Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
PRIEST LAKE TRANSLATOR DISTRICT Doing Business As: PRIEST LAKE TRANSLATOR DISTRICT |
P. O. BOX 53 COOLIN, ID 83821 United States |
+1 (208) 443-2492 | ayer.larry2@gmail.com | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | To replace existing transmitter with new GatesAir 50-watt transmitter, stringent mask filter, Sencore receiver/transcoder, and new panel antennas, in order to vacate repack channel-40 and move to new channel-32. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TADU-40 | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 40.0 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 50.0 W | |
Justification for New Transmitter | To move from repack channel-40 to newly authorized channel-32, and achieve slightly higher output power plus capability of remote transmitter monitoring. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | New 100-amp, 120/240 volt electrical service panel, plus additional 20-amp outlets and a 240-volt service for new air conditioner system installed, replacing smaller and aging 50-amp panel. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | Other | |
Other Size | 1 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Panel | |
ERP: | 75.0 W | |
Manufacturer | ||
Model | 4DR-4S | |
Year | 1993 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 2 | |
Lower Limit | 578.00 MHz | |
Upper Limit | 584.00 MHz | |
Design power capacity in use | 10.0 % | |
ERP: | 100.0 W | |
Manufacturer | ||
Model | SCA-4DR4S2944 | |
Year | 2019 | |
Justification for New Antenna | Mandated repack channel-change from channel-40 to channel-32 demanded new cut-channel antenna and power divider; invoiced total is shared 50/50 by station K33QB-D. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Power Dividers | Does the panel antenna require power dividers? | Yes |
Number of Power Dividers | 1 | |
Cable Harness | Does the panel antenna require cable harness? | Yes |
Number of Cable Harnesses | 2 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 48° 31' 52.7" N- |
Longitude (NAD83) | 116° 49' 01.7" W- | |
Overall Structure Height | 60.00 feet | |
Support Structure Height | 65.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3158.00 feet | |
Structure Type | UPOLE - Utility POLE/TOWER used to provide service | |
Tower Owner | Applicant | |
Date Constructed | 07/18/1996 |
Users |
---|
K31DS-D |
K33QB-D |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Access power pole-tower structure for antenna changes |
American Tree Service providing crew & rented, self-propelled man-hoist to lift antenna crew up to the proper location. |
Replace antennas |
Air Pipe, Inc. crew removes existing pair of panel antennas & power divider, and install new Scala-Kathrein channel-32 panel antennas & new power divider. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 1 | |
Justification | Field engineering services requested for initial start-up of new transmitter & receiver/transcoder, and to diagnose & correct input channel interference to the new system. |
Name | Description |
---|---|
Barnett Professional Services |
Assist with initial set-up of new transmitter, receiver-transcoder, and mask filter, along with programming & testing. Invoiced total is shared 50/50 with K33QB-D. |
B.W. St. Clair 2305 |
Assistance with understanding and navigating reimbursement form-399; review entries and advise corrections needed in all areas of the application. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,171.20 | $17,216.90 | N/A | $17,216.90 | N/A |
Total for all systems | $86,239.63 | $25,613.33 | N/A | $25,613.33 | N/A |
Primary Transmitter UAXTE-50 | $13,171.20 | $17,216.90 | $17,216.90 | ||
UHF - Air Cooled Solid State Transmitter 5 - 50 Watts | $10,200.00 | $14,245.70 | The transmitter vendor also provided the stringent mask filter and Sencore receiver/ transcoder, which increased the GatesAir invoice above the predetermined estimate. | $14,245.70 | N/A |
Other Electrical Service: New 100-amp, 120/240 volt electrical service panel, plus additional 20-amp outlets and a 240-volt service for new air conditioner system installed, replacing smaller and aging 50-amp panel. | $1,071.20 | $1,071.20 | N/A | $1,071.20 | N/A |
Other -- HVAC Service Type: H Size:1 (Other) | $1,900.00 | $1,900.00 | N/A | $1,900.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 5 - 50 Watts | |
Other Electrical Service: New 100-amp, 120/240 volt electrical service panel, plus additional 20-amp outlets and a 240-volt service for new air conditioner system installed, replacing smaller and aging 50-amp panel. | |
Other -- HVAC Service Type: H Size:1 (Other) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,800.00 | $2,510.50 | N/A | $2,510.50 | N/A |
Total for all systems | $86,239.63 | $25,613.33 | N/A | $25,613.33 | N/A |
Primary Antenna SCA-4DR4S2944 | $6,800.00 | $2,510.50 | $2,510.50 | ||
UHF Broadband panel antenna (per panel), horizontally-polarized | $3,500.00 | $1,790.50 | N/A | $1,790.50 | N/A |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $1,300.00 | $332.00 | N/A | $332.00 | N/A |
Cable harness (each, for panel antenna system, if not included in antenna cost) | $2,000.00 | $388.00 | N/A | $388.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF Broadband panel antenna (per panel), horizontally-polarized | |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | |
Cable harness (each, for panel antenna system, if not included in antenna cost) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,883.78 | $2,768.78 | N/A | $2,768.78 | N/A |
Total for all systems | $86,239.63 | $25,613.33 | N/A | $25,613.33 | N/A |
Primary Tower UPOLE | $56,883.78 | $2,768.78 | $2,768.78 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $2,075.00 | N/A | $2,075.00 | N/A |
Access power pole-tower structure for antenna changes | $693.78 | $693.78 | N/A | $693.78 | N/A |
Replace antennas | $0.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | |
Access power pole-tower structure for antenna changes | |
Replace antennas | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,384.65 | $3,117.15 | N/A | $3,117.15 | N/A |
Total for all systems | $86,239.63 | $25,613.33 | N/A | $25,613.33 | N/A |
Outside Professional Services | $9,384.65 | $3,117.15 | $3,117.15 | ||
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $60.00 | N/A | $60.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $337.50 | N/A | $337.50 | N/A |
Perform engineering study for displacement application | $1,800.00 | $0.00 | N/A | $0.00 | N/A |
Form 399 assistance or other Program Management costs | $1,000.00 | $1,000.00 | Correction assistance for Form 399 Filing. | $1,000.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $0.00 | N/A | $0.00 | N/A |
B.W. St. Clair 2305 | $1,000.00 | $1,000.00 | N/A | $1,000.00 | N/A |
Barnett Professional Services | $457.15 | $457.15 | N/A | $457.15 | N/A |
Additional Field Engineering Service, 1 Days | $262.50 | $262.50 | N/A | $262.50 | N/A |
Actual Information Description | File Name |
---|---|
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | Information not provided. |
B.W. St. Clair 2305 | |
Barnett Professional Services | |
Additional Field Engineering Service, 1 Days |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $86,239.63 | $25,613.33 | N/A | $25,613.33 | N/A |
Other Expenses | $0.00 | $0.00 | $0.00 |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $86,239.63 | $25,613.33 | $25,613.33 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Susan Hansen Consultant 08/31/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Susan Hansen Consultant 08/31/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Larry Ayer Acting President 08/31/2020 |