Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
67980
Service:
LPD
Call Sign:
WSHM-LD
Channel:
20 (UHF)
File Number:
0000081759
FRN:
0018223693
Eligibility Status:
Eligible
Date Submitted:
10/11/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

MEREDITH CORPORATION

Doing Business As: MEREDITH CORPORATION

Joshua Pila

1716 LOCUST STREET

DES MOINES, IA 50309

United States

+1 (515) 284-3000 RegAffairs@meredith.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan The station needs to replace antenna/ filter and transmitter due to the channel change.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Elite 100
Year 2007
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 250 W

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model EC702HP-BB
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.7 kW
Justification for New Transmitter Old transmitter was no longer supported and we purchased the EC702 to replace the E100. The E100 had dual power amps and the EC701 at the time had a single power amp rated at the lowest power level of 850 watts. We needed to keep the redundancy.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? No
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring Yes
Size 2 inches
Length 30.0 feet
Other Electrical Service Yes
Description Installation of feeder
HVAC Service Does the replacement transmitter require HVAC Service? No
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Installation and checkout

Commission of transmitter and proof

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 6.0 kW
Manufacturer
Model ALP8L3-HSNR
Year 2007

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 6.0 kW
Manufacturer
Model ALP8M3-HSNR-20
Year 2019
Justification for New Antenna Old antenna was channel dependent

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Antenna tax

Tax in Antenna

Termination

TERMINATION, 1-5/8" 50 OHM FLANGED

Antenna Shipping

Antenna Shipping

Cable assy

Heliax HELIAX, 7/8, 1-5/8"TO DIN,10'L

Reducers

reducer 4 1/16 to 3 1/8 flg w 3 inch anchor

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1007622
Coordinates (NAD83) Latitude (NAD83) 42° 07' 11.6" N-
Longitude (NAD83) 072° 24' 37.3" W-
Overall Structure Height 194.88 feet
Support Structure Height 194.88 feet
Ground Elevation Above Mean Sea Level (AMSL) 810.03 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner R and S Realty, LLC
Date Constructed 01/01/1985


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: No study needed
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Antenna installation

Install antenna in place of current antenna

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Prepare Form 601 No
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 1
Justification review of installation

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $97,402.00 $94,140.00 N/A $93,360.00 N/A
Total for all systems $215,061.65 $155,609.65 N/A $142,117.15 N/A
Primary Transmitter EC702HP-BB $97,402.00 $94,140.00 $93,360.00
Other Electrical Service: Installation of feeder $2,875.00 $2,875.00 N/A $2,875.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $780.00 $780.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $84,000.00 $80,738.00 N/A $80,738.00 N/A
Installation and checkout $9,747.00 $9,747.00 N/A $9,747.00 Updated with correct invoice number and amounts

Components

Actual Information Description File Name
Other Electrical Service: Installation of feeder

Component Description:
100 percent of Electrical installation
Amount:
$2,875.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
95 percent of transmitter cost
Amount:
$76,701.10

Component Description:
5 percent of transmitter
Amount:
$4,036.90
Installation and checkout

Component Description:
Transmitter installation 95 percent invoice
Amount:
$9,259.65

Component Description:
Transmitter installation 5 percent invoice
Amount:
$487.35

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $31,217.15 $31,217.15 N/A $31,217.15 N/A
Total for all systems $215,061.65 $155,609.65 N/A $142,117.15 N/A
Primary Antenna ALP8M3-HSNR-20 $31,217.15 $31,217.15 $31,217.15
Antenna tax $1,474.48 $1,474.48 Tax on Antenna $1,474.48 N/A
Cable assy $689.18 $689.18 Cable Heliax $689.18 N/A
Antenna Shipping $2,253.22 $2,253.22 N/A $2,253.22 N/A
Termination $532.22 $532.22 N/A $532.22 N/A
UHF-Low Power, Side Mount, Slotted Coaxial, 6.0kW input, Horizontal $23,591.75 $23,591.75 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $23,591.75 N/A
Reducers $1,776.30 $1,776.30 Reducer $1,776.30 N/A
Adaptors $900.00 $900.00 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $900.00 N/A

Components

Actual Information Description File Name
Antenna tax

Component Description:
Antenna Tax 100 percent
Amount:
$1,474.48

Component Description:
100 percent of tax on Antenna
Amount:
$1,474.48
Cable assy

Component Description:
Heliax jumper
Amount:
$689.18
Antenna Shipping

Component Description:
Antenna Freight 100 percent
Amount:
$2,253.22

Component Description:
Antenna shipping
Amount:
$2,253.22
Termination

Component Description:
Termination
Amount:
$532.22
UHF-Low Power, Side Mount, Slotted Coaxial, 6.0kW input, Horizontal

Component Description:
100 percent of antenna
Amount:
$23,591.75

Component Description:
Antenna cost 100 percent
Amount:
$23,591.75
Reducers

Component Description:
reducer
Amount:
$1,776.30
Adaptors

Component Description:
Adapters cost
Amount:
$900.00

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $67,940.00 $11,750.00 N/A $11,750.00 N/A
Total for all systems $215,061.65 $155,609.65 N/A $142,117.15 N/A
Primary Tower TOWER $67,940.00 $11,750.00 $11,750.00
Tower Rigging Short Tower (less than 500') $56,190.00 $0.00 N/A N/A N/A
Antenna installation $11,750.00 $11,750.00 Remove Old antenna and install new antenna $11,750.00 N/A

Components

Actual Information Description File Name
Tower Rigging Short Tower (less than 500') Information not provided.
Antenna installation

Component Description:
antenna installation 100 percent
Amount:
$11,750.00

Component Description:
100 percent of work
Amount:
$11,750.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $12,767.50 $12,767.50 N/A $1,500.00 N/A
Total for all systems $215,061.65 $155,609.65 N/A $142,117.15 N/A
Outside Professional Services $12,767.50 $12,767.50 $1,500.00
Additional Field Engineering Service, 1 Days $1,500.00 $1,500.00 Comark additional test day $1,500.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Perform engineering study for displacement application $1,800.00 $1,800.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Prepare/ Review 399 reimbursement form $1,710.00 $1,710.00 N/A N/A N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 1 Days

Component Description:
Consulting onsite
Amount:
$1,500.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for displacement application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare/ Review 399 reimbursement form Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $5,735.00 $5,735.00 N/A $4,290.00 N/A
Total for all systems $215,061.65 $155,609.65 N/A $142,117.15 N/A
Other Expenses $5,735.00 $5,735.00 $4,290.00
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
Equipment Delivery and Handling Charges $4,290.00 $4,290.00 N/A $4,290.00 N/A

Components

Actual Information Description File Name
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Equipment Delivery and Handling Charges

Component Description:
95 percent of shipping and handling
Amount:
$4,075.50

Component Description:
5 percent of shipping
Amount:
$214.50

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $215,061.65 $155,609.65 $142,117.15

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

TOM D CASEY

VP of Technology Meredith LMG


10/11/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

TOM D CASEY

VP of Technology Meredith LMG


10/11/2021

Attachments