become the aux. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Auxiliary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Harris |
Model | Maxiva UAX | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 3 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Auxiliary | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 21 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-32R44 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | Vendor will not retune existing aux transmitter. We will use this transmitter as the interim until the main can be built. Solid State transmitters once considered an upgrade are no longer considered an upgrade. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Surge Suppressor and 112.5 Kva Transformer. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Additional Electrical Work |
Additional Electrical Work for Deer Park site. |
Disconnect Old Transmitter |
Disconnect old transmitter to create sufficient room for interim transmitter. |
State Sales Tax |
Auxiliary Transmitter Sales Tax. |
Grounding Bonding Etc |
Install Ground System for Deer Park site. |
RF Accessories |
Coaxial Switch and Test Load |
Ground Rods Fixtures, etc. |
Light fixtures, ground rods, etc. |
Emergency Generator |
Emergency Generator for Deer Park site. |
Test Load |
Water Cooled test load for interim transmitter. |
New Power Distribution |
Replacement Power Distribution Panel |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma | |
Year | 2009 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 42 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-90 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 56.4 kW | |
Justification for New Transmitter | Vendor will not re-tune the existing backup (see Exhibit 1). New IOT transmitter (see Exhibit 2) is more expensive than proposed transmitter (see Exhibit 3). |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Transformer 208. Step-down transformer to 208 from 480 required for new transmitter. Larger conductors required. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 30 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 0.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
RF Accessories |
Required for transmitter. See Exhibit 3, item C. |
Transmitter Site Survey |
GatesAir Basic Site Survey. Determines site conditions and recommend materials and components for installation of GatesAir equipment. See Exhibit 25. |
Electrical Sub Panel |
New Sub-Panels for locations that are currently not supporting transmitter equipment. See Exhibit 5A. |
Additional HVAC Unit |
Small (5-Ton) Split System for cooling in the CBS equipment room. |
Ducting and Plenum |
Modifications to existing HVAC ducting and plenum are necessary for proper cooling of transmitter. |
Sales Tax |
Primary Transmitter Sales Tax |
Fine Matcher |
Fine Matcher. See Exhibit 49. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 64 | |
Design power capacity in use | 75.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 750.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 540.0 kW | |
Manufacturer | Harris | |
Model | TAD-16UDA 8/64 | |
Year | 1995 |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Doomsday Auxiliary | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | Yes | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels | 16 | |
Design power capacity in use | 35.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 650.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 50.0 kW | |
Manufacturer | Dielectric | |
Model | TUA-C2-8/16M-1 | |
Year | 2014 |
Facility ID | Call Sign |
---|---|
35670 | KTLA |
47906 | KNBC |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | No |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 1 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
31 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 590.0 kW | |
Manufacturer | ||
Model | TFU-22JBH/VP-R O8 | |
Year | 2019 | |
Justification for New Antenna | See March 2018 Invoices Statement and Exhibit 13. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna Sales Tax |
9.5% State and Local Sales Tax. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Myat and Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 410 feet per run |
