Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SCRIPPS BROADCASTING HOLDINGS LLC Doing Business As: SCRIPPS BROADCASTING HOLDINGS LLC |
C/O SCRIPPS MEDIA, INC. 312 WALNUT ST., 28TH FLOOR CINCINNATI, OH 45202 United States |
+1 (513) 977-3000 | DAVE.GILES@SCRIPPS.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Sam Hariton Widelity |
4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | KZCS-LP is moving to a different, existing tower in the same location, which it will share with KOAA (FacID 59014). The station is purchasing a new like-for-like transmitter, like-for-like antenna, and like-for-like transmission line. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SCA 132UB | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 860 W | |
Justification for New Transmitter | Re-tuning the existing main transmitter is not an option because the manufacturer is no longer in business in the United States |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 75.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 50.0 kW | |
Manufacturer | ||
Model | B16UA | |
Year | 2004 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP Series II | |
Year | 2019 | |
Justification for New Antenna | The pre-displacement antenna cannot be retuned to the new channel and the original manufacturer is out of business. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 200 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 0 | |
Length | 250 feet per run | |
Justification for New Transmission Line | With the change of towers and the difference in the distance to the antenna, a new transmission line is needed. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 38° 44' 38.9" N- |
Longitude (NAD83) | 104° 51' 47.7" W- | |
Overall Structure Height | 198.82 feet | |
Support Structure Height | 198.82 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9425.74 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Scripps Broadcasting Holdings LLC | |
Date Constructed | 04/02/2019 |
Facility ID | Call Sign | Service |
---|---|---|
59014 | KOAA-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | KZCS-LP requires the aid of outside project management services. KZCS-LP does not have sufficient resource capacity and expertise in house to handle all of the activities necessary to facility on-time completion of the station's build. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $39,803.00 | $66,866.12 | N/A | $0.00 | N/A |
Total for all systems | $205,227.00 | $259,342.29 | N/A | $15,492.20 | N/A |
Primary Transmitter UAXTE-2 | $39,803.00 | $66,866.12 | $0.00 | ||
1" Rigid Conduit and Wiring | $9,953.00 | $9,953.00 | Please see Main Electric Quote 6236 | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 750 - 1000 Watts | $29,850.00 | $56,913.12 | Please see GatesAir Quote Q-82462 | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $21,387.00 | $21,387.00 | N/A | $0.00 | N/A |
Total for all systems | $205,227.00 | $259,342.29 | N/A | $15,492.20 | N/A |
Primary Antenna ALP Series II | $21,387.00 | $21,387.00 | $0.00 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $15,657.00 | $15,657.00 | Please see ERI Proposal 20190617-860 | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $10,501.53 | N/A | $0.00 | N/A |
Total for all systems | $205,227.00 | $259,342.29 | N/A | $15,492.20 | N/A |
Primary Transmission Line | $0.00 | $10,501.53 | $0.00 | ||
Flexible Air Transmission Line - dielectric, 1 5/8" | $0.00 | $10,501.53 | Please see Dielectric Quote 900236CMZ | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $77,190.00 | $78,627.64 | N/A | $2,750.00 | N/A |
Total for all systems | $205,227.00 | $259,342.29 | N/A | $15,492.20 | N/A |
Primary Tower GTOWER | $77,190.00 | $78,627.64 | $2,750.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $75,877.64 | Please see ThinAir KZCS Antenna Install/Rigging quote | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $2,750.00 | Please see ERI proposal 20190815-450. The tower mapping is necessary because the tower is very close to being at maximum load. Any new or additional load requires a tower study to make sure that the additional weight will not damage the new tower. | $2,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | Information not provided. |
Tower mapping and report for structural engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $45,597.00 | $60,710.00 | N/A | $12,742.20 | N/A |
Total for all systems | $205,227.00 | $259,342.29 | N/A | $15,492.20 | N/A |
Outside Professional Services | $45,597.00 | $60,710.00 | $12,742.20 | ||
Project management of the transition | $26,797.00 | $41,910.00 | Please see Widelity KZCS Strategic Support Quote | $12,067.20 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | Based on FCC's catalog of costs while waiting for official quote | $300.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | Based on FCC's catalog of costs while waiting for official quote | $375.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $21,250.00 | $21,250.00 | N/A | $0.00 | N/A |
Total for all systems | $205,227.00 | $259,342.29 | N/A | $15,492.20 | N/A |
Other Expenses | $21,250.00 | $21,250.00 | $0.00 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $14,540.00 | $14,540.00 | Please see Thin Air Proposal 3268_001_KMGH and Thin Air Proposal 3260_001_KMGH | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | Based on FCC's catalog of costs while waiting for official quote. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | Based on FCC's catalog of costs while waiting for official quote. | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | Based on FCC's catalogue of costs while waiting for official quote | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | Based on FCC's catalog of costs while waiting for official quote. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $205,227.00 | $259,342.29 | $15,492.20 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan Reddy , Reddy . Senior Director, General Accounting 08/12/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan Reddy , Reddy . Senior Director, General Accounting 08/12/2020 |