Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
International Communications Network, Inc. |
Maxwell Agha 160 Thorn Street San Diego, CA 92103 United States |
+1 (619) 230-0330 | maxwell.agha@bhlflaw.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen QCommunications, LLC |
705B SE Melody LN #314 Lee's Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Transition to new assigned channel with reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | ARK1 | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-2000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.2 kW | |
Justification for New Transmitter | New transmitter required in order to transition to new channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Site Prep |
Site preparation for installation of new transmitter |
Shipping |
Shipping cost |
Transmitter Decommissioning |
Harvesting and removal of old transmitter |
Transmitter Shipping fee |
Shipping fees for transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | PSILP16AWR | |
Year | 2001 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Broadband | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | UTVC-01/X BB | |
Year | 2020 | |
Justification for New Antenna | New antenna required for new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 1 5/8 inches inches | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna Shipping fee |
Shipping fees for new antenna |
Antenna Sales Tax |
Sales tax for new antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 350 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personal can maintain and operate the stations daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Engineering - General services |
General engineering services related to the repack transition |
Attorney - General services |
General attorney services related to the repack transition |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $116,000.00 | $132,050.00 | N/A | $83,550.00 | N/A |
Total for all systems | $339,995.85 | $379,465.35 | N/A | $174,175.45 | N/A |
Primary Transmitter TRN-U-2000-FA | $116,000.00 | $132,050.00 | $83,550.00 | ||
Transmitter Shipping fee | $3,500.00 | $3,500.00 | Estimated shipping costs for transmitter. Actual costs to be determined. 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. 4/8/20- Shipped cost determined from Anywave transmitter quote uploaded on 4/1/20 | $0.00 | N/A |
Transmitter Decommissioning | $7,000.00 | $7,000.00 | Estimated costs of harvesting and removal of old transmitter from site. Revised upon Site Survey. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $80,050.00 | Cost determined from Anywave invoice | $80,050.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $30,000.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Site Prep | $8,000.00 | $8,000.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Shipping | $3,500.00 | $3,500.00 | Cost of shipping transmitter. Determined from Anywave invoice | $3,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Shipping fee | |
Transmitter Decommissioning | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Transmitter Building Site Survey/Installation | Information not provided. |
Site Prep | Information not provided. |
Shipping |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $39,660.00 | $39,660.00 | N/A | $22,030.00 | N/A |
Total for all systems | $339,995.85 | $379,465.35 | N/A | $174,175.45 | N/A |
Primary Antenna UTVC-01/X BB | $39,660.00 | $39,660.00 | $22,030.00 | ||
Antenna Sales Tax | $3,000.00 | $3,000.00 | Estimated sales tax for new antenna. Actual costs to be determined. | N/A | N/A |
Elbow complex, single channel, 1 5/8” input (if needed) | $6,900.00 | $6,900.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
UHF-Low Power, Top Mount, Other, 5.0kW input, Horizontal | $22,030.00 | $22,030.00 | Cost determined from invoice. | $22,030.00 | N/A |
Antenna Shipping fee | $2,000.00 | $2,000.00 | Estimated shipping for new antenna. Actual costs to be determined. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Antenna Sales Tax | Information not provided. |
Elbow complex, single channel, 1 5/8” input (if needed) | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
UHF-Low Power, Top Mount, Other, 5.0kW input, Horizontal | |
Antenna Shipping fee |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $175,125.85 | $198,545.35 | N/A | $68,595.45 | N/A |
Total for all systems | $339,995.85 | $379,465.35 | N/A | $174,175.45 | N/A |
Outside Professional Services | $175,125.85 | $198,545.35 | $68,595.45 | ||
Engineering - General services | $10,000.00 | $10,000.00 | Estimated general engineering fees related to the repack transition (MX). Actual costs to be determined. 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | $5,212.80 | N/A |
Attorney - General services | $43,210.85 | $43,210.85 | Estimated general attorney fees related to the repack transition (MX). Actual costs to be determined by invoices. | $43,210.85 | N/A |
Form 399 assistance or other Program Management costs | $13,590.00 | $13,590.00 | Per attached QComm quote. | $9,771.80 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $43,732.00 | Per-attached quote number 735-R for Coverage Verification | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | $0.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $7,900.00 | Estimate of attorney fees for preparation of License. Actual costs to be determined. | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $950.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | $250.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $10,000.00 | Engineering required for displacement application. | $6,700.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Per attached QComm quote. | $2,500.00 | N/A |
Project management of the transition | $36,925.00 | $53,900.00 | Estimated $154/hr x 350 hours. | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Engineering - General services | |
Attorney - General services | |
Form 399 assistance or other Program Management costs | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,210.00 | $9,210.00 | N/A | $0.00 | N/A |
Total for all systems | $339,995.85 | $379,465.35 | N/A | $174,175.45 | N/A |
Other Expenses | $9,210.00 | $9,210.00 | $0.00 | ||
Equipment Storage | $500.00 | $500.00 | Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. | N/A | N/A |
Equipment Delivery and Handling Charges | $1,000.00 | $1,000.00 | Transport, forklift rental and handling fees from staging area to transmitter site. Estimated cost. Actuals to be determined. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | Estimated 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. Actuals to be submitted | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $339,995.85 | $379,465.35 | $174,175.45 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Maxwell Agha CEO 10/15/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Maxwell Agha CEO 10/15/2020 |