Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WUVC LICENSE PARTNERSHIP, G.P. Doing Business As: WUVC LICENSE PARTNERSHIP, G.P. |
CHRISTOPHER G. WOOD 5999 CENTER DRIVE LOS ANGELES, CA 90045 United States |
+1 (310) 348-3600 | CWOOD@UNIVISION.NET | General Partnership |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Gregory Scott Coburn Director NextGen TV Univision Communications, Inc |
FCC Repack Reimbursement - Greg Coburn 5999 Center Drive Los Angeles, CA 90045 United States |
+1 (304) 952-8816 | gcoburn@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WUVC-DT constructed an interim facility on channel 19, and will construct a permanent facility on channel 11 by replacing existing transmitter and antenna. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Atlas DVL 3000 | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 3 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMV9-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.45 kW | |
Justification for New Transmitter | Existing transmitter is UHF and incapable of operation on assigned H-VHF channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Additional Breakers and new conduit in the transmitter building | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Channel 19 Mask Filter |
Mask filter for interim operation on channel 19 prior to displacement window under STA |
Channel RF Interconnect Components |
Myat Rigid transmission line, elbows,couplers and flanges for Channel 19 |
Channel 11 Mask Filter |
Mask filter for channel 11 operation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP16M2-HSO-40 | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | ATC-BCE4O-VO-11 | |
Year | 2019 | |
Justification for New Antenna | Existing CH 40 UHF antenna is not capable of operation on channel HVHF channel 11 |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Interim CH 19 Antenna |
CH 19 antenna for interim operation prior to displacement window. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1002990 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 03' 33.3" N- |
Longitude (NAD83) | 078° 57' 10.2" W- | |
Overall Structure Height | 482.93 feet | |
Support Structure Height | 459.97 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 449.80 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Global Tower, LLC. through American Towers, LLC | |
Date Constructed | 09/23/1994 |
Users |
---|
W243DK LP FM |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Landlord Structural assesment and Professional Engineer Letter for Channel 11 ant |
American Tower as landlord charges for structural assessment of proposed changes. |
Landlord Structural assesment and Professional Engineer Letter for Channel 19 ant |
American Tower as landlord charges for structural assessment of proposed changes. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 120 | |
Explanation | Local station is not staffed to perform antenna and transmitter replacement or tower projects. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $126,916.25 | $92,300.55 | N/A | $85,434.25 | N/A |
Total for all systems | $285,374.63 | $250,787.41 | N/A | $188,570.98 | N/A |
Primary Transmitter TMV9-2 | $126,916.25 | $92,300.55 | $85,434.25 | ||
Other Electrical Service: Additional Breakers and new conduit in the transmitter building | $2,700.00 | $2,700.00 | N/A | $2,700.00 | N/A |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | $101,000.00 | $55,866.30 | N/A | $55,866.30 | N/A |
Channel 11 Mask Filter | $5,473.00 | $5,473.00 | N/A | $3,557.45 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $20,518.00 | Installation is more complex than anticipated | $15,567.25 | Additional cost for parts and freight. |
Channel 19 Mask Filter | $3,334.33 | $3,334.33 | Estimate now includes freight charges and taxes | $3,334.33 | total includes $210.84 in tax and $356.76 in shipping costs. |
Channel RF Interconnect Components | $4,408.92 | $4,408.92 | N/A | $4,408.92 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Additional Breakers and new conduit in the transmitter building | |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | |
Channel 11 Mask Filter | |
Transmitter Building Site Survey/Installation | |
Channel 19 Mask Filter | |
Channel RF Interconnect Components |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $57,910.88 | $55,930.88 | N/A | $52,180.88 | N/A |
Total for all systems | $285,374.63 | $250,787.41 | N/A | $188,570.98 | N/A |
Primary Antenna ATC-BCE4O-VO-11 | $57,910.88 | $55,930.88 | $52,180.88 | ||
