Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Capitol Broadcasting Company, Inc. |
Chrissy Cicuto 2619 Western Blvd Raleigh, NC 27606 United States |
+1 (919) 821-8730 | ccicuto@cbc-raleigh.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Peter Sockett Director of Engineering and Operations Capitol Broadcasting Company |
Pete Sockett 2619 Western Blvd Raleigh, NC 27606 United States |
+1 (919) 821-8573 | psockett@wral.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | All 4 broadcasters will need to replace antennas on the candelabra. The transition plan for WRAL / WRAZ is to replace the existing Aux antenna with a single ch15 / 17 slot antenna at approx 1720ft (524m) to use as both the new AUX and interim facility. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CD2400P4 | |
Year | 1999 | |
Type | Inductive Output Tube | |
IOT Power Type | Other | |
Other IOT Power Type | 4 tube system | |
Power Capacity | 100 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTED-120 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 76.0 kW | |
Justification for New Transmitter | 1) Manufacturer (Gates Air) will not support channel changes to this model of transmitter. 2) Comark estimate for IOT transmitter is higher than a solid State transmitter from GatesAir |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 400.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 15 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1600.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Spare Modules and Power supplies |
Currently we keep 1 spare IOT tube on hand in the event of a failure. This purchases spare parts for Solid State TX |
RF System |
Magic T / Mask filter / Dummy load and RF Line for Installation |
System installation |
Manufacturer to come to site to install and commission. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Auxilary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 36 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 674.00 MHz | |
Upper Limit | 710.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ETU-P3H12-(48-53) | |
Year | 2008 |
Facility ID | Call Sign |
---|---|
64611 | WRAZ |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | Interim Facility and Auxiliary (Backup) | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 805.0 kW | |
Manufacturer | ||
Model | ATW25H3-ESO-15/17H | |
Year | 2018 | |
Justification for New Antenna | This antenna will serve as both an Interim facility while the candelabra is rebuilt and will replace the existing AUX antenna already in service for both WRAL and WRAZ |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 476.0 MHz - 494.0 MHz | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ATW25H5-ETO-48H | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 533.0 kW | |
Manufacturer | ||
Model | ATW25H4-ETO-17H | |
Year | 2018 | |
Justification for New Antenna | Required as old antenna is cut for channel 48 |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Auxiliary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1738 feet per run |
Facility ID | Call Sign |
---|---|
64611 | WRAZ |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | Auxiliary (Backup) and Interim Facility | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2013 feet per run | |
Justification for New Transmission Line | Required to feed new Aux / Interim antenna. Cost will be split with WRAZ. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Diameter | N/A | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2210 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2210 feet per run | |
Justification for New Transmission Line | Existing run is GLW 1500 Waveguide that is frequency specific for High Band UHF |
Name | Description |
---|---|
Gas Barrier |
The transmission line Gas Barrier enables the transmission line to be pressurized. |
2 Wall feed through units |
The two listed wall feed thru units are for the transmission line as it goes through the wall to the outside of the transmitter building. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1027322 | |
Coordinates (NAD83) | Latitude (NAD83) | 35° 40' 29.0" N- |
Longitude (NAD83) | 078° 31' 39.0" W- | |
Overall Structure Height | 1988.82 feet | |
Support Structure Height | 1988.82 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 359.90 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | CBC REAL ESTATE COMPANY, INC. | |
Date Constructed | 03/23/2000 |
Facility ID | Call Sign | Service |
---|---|---|
50782 | WNCN | DTV |
64611 | WRAZ | DTV |
73205 | WLFL | DTV |
73936 | WTKK | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Relocate ENG Dish |
Relocate 2 ENG receive dishes to create room for Interim / Aux antennas - Split with WRAZ |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 286 | |
