Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Maryland Public Broadcasting Commission Doing Business As: Maryland Public Television |
Carl Wolfe, Director, Transmission and Distribution 11767 Owings Mills Boulevard Owings Mills, MD 21117 United States |
+1 (410) 356-5600 | cwolfe@mpt.org | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity Inc. |
Samuel Hariton 4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Current transmission system consists of a main/aux transmitter feeding a transmission line connected to an antenna. An interim antenna and line will be needed as the main antenna must be removed and replaced. See attached narrative. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CCT-U-DCX2 | |
Year | 1999 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 40.0 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | HPTV-PRLX-U48 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 75 kW | |
Justification for New Transmitter | See previous submissions regarding upgrade from IOT to solid state. This increase of power is part a multi-station agreement provided to the FCC to accommodate moving WETA to channel 31. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Coolant |
The coolant used for the transmitter heat exchanger is not included in the transmitter price |
Remote Control Interface |
License required to interface transmitter into current remote control system |
CIF Mask Filter |
Constant Impedance mask Filter. Current mask filter is a CIF. |
8-Pole MAsk Filter |
A more rigid mask filter to protect adjacent land mobile stations on Ch. 20 in Philadelphia. |
Additional Rigid Coax Line |
Additional rigid interconnection coax lines from transmitter to filter to antenna switch as identified by manufacturer. (See budget revision 051418) |
Rigid Coax Line |
Rigid interconnection coax lines from transmitter to filter to antenna switch. |
Site Design and Survey |
Incorporates all aspects of the transmitter room design, including power distribution requirements, equipment placement, RF system layout, plumbing, and remote control. |
Motorized Switch |
To enable switching between main and interim antenna, (See budget revision 051418) |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30GTH/VP-R 06 | |
Year | 2018 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30GTH/VP-R O6 | |
Year | 2018 | |
Justification for New Antenna | Current antenna tuned for channel 42 and cannot be retuned. Applicant is proposing to replace with similar make and model tuned to channel 21 with elliptical polarization. part a multi-station agreement provided to the FCC to accommodate moving WETA. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Mounting Pole |
62.7 ft. mounting pole to bring Center of Radiation to current height. |
RF Feed Though Components |
Elbows and cut line segments to feed antenna to tower top plate |
Wedding Cake Adaptor |
Joins antenna to mounting pole |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 32 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 50.0 % | |
Other Antenna Type | N/A | |
ERP: | 516.0 kW | |
Manufacturer | ||
Model | TUA-O4-8/32H-1-R SM | |
Year | 2018 | |
Justification for New Antenna | See attached narrative regarding Interim facility. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 935 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 935 feet per run | |
Justification for New Transmission Line | Current line will be used for the interim facility, This line will be used for the repack facility on channel 21. This is part of an agreement provided to the FCC to move WMPT to Ch. 21 to accommodate moving WETA to channel 31. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1225569 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 00' 36.7" N- |
Longitude (NAD83) | 076° 36' 31.8" W- | |
Overall Structure Height | 902.88 feet | |
Support Structure Height | 786.08 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 146.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Maryland Public Broadcasting Commission | |
Date Constructed | 04/01/2003 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | Applicant has limited internal resources to oversee installing and commissioning this repack project. It will rely on outside services to manage all work required. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Progress Reporting |
Prepare and file 10 required progress reports on FCC Form 2100, Schedule 387 on a quarterly basis with the FCC. |
Attorney Fees - Other Matters |
Additional Legal Services |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Diagnostic Sweep Test |
Preliminary Sweep of pre-transition transmission line to antenna at WMPT transmitter site in Annapolis, MD. Sweep test determined that line would not function on post-transition channel. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,177,831.47 | $2,317,806.47 | N/A | $2,144,273.45 | N/A |
