Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SPANISH INDEPENDENT BROADCAST NETWORK, LLC Doing Business As: SPANISH INDEPENDENT BROADCAST NETWORK, LLC |
Adrian C. Quinones 5030 E. WARNER RD SUITE 3 PHOENIX, AZ 85044 United States |
+1 (480) 684-3802 | ADRIAN@38IZTV.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Hire engineer to find vacant channel, apply in window, receive CP, buy new transmitter and antenna,hire tower crew, install equipment. All transition work except repack reimbursement was completed with grant of license LMS 0000064022, on 12/13/2018 |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | ATSC 1.5kW DTV TX | |
Year | 2014 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-5X-U-28-C | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.2 kW | |
Justification for New Transmitter | We need a new transmitter because of the need to upgrade from a stringent to a full service emission mask and have special filtering to protect land mobile stations adjacent to Channel 14. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 1.5 kW | |
Manufacturer | ||
Model | JA/MS-12 SHO | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 1.5 kW | |
Manufacturer | ||
Model | AL8-14 | |
Year | 2018 | |
Justification for New Antenna | Moving from Channel 38 to channel 14; the actual antenna we have for channel 38 won't work at channel 14. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
ERI-STD050-52 |
Flex 7/8" Coax extension EIA Flange -6 |
ERI-RLA150-050 |
Reducer EIA 1-5/8" to EIA 7/8" |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 33° 20' 00.1" N- |
Longitude (NAD83) | 112° 03' 47.5" W- | |
Overall Structure Height | 140.00 feet | |
Support Structure Height | 20.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2760.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | A Communications South Mountain L.L.C. | |
Date Constructed | 03/10/1985 |
Facility ID | Call Sign | Service |
---|---|---|
73764 | KPDF-CA | DTV |
20638 | KFLR-FM | FM |
Users |
---|
POINT TO POINT |
INTERNET |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 20 | |
Explanation | Work with frequency coordinator; explore the best choice in transmitter and antennas; get quotes from vendors; submit permits with City of Phoenix to work at towers; coordinate with crew to remove existing antenna and install new at tower. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Engineering services |
Coordinating of permits and clearance to perform disassemble of Channel 38 and install the new channel 14; perform disassemble of Channel 38 transmitter and install and test new transmitter for Channel 14 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $278,760.00 | $32,388.00 | N/A | $26,988.00 | N/A |
Total for all systems | $365,218.83 | $61,714.33 | N/A | $52,457.14 | N/A |
Primary Transmitter TRN-5X-U-28-C | $278,760.00 | $32,388.00 | $26,988.00 | ||
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $27,922.00 | N/A | $22,522.00 | The previous invoice will be deleted, then it will show the right total. Thank you. |
RF Consulting Engineer | $5,260.00 | $4,466.00 | N/A | $4,466.00 | New revised invoice uploaded to comply with the "Need More Information" request. Please delete the old invoice. |
Channel 14 Mask Filter | $189,500.00 | $0.00 | Cost of filter is included in the price of transmitter | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
RF Consulting Engineer | |
Channel 14 Mask Filter |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,233.83 | $5,233.83 | N/A | $5,186.64 | N/A |
Total for all systems | $365,218.83 | $61,714.33 | N/A | $52,457.14 | N/A |
Primary Antenna AL8-14 | $5,233.83 | $5,233.83 | $5,186.64 | ||
ERI-RLA150-050 | $350.00 | $350.00 | N/A | $319.96 | Uploaded new invoice to comply with guidelines, please delete prior invoice. Thank you. |
ERI-STD050-52 | $260.00 | $260.00 | N/A | $242.85 | New invoice was uploaded to comply with guidelines, please remove the wrong invoice. Thank you. |
UHF-Low Power, Side Mount, Slotted Coaxial, 1.5kW input, Horizontal | $4,623.83 | $4,623.83 | N/A | $4,623.83 | The difference is the duplicated invoices. Please remove ERI ONE and ERI TWO invoices, I was asked to upload updated invoices containing specifications of the antenna. |
Actual Information Description | File Name |
---|---|
ERI-RLA150-050 | |
ERI-STD050-52 | |
UHF-Low Power, Side Mount, Slotted Coaxial, 1.5kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $4,800.00 | N/A | $4,800.00 | N/A |
Total for all systems | $365,218.83 | $61,714.33 | N/A | $52,457.14 | N/A |
Primary Tower TOWER | $56,190.00 | $4,800.00 | $4,800.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $4,800.00 | N/A | $4,800.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,752.50 | $9,285.00 | N/A | $5,475.00 | N/A |
Total for all systems | $365,218.83 | $61,714.33 | N/A | $52,457.14 | N/A |
Outside Professional Services | $13,752.50 | $9,285.00 | $5,475.00 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $2,100.00 | More than normal costs were incurred because of need to locate and notify all nearby land mobile facilities in the 450-470 MHz band that might receive interference from Channel 14 at 470-476 MHz. | $2,100.00 | More than normal costs were incurred because of need to locate and notify all nearby land mobile facilities in the 450-470 MHz band that might receive interference from Channel 14 at 470-476 MHz. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,000.00 | N/A | $3,000.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $0.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $0.00 | N/A | $0.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $0.00 | N/A | $0.00 | N/A |
Form 399 assistance or other Program Management costs | $375.00 | $375.00 | N/A | $375.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $0.00 | N/A |
Project management of the transition | $2,110.00 | $2,100.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,282.50 | $10,007.50 | N/A | $10,007.50 | N/A |
Total for all systems | $365,218.83 | $61,714.33 | N/A | $52,457.14 | N/A |
Other Expenses | $11,282.50 | $10,007.50 | $10,007.50 | ||
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | $0.00 | N/A |
Engineering services | $9,837.50 | $9,837.50 | N/A | $9,837.50 | New invoice uploaded with requested information to comply with guidelines. Please delete the old invoice. |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | $170.00 | New copy of receipt from FCC, license to cover filing fee for K14RK-D FID 52892 with EIN from Spanish Independent Broadcast Network. Please delete old receipt. |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Engineering services | |
FCC Filing Fees - Form 2100 license to cover application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $365,218.83 | $61,714.33 | $52,457.14 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Adrian C. Quinones President 08/19/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Adrian C. Quinones President 08/19/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Adrian C. Quinones President 08/19/2020 |