Explanation | WRAL/WRAZ has only one engineer currently available at the TX site. Additional project management is necessary. The estimate is an average of 20 hrs per month for Jan - November of 2019. Note: post Phase 5 the candelabra still needs to be rebuilt. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | Independent verification and inspection of installed systems |
Name | Description |
---|---|
Legal Guidance for repack |
Consultation on repack items with Legal Council |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Facilty remote control and monitoing modifications |
Modifications to existing system to add new telemetry and control. |
Sigma Transmitter and RF System removal |
Complete removal of old WRAL Sigma IOT transmitter and related RF system. Properly dispose of all hazardous liquids and materials. |
Unexpected Site Modifications |
Site modifications to allow for continuation of antenna installations due to weather. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,254,275.00 | $3,121,278.00 | N/A | $3,079,303.62 | N/A |
Total for all systems | $6,549,016.65 | $6,101,513.65 | N/A | $5,388,067.28 | N/A |
Primary Transmitter ULXTED-120 | $3,254,275.00 | $3,121,278.00 | $3,079,303.62 | ||
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $1.00 | Included in overall TX price | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 76.0 kW | $2,214,634.00 | $2,214,634.00 | Includes all TX cost - RF System, installation and electrical (transformer). Freight Charges Also | $2,214,618.29 | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $40,400.00 | $1.00 | Included in overall building estimate | $0.00 | N/A |
Spare Modules and Power supplies | $35,000.00 | $35,000.00 | N/A | N/A | N/A |
RF System | $1.00 | $1.00 | Included in overall TX price | N/A | N/A |
System installation | $1.00 | $1.00 | Included in overall TX price | N/A | N/A |
Other -- Building Addition Size: 1600.0 | $871,639.00 | $871,639.00 | Our facility is full with no room to install new equipment before old equipment is removed. This facility will be shared with WRAZ. This is 1/2 the cost, other half will be represented on WRAZ. Please see "building cost narrative" recently uploaded. | $864,685.33 | New estimate was uploaded April 18th for approval. |
15 Ton system | $55,800.00 | $1.00 | Included in overall building estimate | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transformer 3 phase/480v - 300 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 76.0 kW | |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Spare Modules and Power supplies | Information not provided. |
RF System | Information not provided. |
System installation | Information not provided. |
Other -- Building Addition Size: 1600.0 | |
15 Ton system | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $585,920.00 | $561,600.00 | N/A | $422,980.40 | N/A |
Total for all systems | $6,549,016.65 | $6,101,513.65 | N/A | $5,388,067.28 | N/A |
Primary Antenna ATW25H4-ETO-17H | $310,130.00 | $294,600.00 | $236,125.00 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,250.00 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,900.00 | $13,200.00 | N/A | $0.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $275,000.00 | N/A | $229,875.00 | N/A |
Auxiliary Antenna ATW25H3-ESO-15/17H | $275,790.00 | $267,000.00 | $186,855.40 | ||
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | $18,950.00 | $17,800.00 | This antenna is a "combined antenna" the other 1/2 of the cost is shared with WRAZ | $17,737.04 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $11,000.00 | 1/2 split with WRAZ | $7,425.00 | This Covers both WRAL and WRAZ combined AUX system |
Sweep test of existing antenna | $6,730.00 | $3,200.00 | 1/2 split with WRAZ | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 805 kW input, elliptically or circularly polarized | $137,500.00 | $137,500.00 | This antenna is a "combined antenna" the other 1/2 of the cost is shared with WRAZ | $129,733.85 | This covers cost for both WRAL and WRAZ AUX combined antenna ststem |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $2,500.00 | 1/2 split with WRAZ | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $95,000.00 | Interim (AUX) antenna will support full power from each station (WRAL and WRAZ) requiring larger sized combiner. | $31,959.51 | This is for Both WRAL and WRAZ interim / aux antenna system |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Sweep test of existing antenna | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 805 kW input, elliptically or circularly polarized | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
New combiner, cost per channel (without antenna) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,445,182.65 | $1,022,995.65 | N/A | $841,158.54 | N/A |
Total for all systems | $6,549,016.65 | $6,101,513.65 | N/A | $5,388,067.28 | N/A |
Primary Transmission Line | $641,995.65 | $641,995.65 | $581,709.49 | ||