Name | Description |
---|---|
Additional Rigid Line |
50 feet of 6 1/8-inch for within building. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1100 feet per run | |
Justification for New Transmission Line | Transmission line is required for interim facility to function. Includes 10 elbows, gas stop, freight, and accessories, See Exhibit 12. |
Name | Description |
---|---|
Ceiling Hangers |
Ceiling Hangers, Horizontal Anchors, and Shipping. |
Coring Entry Plate |
Install Entry Plate for Interim Line. |
Grounding Bracing Line Routing |
Grounding, earthquake bracing and interim transmission line routing. |
Sales Tax |
9.5% State and Local Taxes |
Reinstall Switch |
Emergency replacement of coaxial switch and fine matcher during off-air emergency. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Auxiliary (Backup) | |
Description of Use | Interim | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1012836 | |
Coordinates (NAD83) | Latitude (NAD83) | 34° 13' 55.0" N- |
Longitude (NAD83) | 118° 04' 21.0" W- | |
Overall Structure Height | 972.43 feet | |
Support Structure Height | 899.60 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 5658.40 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 01/01/1986 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Analysis |
Cost to conduct structural analysis for tower reinforcements. See Exhibit 5B. |
Tower Permit Packages |
Permit drawings of tower, ground, and building. |
Tower Project Management |
Onsite project management for tower modification and RF installation. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 355 | |
Explanation | Company lacks sufficient resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Coordination Meeting |
Site coordination meetings with all broadcasters, contractors and vendors involved with the site project. See Exhibit 5. |
Fire Suppression Engineering Permitting |
Fire Suppression Engineering and Permitting. Please see Exhibit 112. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | Yes | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Cable Tray Hardware |
Interim Site Cable Tray Hardware. See Exhibit 55. |
Fire Suppression Engineering Parts and Labor |
Fire Suppression Engineering Parts and Labor |
GPS Antenna Kits |
4 Each GPS Antenna Kits. 2 each required for primary and auxiliary transmitter exciters. |
In-House Labor |
Time Spent by Internal Employee on Channel Change Tasks. |
Self-Assessed Sales Tax |
California Sales Tax - Various Items |
TX Removal and Installation |
Remove Aux TX and assist with new TX system installation. |
TX Removal and Installation Cont'd |
Remove Aux TX and assist with new TX system installation. Added because prior cost category was locked. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,770,857.45 | $2,984,123.64 | N/A | $2,479,823.60 | N/A |
Total for all systems | $6,911,945.19 | $4,684,115.23 | N/A | $3,990,264.57 | N/A |
Primary Transmitter ULXTE-90 | $3,694,451.77 | $2,002,487.45 | $1,509,439.35 | ||
Sales Tax | $100,994.25 | $100,994.25 | State Sales Tax. Please See Exhibit 3, Page 1. | $99,771.13 | N/A |
Ducting and Plenum | $2,500.00 | $2,500.00 | After remove and replacing transmitters, heat distribution in the transmitter room will change. No additional HVAC is needed but the location of things that need to be cooled will change. | N/A | N/A |
Electrical Sub Panel | $4,750.00 | $4,750.00 | New Sub-Panels for locations that are currently not supporting transmitter equipment. See Exhibit 5B. Final costs exceeded original estimate. Please see Exhibits 111 & 112. | $4,750.00 | Per American Towers LLC: "Cost Came in slightly higher than estimated." Please see Exhibit 112. |
Transmitter Site Survey | $7,541.10 | $7,541.10 | GatesAir Basic Site Survey. Determines site conditions and recommend materials and components for installation of GatesAir equipment. See Exhibit 25. | $7,541.10 | N/A |
RF Accessories | $54,194.37 | $54,194.37 | Coaxial Switch, Coaxial Switch Controller. Required for transmitter. See Exhibit 3, Item C. | $54,194.37 | N/A |