High VHF-Low Power, Side Mount, Slotted Coaxial, 3.0kW input, Elliptical | $39,525.00 | $39,525.00 | Estimate includes an additional $2025.00 in shipping charges not included in the quote or purchase orders | $39,525.00 | Total includes $2025 in shipping charges that were not included in the initial quote used to generate the estimated cost. |
Interim CH 19 Antenna | $12,655.88 | $12,655.88 | Estimate includes freight cost | $12,655.88 | Purchase orders used to determine estimated cost did not include freight charges. |
Sweep test of transmission line and antenna | $5,730.00 | $3,750.00 | Sweep test for Chan 19 to Chan 11. No sweep test conducted for Chan 40 to Chan 19 move | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
High VHF-Low Power, Side Mount, Slotted Coaxial, 3.0kW input, Elliptical | |
Interim CH 19 Antenna | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $59,840.00 | $36,695.00 | N/A | $11,695.00 | N/A |
Total for all systems | $285,374.63 | $250,787.41 | N/A | $188,570.98 | N/A |
Primary Tower GTOWER | $59,840.00 | $36,695.00 | $11,695.00 | ||
Landlord Structural assesment and Professional Engineer Letter for Channel 19 ant | $1,500.00 | $1,500.00 | N/A | $1,500.00 | N/A |
Landlord Structural assesment and Professional Engineer Letter for Channel 11 ant | $2,150.00 | $2,150.00 | N/A | $650.00 | N/A |
Tower Rigging Short Tower (less than 500') | $56,190.00 | $33,045.00 | Two separate tower riggings were required. the first for Channel 19 antenna, in the amount 9545.00 and the second for Channel 11 quoted from vendor at $23500 | $9,545.00 | existing side arms had to be removed and were not included in the original quote and PO |
Actual Information Description | File Name |
---|---|
Landlord Structural assesment and Professional Engineer Letter for Channel 19 ant | |
Landlord Structural assesment and Professional Engineer Letter for Channel 11 ant | |
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $32,207.50 | $57,360.98 | N/A | $39,260.85 | N/A |
Total for all systems | $285,374.63 | $250,787.41 | N/A | $188,570.98 | N/A |
Outside Professional Services | $32,207.50 | $57,360.98 | $39,260.85 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization | $4,470.00 | $4,470.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $2,250.00 | Estimate base on work invoiced for previous repacked CD stations | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $2,500.00 | Estimate base on work invoiced for previous repacked CD stations | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,500.00 | Estimate base on work invoiced for previous repacked CD stations | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $3,000.00 | Estimate base on work invoiced for previous repacked CD stations | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,560.00 | $2,750.00 | Displacement Consultation for STA was more extensive due to early displacement from Channel 40 to 19 and then 19 to 11. | $1,500.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $3,750.00 | Search for in-band channel due to early displacement. Had to also prepare an amendment to the application to specify Channel in 11 and not conflict with and adjacent station application. | $3,750.00 | N/A |
Form 399 assistance or other Program Management costs | $1,250.00 | $1,250.00 | N/A | $1,018.34 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Estimate base on work invoiced for previous repacked CD stations | N/A | N/A |
Project management of the transition | $12,660.00 | $33,390.98 | WTNC was moved to an interim Channel 19 and then to its final Channel 11 resulting in additional PM costs. Purchase orders recently submitted by Project Managers providing an more accurate estimate. See PO 50959, 53085 , 57894, 64207,54902, 53085, 50959 | $32,992.51 | WTNC was moved to an interim Channel 19 before it was able to move to its permanent assigned channel 11. This doubled the complexity and caused additional Project Management actions |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,500.00 | $8,500.00 | N/A | $0.00 | N/A |
Total for all systems | $285,374.63 | $250,787.41 | N/A | $188,570.98 | N/A |
Other Expenses | $8,500.00 | $8,500.00 | $0.00 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $8,500.00 | $8,500.00 | To remove and dispose of Channel 19 interim equipment. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $285,374.63 | $250,787.41 | $188,570.98 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 10/28/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 10/28/2020 |