2 Wall feed through units | $703.80 | $703.80 | No Predetermined Cost Estimate | $703.80 | N/A |
Gas Barrier | $391.85 | $391.85 | No Predetermined cost estimate | $391.85 | N/A |
Rigid Transmission Line - copper, 7 3/16" | $640,900.00 | $640,900.00 | N/A | $580,613.84 | N/A |
Auxiliary Transmission Line | $803,187.00 | $381,000.00 | $259,449.05 | ||
Rigid Transmission Line - copper, 8 3/16" broadband | $803,187.00 | $381,000.00 | This represents 1/2. WRAZ will cover the other 1/2 | $259,449.05 | This covers both WRAL main and the WRAL/WRAZ combined AUX antenna systems |
Actual Information Description | File Name |
---|---|
2 Wall feed through units | |
Gas Barrier | |
Rigid Transmission Line - copper, 7 3/16" | |
Rigid Transmission Line - copper, 8 3/16" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $967,300.00 | $1,183,091.00 | N/A | $964,905.04 | N/A |
Total for all systems | $6,549,016.65 | $6,101,513.65 | N/A | $5,388,067.28 | N/A |
Primary Tower TOWER | $967,300.00 | $1,183,091.00 | $964,905.04 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $637,791.00 | Estimated cost is $216,791.00 over predetermined cost estimate due to unexpected rigging cost and overages for antenna installation. | $616,855.04 | N/A |
Relocate ENG Dish | $25,000.00 | $25,000.00 | This is 1/2 of the cost - other half will be covered by WRAZ | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $158,000.00 | N/A | N/A | N/A |
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $19,000.00 | N/A | $4,750.00 | N/A |
Tower Helicopter Lift | $343,300.00 | $343,300.00 | No predetermined cost available. | $343,300.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Relocate ENG Dish | Information not provided. |
Minor tower reinforcement/modifications | Information not provided. |
Structural engineering tower load study for a documented tower with candelabra | |
Tower Helicopter Lift |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $205,918.00 | $129,938.00 | N/A | $64,949.03 | N/A |
Total for all systems | $6,549,016.65 | $6,101,513.65 | N/A | $5,388,067.28 | N/A |
Outside Professional Services | $205,918.00 | $129,938.00 | $64,949.03 | ||
Legal Guidance for repack | $14,000.00 | $14,000.00 | N/A | $9,239.75 | N/A |
Additional Field Engineering Service, 3 Days | $6,500.00 | $6,500.00 | Estimating $2000 per day for an independent verification of the new transmission systems | $6,500.00 | N/A |
RF Exposure Measurements | $21,050.00 | $2,500.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $30,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $500.00 | N/A | $0.00 | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | $1,000.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | $875.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $5,375.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $45,188.00 | $45,188.00 | N/A | $41,959.28 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Legal Guidance for repack | |
Additional Field Engineering Service, 3 Days | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
ASR modification (prepare FCC Form 854) | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $90,421.00 | $82,611.00 | N/A | $14,770.65 | N/A |
Total for all systems | $6,549,016.65 | $6,101,513.65 | N/A | $5,388,067.28 | N/A |
Other Expenses | $90,421.00 | $82,611.00 | $14,770.65 | ||
Unexpected Site Modifications | $1,000.00 | $1,000.00 | N/A | $1,000.00 | N/A |
Sigma Transmitter and RF System removal | $40,000.00 | $40,000.00 | Received formal quote for old WRAL IOT transmitter removal from Chuck Britt & Associates totaling $40,000.00 | N/A | N/A |
Facilty remote control and monitoing modifications | $4,836.00 | $4,836.00 | N/A | $4,836.00 | N/A |
MVPD Notification of Channel Change | $1,250.00 | $1,250.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $4,600.00 | $4,600.00 | No Predetermined Cost Estimate | $259.84 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | N/A | $2,833.66 | N/A |
Non-zoning permits | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Local Zoning | $5,850.00 | $5,850.00 | Wake County NC Commercial Building Permit for New Building Addition. | $5,841.15 | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,750.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Unexpected Site Modifications | |
Sigma Transmitter and RF System removal | Information not provided. |
Facilty remote control and monitoing modifications | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
Local Zoning | |
DTV Medical Facility Notification | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $6,549,016.65 | $6,101,513.65 | $5,388,067.28 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Craig Stephen Turner Project Engineer 07/09/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Craig Stephen Turner Project Engineer 07/09/2020 |