Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WEST CENTRAL OHIO BROADCASTING, INC. |
Keith Wilkowski 405 Madison Avenue, Suite 2100 Toledo, OH 43604 United States |
+1 (419) 724-7276 | kwilkowski@blockcommunications.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity |
Samuel Hariton 4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WPNM-LP is planning to upgrade its transmitter, upgrade its antenna, purchase new transmission line and move to a different tower. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 830-A | |
Year | 1999 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.0 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXT-6 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 5.4 kW | |
Justification for New Transmitter | Re-tuning the existing main transmitter is not an option because the existing transmitter's power output is insufficient to provide the necessary ERP from the new antenna due in part to the longer run of transmission line |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 1.25 inches | |
Length | 125.0 feet | |
Other Electrical Service | Yes | |
Description | Install service cut-off, breaker box, and attach transmitter to service upon completion by Gates. Renting building and tower space. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 96.0 square feet |
Name | Description |
---|---|
Primary Transmitter Remote Control System |
Remote Control System |
Primary Transmitter - Other Parts |
Parts necessary for transmitter functionality |
Transmitter-Demodulator |
Transmitter-Demodulator |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 4 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
ERP: | 7.7 kW | |
Manufacturer | ||
Model | 4X1KBBU | |
Year | 2004 |
Facility ID | Call Sign |
---|---|
70612 | WAMS-LD |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCE512O-V0-27 | |
Year | 2018 | |
Justification for New Antenna | This antenna is required because the pre-displacement antenna could not be retuned to the new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Fabricate and install ice bridge, heat exchanger protection on pad |
Fabricate and install ice bridge, heat exchanger protection on pad. |
Primary Antenna - Antenna Mounts |
Primary Antenna - Antenna Mounts |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Number of parallel runs | 1 | |
Length | 250 feet per run |
Facility ID | Call Sign |
---|---|
70612 | WAMS-LD |
Name | Description |
---|---|
Primary Transmission Line - Additional Installation Pieces |
Additional pieces required for installation |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1016071 | |
Coordinates (NAD83) | Latitude (NAD83) | 41° 08' 12.0" N- |
Longitude (NAD83) | 083° 54' 24.0" W- | |
Overall Structure Height | 1089.55 feet | |
Support Structure Height | 1030.83 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 727.03 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | BOWLING GREEN STATE UNIVERSITY | |
Date Constructed | 08/13/2004 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | WPNM-LD does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing, tracking, progress reporting, monitoring and all other activities necessary to facilitate on-time completion of the station's build | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Receive Antenna |
Receive Antenna needed due to repack channel change |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $371,766.79 | $263,371.63 | N/A | $73,749.06 | N/A |
Total for all systems | $612,272.52 | $532,190.52 | N/A | $156,392.03 | N/A |
Primary Transmitter ULXT-6 | $371,766.79 | $263,371.63 | $73,749.06 | ||
Transmitter-Demodulator | $918.67 | $918.67 | Please see Heartland Video Systems quote WISQ63261 | $918.67 | N/A |
Primary Transmitter - Other Parts | $5,051.90 | $5,051.90 | Please see Estimated Cost Justification WPNM-LP-110-Primary Transmitter - Other Parts v1 | $1,246.25 | N/A |
Primary Transmitter Remote Control System | $8,138.62 | $8,138.62 | Please see WPNM-LP Remote Control System Budget Revision Justification Letter | $4,338.57 | N/A |
Other Electrical Service: Install service cut-off, breaker box, and attach transmitter to service upon completion by Gates. Renting building and tower space. | $8,655.82 | $8,655.82 | see Estimated Cost Justification WPNM-LD-110-Primary Transmitter - Other Electrical Service v0 | $8,655.82 | N/A |
UHF - Liquid Cooled Solid State Transmitter 4.9 - 6.5 kW | $255,000.00 | $166,931.91 | Please see GatesAir quote Q-73520 and Q-88762 for the like for like. | $54,737.98 | N/A |
Other -- Building Addition Size: 96.0 | $3,851.78 | $3,851.78 | see Estimated Cost Justification WPNM-LP-110-Primary Transmitter - Building Addition, 96 sq ft v0 | $3,851.77 | N/A |