Other -- HVAC Service Type: C Size:30 (Other) | $60,000.00 | $60,000.00 | HVAC required in previously unused space to accommodate new repack transmitter and equipment. See Exhibit 5B. | $0.00 | N/A |
Other Electrical Service: Transformer 208. Step-down transformer to 208 from 480 required for new transmitter. Larger conductors required. | $9,983.62 | $9,983.62 | See Exhibit 3, Item D | $9,983.62 | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $10,100.00 | $9,600.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $109,992.00 | Various electrical wiring changes and additions required at main transmitter site. See Exhibit 7A. | $109,992.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | $1,788,000.00 | $1,089,018.70 | See Exhibit 57, items A, B, E, Change Orders, and Freight. | $669,293.72 | N/A |
Additional HVAC Unit | $22,640.00 | $22,640.00 | Small (5-Ton) split HVAC unit and ductwork for cooling in CBS equipment room. Required in addition to large (30-Ton) unit being installed by American Tower. See quote provided as Exhibit 85. | $22,640.00 | N/A |
Other -- Building Addition Size: 0.0 | $119,090.00 | $119,090.00 | Prepare previously unused space to accommodate repack transmitter. See Exhibit 5B for initial quotation. Final costs exceeded original estimate. Please see Exhibits 111 & 112. | $119,090.00 | Per American Towers LLC Exhibit 112: "Preperation on previously unused space to accomidate repack equipment." (sic). Please Exhibit 112 Item 3-C-3. |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $408,724.98 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See Exhibit 3, items A, B, and E. | $408,724.98 | N/A |
Fine Matcher | $3,458.43 | $3,458.43 | Fine Matcher. Includes Tax and Freight. See exhibits 48 and 49. | $3,458.43 | N/A |
Auxiliary Transmitter Maxiva UAX | $109,355.00 | $14,585.51 | $14,585.51 | ||
UHF and VHF - minor banding issues | $105,200.00 | $11,001.95 | Retune Mask Filter - See Exhibit 6A. (This is a newer quotation than that Exhibit 6 but there was no change in estimated cost.) | $11,001.95 | N/A |
3 kW mask filter | $4,155.00 | $3,583.56 | See $3,150 quote provided as Exhibit 76 plus 299.25 sales tax and $122.66 shipping and $11.65 for sales tax on shipping. | $3,583.56 | N/A |
Auxiliary Transmitter UAXTE-32R44 | $967,050.68 | $967,050.68 | $955,798.74 | ||
New Power Distribution | $26,372.73 | $26,372.73 | The new transmitter required circuit breaker sizes that are no longer available to the old, no longer manufactured or supported, power distribution panel. Please see Exhibit 121 for quote. | $26,372.64 | N/A |
Test Load | $2,933.88 | $2,933.88 | Water cooled test load. Required to test interim transmitter. See Exhibit 66 for quote. | $2,933.88 | N/A |
Emergency Generator | $150,000.00 | $150,000.00 | Emergency Generator. Duplicates capability at main primary. See Exhibits 68 and 69. | $150,000.00 | N/A |
Ground Rods Fixtures, etc. | $9,126.27 | $9,126.27 | See quotes provided as Exhibit 72, 73, and 74. | $8,573.01 | asfd |
RF Accessories | $84,232.34 | $84,232.34 | Coaxial Switch and Dummy Load for Interim Transmitter. See Exhibit 61 for quotation ($58,079.90), Exhibit 84 for sales tax ($4,472.44), and Exhibit 87 ($21,680.00) for installation labor . | $84,232.33 | N/A |
Grounding Bonding Etc | $4,053.42 | $4,053.42 | Install and provide ground bus bars and ground transmitter at Deer Park site. See Exhibit 44 for quote and details. | $4,053.42 | N/A |
State Sales Tax | $53,298.00 | $53,298.00 | State Sales Tax. Please see Exhibit 4, Page 1. | $42,599.42 | N/A |
Disconnect Old Transmitter | $1,950.00 | $1,950.00 | Disconnect an old transmitter. This work was necessary to create room for the new interim transmitter. Please see quote in Exhibit 98. | $1,950.00 | N/A |
Additional Electrical Work | $71,257.00 | $71,257.00 | Various electrical work required at Deer Park site. Please see quote provided as Exhibit 42 ($65,055) plus Exhibit 103 ($6,202). | $71,257.00 | N/A |
Other Electrical Service: Surge Suppressor and 112.5 Kva Transformer. | $4,309.03 | $4,309.03 | Surge suppressor and transformer required for proper operation of transmitter. See Exhibit 4. | $4,309.03 | N/A |