Total for all systems | $3,810,078.92 | $3,909,102.04 | N/A | $3,528,926.15 | N/A |
Primary Transmitter HPTV-PRLX-U48 | $2,177,831.47 | $2,317,806.47 | $2,144,273.45 | ||
Motorized Switch | $43,250.00 | $43,250.00 | Motorized switch to switch between main and interim antenna. Inadvertently omitted from initial quote. (See revision 051418) | $0.00 | N/A |
Site Design and Survey | $15,300.00 | $15,300.00 | Incorporates all aspects of the transmitter room design, including power distribution requirements, equipment placement, RF system layout, plumbing, and remote control. | $15,300.00 | N/A |
Rigid Coax Line | $7,830.00 | $7,830.00 | Rigid interconnection coax lines from transmitter to filter to antenna switch. NOTE: The full length will not be used. These will be cut to desired length for interconnection purposes inside building. | $0.00 | N/A |
Additional Rigid Coax Line | $7,610.00 | $7,610.00 | Additional rigid interconnection coax lines as identified by vendor to interconnect between transmitter and antenna switch. NOTE: These will be cut to desired length for interconnection purposes inside building. (See revision 051418) | $7,499.48 | N/A |
8-Pole MAsk Filter | $15,000.00 | $15,000.00 | A more rigid mask filter to protect adjacent land mobile stations on Ch. 20 in Philadelphia. | N/A | N/A |
CIF Mask Filter | $40,690.00 | $40,690.00 | Constant Impedance mask Filter. Current mask filter is a CIF. | N/A | N/A |
Coolant | $3,000.00 | $3,000.00 | The coolant used for the transmitter heat exchanger is not included in the transmitter price. Cost reflects what is need for two transmitter cabinets. | N/A | N/A |
Remote Control Interface | $2,940.00 | $2,940.00 | License required to interface transmitter into current remote control system. | N/A | N/A |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | $43,211.47 | $43,211.47 | Electrical contractor to connect transmitter into existing electrical panel. Includes material and labor for three transmitter cabinets. Attached quote is for each cabinet. Additional $611.47 work required | $32,291.47 | N/A |
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW | $1,999,000.00 | $2,138,975.00 | See attached quote P#2962B-PRLXU48-090617-R6. An increase of power is part a multi-station agreement provided to the FCC to accommodate moving WETA to channel 31. | $2,089,182.50 | N/A |
Actual Information Description | File Name |
---|---|
Motorized Switch | Information not provided. |
Site Design and Survey | |
Rigid Coax Line | |
Additional Rigid Coax Line | |
8-Pole MAsk Filter | Information not provided. |
CIF Mask Filter | Information not provided. |
Coolant | Information not provided. |
Remote Control Interface | Information not provided. |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $742,009.35 | $660,755.35 | N/A | $654,657.45 | N/A |
Total for all systems | $3,810,078.92 | $3,909,102.04 | N/A | $3,528,926.15 | N/A |
Interim Antenna TUA-O4-8/32H-1-R SM | $272,028.35 | $266,636.35 | $260,538.45 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $2,118.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $21,750.00 | N/A | $20,721.15 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $10,298.00 | N/A | $9,374.55 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 516 horizontally polarized | $22,578.35 | $22,578.35 | Correction for line cost. Includes Shipping and freight. | $21,314.75 | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 516 horizontally polarized | $200,610.00 | $200,610.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See attached narrative regarding Interim facility. | $200,610.00 | N/A |
Primary Antenna TFU-30GTH/VP-R O6 | $469,981.00 | $394,119.00 | $394,119.00 | ||
Wedding Cake Adaptor | $18,330.00 | $18,330.00 | Joins antenna to mounting pole | $18,330.00 | N/A |
RF Feed Though Components | $20,906.00 | $20,906.00 | Elbows and cut line segments to feed antenna to tower top plate | $20,906.00 | N/A |
Mounting Pole | $122,215.00 | $122,215.00 | Mounting pole to bring Center of Radiation to current height. | $122,215.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $12,383.00 | See attached revised quote. | $12,383.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $213,885.00 | N/A | $213,885.00 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 516 horizontally polarized | |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 516 horizontally polarized | |
Wedding Cake Adaptor | |
RF Feed Though Components | |
Mounting Pole | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $271,150.00 | $216,712.12 | N/A | $214,585.06 | N/A |
Total for all systems | $3,810,078.92 | $3,909,102.04 | N/A | $3,528,926.15 | N/A |
Primary Transmission Line | $271,150.00 | $216,712.12 | $214,585.06 | ||