1.25" Rigid Conduit and Wiring | $12,000.00 | $12,000.00 | Station renting from another company/tower. Cost reflect installation of step down transformer, & transmitter electrical needs. | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $5,222.93 | see Justifying Quote WPNM-LP GatesAir Q-77810 Transformer. Transformer will be 75kVA but was entered as 150kVA due to limitation of LMS system | $0.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $38,200.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transmitter-Demodulator | |
Primary Transmitter - Other Parts | |
Primary Transmitter Remote Control System | |
Other Electrical Service: Install service cut-off, breaker box, and attach transmitter to service upon completion by Gates. Renting building and tower space. | |
UHF - Liquid Cooled Solid State Transmitter 4.9 - 6.5 kW | |
Other -- Building Addition Size: 96.0 | |
1.25" Rigid Conduit and Wiring | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $32,096.70 | $32,096.70 | N/A | $26,366.69 | N/A |
Total for all systems | $612,272.52 | $532,190.52 | N/A | $156,392.03 | N/A |
Primary Antenna ATC-BCE512O-V0-27 | $32,096.70 | $32,096.70 | $26,366.69 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $18,889.00 | $18,889.00 | Please see attached Alive Telecom quote ATC-BCE512O-V0-27 | $18,888.99 | N/A |
Primary Antenna - Antenna Mounts | $538.95 | $538.95 | Please see WPNM-LP Primary Antenna - Antenna Mounts Budget Revision Justification Letter | $538.95 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
Fabricate and install ice bridge, heat exchanger protection on pad | $6,938.75 | $6,938.75 | See narrative and WPNM-LP Ice Bridge Estimated Cost Justification | $6,938.75 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | |
Primary Antenna - Antenna Mounts | |
Sweep test of transmission line and antenna | Information not provided. |
Fabricate and install ice bridge, heat exchanger protection on pad |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,179.75 | $1,179.75 | N/A | $1,179.74 | N/A |
Total for all systems | $612,272.52 | $532,190.52 | N/A | $156,392.03 | N/A |
Primary Transmission Line | $1,179.75 | $1,179.75 | $1,179.74 | ||
Primary Transmission Line - Additional Installation Pieces | $1,179.75 | $1,179.75 | Please see Electronics Research, Inc. proposal 201962-909, proposal 20190612-818, and change request 35819T, plus actual sales and freight tax on invoices 53611 and 53683 | $1,179.74 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmission Line - Additional Installation Pieces |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $157,750.00 | $157,750.00 | N/A | $4,280.00 | N/A |
Total for all systems | $612,272.52 | $532,190.52 | N/A | $156,392.03 | N/A |
Primary Tower TOWER | $157,750.00 | $157,750.00 | $4,280.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $157,750.00 | N/A | $4,280.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,082.00 | $70,395.16 | N/A | $49,824.26 | N/A |
Total for all systems | $612,272.52 | $532,190.52 | N/A | $156,392.03 | N/A |
Outside Professional Services | $42,082.00 | $70,395.16 | $49,824.26 | ||
Perform engineering study for displacement application | $1,800.00 | $18,025.83 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $18,025.83 | N/A |
Project management of the transition | $26,797.00 | $41,910.00 | see Justifying Quote WPNM-LD Widelity strategic support quote | $30,576.10 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $236.83 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $236.83 | Please see submitted invoices. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $985.50 | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Perform engineering study for displacement application | |
Project management of the transition | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Prepare Form 601 | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,397.28 | $7,397.28 | N/A | $992.28 | N/A |
Total for all systems | $612,272.52 | $532,190.52 | N/A | $156,392.03 | N/A |
Other Expenses | $7,397.28 | $7,397.28 | $992.28 | ||
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Receive Antenna | $992.28 | $992.28 | Please see Heartland Video Systems quote WISQ64813, plus actual shipping and tax on invoice 72302 | $992.28 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Receive Antenna |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $612,272.52 | $532,190.52 | $156,392.03 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Wilkowski VP, Legal & Governmental Affairs 10/19/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Wilkowski VP, Legal & Governmental Affairs 10/19/2020 |