UHF - Air Cooled Solid State Transmitter 19.2 kW | $23,512.89 | $23,512.89 | Transmitter, mask filter, and installation/proof. Estimated Cost is based on $559,518.01 (see Exhibit 4 items A, B, D plus Change Orders Q-74735 and Q-79831 in Exhibit 110A) minus already reimbursed $536,005.12 shown in another now locked cost category. | $23,512.89 | asdf |
UHF - Air Cooled Solid State Transmitter 19 kW | $536,005.12 | $536,005.12 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Transmitter, mask filter, and installation/proof. required for operation of interim site. Comparable to Widelity Cost Catalog pricing for 20 kW transmitter. See Exhibit 4, Items A, B, and D plus Change Orders Q-74735 and Q-79831 in Exhibit 110. | $536,005.12 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | |
Ducting and Plenum | Information not provided. |
Electrical Sub Panel | |
Transmitter Site Survey | |
RF Accessories | |
Other -- HVAC Service Type: C Size:30 (Other) | |
Other Electrical Service: Transformer 208. Step-down transformer to 208 from 480 required for new transmitter. Larger conductors required. | |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Switchgear - industrial 800 amp | |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | |
Additional HVAC Unit | |
Other -- Building Addition Size: 0.0 | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Fine Matcher | |
UHF and VHF - minor banding issues | |
3 kW mask filter | |
New Power Distribution | |
Test Load | |
Emergency Generator | |
Ground Rods Fixtures, etc. | |
RF Accessories | |
Grounding Bonding Etc | |
State Sales Tax | |
Disconnect Old Transmitter | |
Additional Electrical Work | |
Other Electrical Service: Surge Suppressor and 112.5 Kva Transformer. | |
UHF - Air Cooled Solid State Transmitter 19.2 kW | |
UHF - Air Cooled Solid State Transmitter 19 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $420,513.46 | $437,242.46 | N/A | $387,385.24 | N/A |
Total for all systems | $6,911,945.19 | $4,684,115.23 | N/A | $3,990,264.57 | N/A |
Interim Antenna TFU-22JBH/VP-R O8 | $329,583.46 | $390,842.46 | $350,896.50 | ||
Antenna Sales Tax | $33,353.46 | $33,353.46 | 9.5% Sales Tax on Antenna (see Exhibit 13) minus V-Pol cost. | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | Please see quote provided as Exhibit 12. | $6,400.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $351,089.00 | This bottom-mount stacked antenna must provide structural support for big, top-mount VHF antenna. Includes elbow complex, repack sweep, and one fixed length of 6-inch line. Additional V-Pol cost was subtracted. See Exhibit 13. | $344,496.50 | N/A |
Primary Antenna TAD-16UDA 8/64 | $0.00 | $0.00 | $0.00 | ||
Auxiliary Antenna TUA-C2-8/16M-1 | $90,930.00 | $46,400.00 | $36,488.74 | ||
Adding a module to existing combiner (without antenna) | $84,200.00 | $40,000.00 | See Exhibit 80 for combiner cost which will be shared with two other stations. KCBS-TV's share is $19,940.74 including shipping and tax. Revised installation cost is shown in Exhibit 105. | $36,488.74 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Antenna Sales Tax | Information not provided. |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Adding a module to existing combiner (without antenna) | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $277,378.65 | $261,762.25 | N/A | $227,176.86 | N/A |
Total for all systems | $6,911,945.19 | $4,684,115.23 | N/A | $3,990,264.57 | N/A |
Interim Transmission Line | $267,778.65 | $252,162.25 | $227,176.86 | ||
Sales Tax | $18,585.39 | $18,585.39 | 9.5% State and Local Tax on Interim Transmission Line. | N/A | N/A |
Ceiling Hangers | $7,421.26 | $7,421.26 | Ceiling hangers, horizontal anchor, and freight. See quote in Exhibit 52 and shipping in Exhibit 54. | $7,421.26 | N/A |
Rigid Transmission Line - copper, 6 1/8" | $222,200.00 | $206,583.60 | Please see March 2018 Invoices Statement and Exhibit 12 ($195,635.60) plus Change Orders Exhibits 90 ($924.00), 96 ($7,175.00), and 113 ($2,849.00). Shipping listed separately. | $200,183.60 | N/A |
Reinstall Switch | $4,200.00 | $4,200.00 | Emergency replacement of transmission line switch and fine-matcher during off-air emergency due to failure of prior components. Please see Exhibit 100. | $4,200.00 | N/A |