Rigid Transmission Line - copper, 7 3/16" | $271,150.00 | $216,712.12 | Please see Estimated Cost Justification WMPT-310-Primary Transmission Line - 7 3_16 Rigid Copper v3 | $214,585.06 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 7 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $271,870.00 | $428,525.00 | N/A | $380,359.00 | N/A |
Total for all systems | $3,810,078.92 | $3,909,102.04 | N/A | $3,528,926.15 | N/A |
Primary Tower TOWER | $271,870.00 | $428,525.00 | $380,359.00 | ||
Tall Tower (greater than 500') | $210,500.00 | $372,755.00 | See attached quote. | $326,589.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $7,000.00 | N/A | $5,000.00 | N/A |
Tower Helicopter Lift | $48,770.00 | $48,770.00 | Please see attached FDH Infrastructure Services Proposal #P17_370008_001A | $48,770.00 | N/A |
Actual Information Description | File Name |
---|---|
Tall Tower (greater than 500') | |
Structural engineering tower load study for well documented tower | |
Tower Helicopter Lift |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $246,350.00 | $188,985.00 | N/A | $71,655.59 | N/A |
Total for all systems | $3,810,078.92 | $3,909,102.04 | N/A | $3,528,926.15 | N/A |
Outside Professional Services | $246,350.00 | $188,985.00 | $71,655.59 | ||
Project management of the transition | $94,010.00 | $99,675.00 | Please see Widelity Strategic Support Quote | $52,954.00 | N/A |
Attorney Fees - Other Matters | $850.00 | $850.00 | Estimated Cost Justification WMPT-550-Attorney - Other Matters v0 | $382.50 | N/A |
Progress Reporting | $35,000.00 | $35,000.00 | Prepare and file 10 required progress reports on FCC Form 2100, Schedule 387 on a quarterly basis with the FCC. | $3,231.75 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $20,000.00 | Needed to confirm new main antenna pattern performance and coverage. Inadvertently omitted from initial submission. (See revision 051418) | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $5,455.00 | see Estimated Cost Justification WMPT-550-Attorney - Special Temporary Authorization v1 | $5,455.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $5,000.00 | Fees related to multi-party resolution agreement with Maryland Public TV, WETA and HME Equity Fund II, LLC. Involved several stations moving channels to accommodate WETA moving from ch 14 to 31. | $3,743.25 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,505.00 | see Estimated Cost Justification WMPT-550-Attorney - License to Cover Application (Main) v0 | $2,505.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $472.50 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | $552.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $2,231.59 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $127.50 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Attorney Fees - Other Matters | |
Progress Reporting | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $100,868.10 | $96,318.10 | N/A | $63,395.60 | N/A |
Total for all systems | $3,810,078.92 | $3,909,102.04 | N/A | $3,528,926.15 | N/A |
Other Expenses | $100,868.10 | $96,318.10 | $63,395.60 | ||
Diagnostic Sweep Test | $3,733.10 | $3,733.10 | Please see attached WMPT Justification for Diagnostic Sweep Test - Ed Murlatt quote RWMPT180207 | $3,733.10 | N/A |
MVPD Notification of Channel Change | $1,200.00 | $1,200.00 | Please see Estimated Cost Justification WMPT-610-MVPD Notifications v0 | $1,200.00 | N/A |
Equipment Storage | $9,840.00 | $9,840.00 | Station may receive antenna and transmission line prior to tower crew availability. No on-site storage is available. Obtained estimate from manufacturer for 60 days of storage. | $780.00 | N/A |
Equipment Delivery and Handling Charges | $33,400.00 | $33,400.00 | See attached transmitter quote. Estimating $10,000 for two antennas and mounting pole. Proof and installation was reimbursed through this line item resulting in an overage to the estimate. Increased to cover invoiced delivery & handling charges | $33,360.00 | Line items did not include the proof and installation. |
Disposal Costs (for equipment and other waste, net of any salvage value) | $41,145.00 | $41,145.00 | See transmitter quote for equipment removal from building. | $20,572.50 | N/A |
DTV Medical Facility Notification | $11,550.00 | $7,000.00 | N/A | $3,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Diagnostic Sweep Test | |
MVPD Notification of Channel Change | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,810,078.92 | $3,909,102.04 | $3,528,926.15 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Carl R Wolfe Director, Transmission and Distribution 11/17/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Carl R Wolfe Director, Transmission and Distribution 11/17/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Carl R Wolfe Director, Transmission and Distribution 11/17/2020 |