Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
COCOLA BROADCASTING COMPANIES, LLC Doing Business As: COCOLA BROADCASTING COMPANIES, LLC |
Gary M. Cocola 706 W. HERNDON AVENUE FRESNO, CA 93650 United States |
+1 (559) 269-0425 | garyc@cocolatv.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Station will transition from RF ch 49 to RF ch 14, replace the transmitter and rotate the existing antenna from 270 to 290 degrees per the displacement CP; transition will be completed during the Phase 9 transition ending May 1, 2020. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 834A | |
Year | 1998 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-1000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.4 kW | |
Justification for New Transmitter | Current ITS 834A 1kW transmitter purchased in 1998 is no longer supported and will not operate on RF channel 14. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 10.0 feet | |
Other Electrical Service | Yes | |
Description | Basic electrical installation and wiring. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Contract Installer |
Costs to install the new Anywave transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 12 | |
Design power capacity in use | 80.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
ERP: | 10.3 kW | |
Manufacturer | Scala | |
Model | 6X2KBBU | |
Year | 1998 |
Facility ID | Call Sign |
---|---|
34570 | KSTV-LD |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1033381 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 38' 53.0" N- |
Longitude (NAD83) | 121° 05' 54.3" W- | |
Overall Structure Height | 299.87 feet | |
Support Structure Height | 296.91 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 827.09 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 01/01/1993 |
Facility ID | Call Sign | Service |
---|---|---|
85884 | K255CL | FX |
20354 | KRXQ | FM |
65789 | K04QR-D | LPD |
70676 | KLVB | FM |
334 | K20JX-D | DTV |
34570 | KSTV-LD | LPD |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 80 | |
Explanation | Coordination of equipment order and delivery, installation and contractor management, certification and approval. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | RF channel 14 engineering and field analysis. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $289,760.00 | $97,300.00 | N/A | $83,765.17 | N/A |
Total for all systems | $446,032.50 | $178,485.00 | N/A | $90,615.17 | N/A |
Primary Transmitter TRN-U-1000-FA | $289,760.00 | $97,300.00 | $83,765.17 | ||
Contract Installer | $5,000.00 | $5,000.00 | Contract installation services provide by West Coast Broadcast Services, LLC and Broadcast Engineering Services to install the Anywave transmitter. The Broadcast Engineering Services invoice is pending as of June 18, 2020 why estimate = $5K | $2,465.17 | N/A |
Channel 14 -- Additional field engineering time, 3 days | $3,000.00 | $3,000.00 | Three (3) days filed engineering for additional interference analysis for RF channel 14. | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $0.00 | Channel 14 Mask Filter included in transmitter costs. | N/A | N/A |
RF Consulting Engineer | $5,260.00 | $5,000.00 | Engineering work for move to RF channel 14. | N/A | N/A |
Other Electrical Service: Basic electrical installation and wiring. | $2,500.00 | $2,500.00 | Installation conduit and wiring for new transmitter. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $81,300.00 | Anywave quote for new 1.4kW transmitter and filter | $81,300.00 | N/A |
1" Rigid Conduit and Wiring | $500.00 | $500.00 | Estimated cost for conduit and wiring material. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Contract Installer | |
Channel 14 -- Additional field engineering time, 3 days | Information not provided. |
Channel 14 Mask Filter | Information not provided. |
RF Consulting Engineer | Information not provided. |
Other Electrical Service: Basic electrical installation and wiring. | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
1" Rigid Conduit and Wiring | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,330.00 | $5,500.00 | N/A | $0.00 | N/A |
Total for all systems | $446,032.50 | $178,485.00 | N/A | $90,615.17 | N/A |
Primary Antenna 6X2KBBU | $8,330.00 | $5,500.00 | $0.00 | ||
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $2,600.00 | $0.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,500.00 | Sweep transmission line and antenna after modification per CP to ensure operating efficiently. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $15,000.00 | N/A | $0.00 | N/A |
Total for all systems | $446,032.50 | $178,485.00 | N/A | $90,615.17 | N/A |
Primary Tower GTOWER | $56,190.00 | $15,000.00 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $15,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $89,307.50 | $58,350.00 | N/A | $6,850.00 | N/A |
Total for all systems | $446,032.50 | $178,485.00 | N/A | $90,615.17 | N/A |
Outside Professional Services | $89,307.50 | $58,350.00 | $6,850.00 | ||
Additional Field Engineering Service, 3 Days | $3,000.00 | $3,000.00 | Additional engineering costs associated with move to RF channel 14. | N/A | N/A |
RF Exposure Measurements | $12,100.00 | $10,000.00 | Engineering costs for RF interference measurements | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $25,000.00 | Estimated cost for interference analysis for RF channel 14 | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,500.00 | File LTC application. | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $2,500.00 | Attorney fees to prepare and file CP application for RF channel 14 | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,750.00 | Engineering for RF 14 displacement application | N/A | N/A |
Form 399 assistance or other Program Management costs | $1,900.00 | $1,900.00 | Prepare 399 Eligibility and Broadcaster Relocation documents | $1,900.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,700.00 | Prepare, review and submit 399 form for reimbursement. | $1,600.00 | N/A |
Project management of the transition | $8,440.00 | $8,000.00 | Project management costs for coordination of the move from RF channel 49 to RF channel 14 | $3,350.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,000.00 | Prepare engineering section of LTC application | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,000.00 | Prepare engineering section of CP application | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 3 Days | Information not provided. |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,445.00 | $2,335.00 | N/A | $0.00 | N/A |
Total for all systems | $446,032.50 | $178,485.00 | N/A | $90,615.17 | N/A |
Other Expenses | $2,445.00 | $2,335.00 | $0.00 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | Removal and disposal of older transmission equipment being replaced as part of this transition to RF channel 14 | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,000.00 | CP application fees | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $446,032.50 | $178,485.00 | $90,615.17 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 06/18/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 06/18/2020 |