Grounding Bracing Line Routing | $11,212.00 | $11,212.00 | Grounding, bracing, and interim transmission line routing. Please see Exhibits 98 and 99. | $11,212.00 | N/A |
Coring Entry Plate | $4,160.00 | $4,160.00 | Core drill transmission line entry plate. Please see quote provided as Exhibit 98. | $4,160.00 | N/A |
Primary Transmission Line | $9,600.00 | $9,600.00 | $0.00 | ||
Additional Rigid Line | $9,600.00 | $9,600.00 | Required for installation of new post-transition transmitter. (Widelity Cost Catalog pricing shown.) | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | Information not provided. |
Ceiling Hangers | |
Rigid Transmission Line - copper, 6 1/8" | |
Reinstall Switch | |
Grounding Bracing Line Routing | |
Coring Entry Plate | |
Additional Rigid Line | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $903,688.00 | $451,964.25 | N/A | $447,264.25 | N/A |
Total for all systems | $6,911,945.19 | $4,684,115.23 | N/A | $3,990,264.57 | N/A |
Auxiliary Tower GTOWER | $903,688.00 | $451,964.25 | $447,264.25 | ||
Major tower reinforcement/modifications | $421,000.00 | $150,000.00 | It is expected that the additional loads imposed on the tower by the new appurtenances required for the repack project will cause the tower to fail. The structural failure is expected to be in the major category. See Exhibit 5B. | $150,000.00 | N/A |
Structural Analysis | $5,238.00 | $5,238.00 | Cost to conduct structural analysis for tower reinforcements. See Exhibit 5B. | $5,238.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $10,300.00 | Structural tower mapping to provide data to the structural engineer in order to generate the correct structural output. See Exhibit 5B. | $10,300.00 | N/A |
Tower Project Management | $20,000.00 | $20,000.00 | Due to the complexity of the site and its access, it was estimated that onsite project management would be a duration of 40 hours. See Exhibit 5B. Final costs exceeded original estimate. Please see Exhibits 111 and 112. | $20,000.00 | Per American Towers LLC Exhibit 112: "Increased civil scope and weather delays on project extended construction management cost." |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $256,276.25 | Includes mobilization and tower rigging per the failing structural, removal of existing top antenna and tower top section, etc. See Exhibit 5B. Final costs exceeded original estimate. Please see Exhibits 111 & 112. | $256,276.25 | Per American Towers LLC Exhibit 112, Top Tower plate was welded on. Not caught in original SOW required fire watch and permit, extra time to modify tower grating for installation of transmission lines, Antenna delivery delays, post tower inspection. |
Tower Permit Packages | $10,150.00 | $10,150.00 | Generation of tower, building, and ground construction drawings required for local permits. See Exhibit 5B. ($4,700 plus $4,700, plus $750) | $5,450.00 | N/A |
Actual Information Description | File Name |
---|---|
Major tower reinforcement/modifications | |
Structural Analysis | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Tower Project Management | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Tower Permit Packages |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $99,760.00 | $115,580.00 | N/A | $38,742.50 | N/A |
Total for all systems | $6,911,945.19 | $4,684,115.23 | N/A | $3,990,264.57 | N/A |
Outside Professional Services | $99,760.00 | $115,580.00 | $38,742.50 | ||
Fire Suppression Engineering Permitting | $14,000.00 | $14,000.00 | Engineering and Permitting for relocation of Halon nozzles and required upgrade to FM-200 system. Please see Exhibit 112 Item 1-B-1. | $14,000.00 | N/A |
Site Coordination Meeting | $5,000.00 | $5,000.00 | Site coordination meetings with all broadcasters, contractors and vendors involved with the site project. All involved parties will jointly define a site action plan and cutover approach. See Exhibit 5B. | $5,000.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $1,662.50 | The actual cost was slightly complicated by the necessary use of a complex tower and stacked antennas. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $6,100.00 | N/A | $6,100.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $2,500.00 | N/A |
Project management of the transition | $56,090.00 | $74,480.00 | Company lacks sufficient resources. See Exhibits 5B and 7. | $9,480.00 | N/A |
Actual Information Description | File Name |
---|---|
Fire Suppression Engineering Permitting | |
Site Coordination Meeting | |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $439,747.63 | $433,442.63 | N/A | $409,872.12 | N/A |
Total for all systems | $6,911,945.19 | $4,684,115.23 | N/A | $3,990,264.57 | N/A |
Other Expenses | $439,747.63 | $433,442.63 | $409,872.12 | ||
TX Removal and Installation Cont'd | $10,362.32 | $10,362.32 | Cost category added because original TX Removal and Installation category was locked for some reason. Amount shown is difference between $137,500 proposal and $127,137.68 already specified in the other category. | $3,795.16 | N/A |
TX Removal and Installation | $127,137.68 | $127,137.68 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Estimate includes items in Exhibit 8A except Equipment Storage, Equipment Delivery, and Disposal, and 2/3 of the Verdugo Peak combiner installation costs, which will be shared between three stations. Also includes costs in Exhibit 62. | $127,137.68 | N/A |
Self-Assessed Sales Tax | $63,131.39 | $63,131.39 | Self-assessed Sales and Use Taxes paid to California Department of Tax and Fee Administration for invoices related to FCC Spectrum Repacking. Please see Exhibit 118. | $63,131.39 | N/A |
In-House Labor | $2,861.63 | $2,861.63 | A small portion of internal labor costs for this project. Please see Exhibit 117A. | $2,861.63 | N/A |
GPS Antenna Kits | $1,364.86 | $1,364.86 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Four GPS Antenna Kits. Two each for primary and auxiliary transmitter exciters. Cost includes Sales Tax and Freight. See Exhibits 58 and 59. | $1,364.86 | N/A |
Fire Suppression Engineering Parts and Labor | $108,069.00 | $108,069.00 | Please see American Towers LLC Exhibit 112 Item 1-B-1. Halon nozzles had to be relocated to accommodate new transmitters. Code required halon system to be upgraded to FM-200 with any modification. | $108,069.00 | N/A |
Cable Tray Hardware | $1,374.40 | $1,374.40 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Cable Tray Hardware - Required at Interim Site. See Exhibit 55. | $1,374.40 | N/A |
MVPD Notification of Channel Change | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Equipment Storage | $5,000.00 | $5,000.00 | See Exhibit 8A. | $4,761.20 | N/A |
Equipment Delivery and Handling Charges | $74,848.22 | $74,848.22 | See Exhibits 8A ($15,000), 51 ($14,131.13), 82 ($641), 83 ($60.89), 89 ($1,869.57), 91 ($439.72), 92 (11,238.56), 97 ($9,499.21), 98 ($9,430), 110 ($9,241.49), 114 ($1,093.99), and 116 ($2,202.66). | $61,023.67 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $29,768.13 | $29,768.13 | See Exhibit 8A. Final costs exceeded original estimate. Please see Exhibits 111 & 112. | $29,768.13 | After the original estimates, it was determined that unused equipment could be moved to make room for electrical disconnects. This required removal and disposal of 6 racks of unused equipment. |
BLM or NFS Coordination | $1,000.00 | $1,000.00 | See Exhibit 5B. | $1,000.00 | N/A |
Non-zoning permits | $750.00 | $750.00 | The cost of preparation and submission of the needed forms (excluding permit drawing package) for permits for jurisdictional permits required for electrical, building and other repack required tasks. See Exhibit 5B. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $335.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $5,250.00 | See Exhibit 9. | $5,250.00 | N/A |
Actual Information Description | File Name |
---|---|
TX Removal and Installation Cont'd | |
TX Removal and Installation | |
Self-Assessed Sales Tax | |
In-House Labor | |
GPS Antenna Kits | |
Fire Suppression Engineering Parts and Labor | |
Cable Tray Hardware | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
BLM or NFS Coordination | |
Non-zoning permits | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $6,911,945.19 | $4,684,115.23 | $3,990,264.57 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 10/05/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 10/05/2020 |