Facility ID:
61703
Service:
LPD
Call Sign:
WSWF-LD
Channel:
29 (UHF)
File Number:
0000089913
FRN:
0028381564
Eligibility Status:
Eligible
Date Submitted:
08/14/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

MAJOR MARKET BROADCASTING OF FLORIDA, INC.

Doing Business As: MAJOR MARKET BROADCASTING OF FLORIDA, INC.

Ravi Kapur

2118 WALSH AVENUE

SUITE 208

SANTA CLARA, CA 95050

United States

+1 (415) 886-7284 FCC@Chicago22.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Tony zumMallen

Anywave Communication Technologies

Tony zumMallen

300 Knightsbridge Parkway, Suite 150

Suite 1011

Lincolnshire, IL 60069

United States

+1 (816) 882-5600 tony.zummallen@anywavecom.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace the transmitter, line and antenna per the channel reassignment with reasonable and customary engineering and business practices.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Unknown
Year 2015
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1.5 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TRN-U-2000-FA
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 2 kW
Justification for New Transmitter New transmitter required for new channel.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? Yes
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring No
Other Electrical Service Yes
Description Other electrical service required to accommodate new transmitter and associated equipment in existing facility.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter Shipping fee

Shipping fees for new transmitter

Transmitter Taxes

Sales tax for new transmitter

Site Prep

Preparation of site for new transmitter

Transmitter Decommissioning

Harvesting and removal of old transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Middle
Polarization Horizontal
Type Slotted Coaxial
ERP: 15.0 kW
Manufacturer
Model SWLP16OI
Year 2015

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Top Mount
Antenna position in stack Middle
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 4
Number of Panels/Bays 2
Lower Limit 560.00 MHz
Upper Limit 566.00 MHz
Design power capacity in use 100.0 %
ERP: 5.0 kW
Manufacturer
Model 4x2 750 10325
Year 2020
Justification for New Antenna New antenna required for new transmitter.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 1 5/8 inches inches
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes
Power Dividers Does the panel antenna require power dividers? No
Cable Harness Does the panel antenna require cable harness? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Antenna Sales Tax

Sales tax for new antenna

Antenna Shipping fee

Shipping fees for new antenna

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 300 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Foam
Diameter Other
Other Diameter 3 inches
Number of parallel runs 1
Length 400 feet per run
Justification for New Transmission Line New line needed for new channel in order to mate new transmitter to new antenna.
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? No

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission line taxes

Sales tax for line

Transmission line shipping

Shipping for line

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1034290
Coordinates (NAD83) Latitude (NAD83) 28° 34' 07.8" N-
Longitude (NAD83) 081° 13' 53.8" W-
Overall Structure Height 359.90 feet
Support Structure Height 359.90 feet
Ground Elevation Above Mean Sea Level (AMSL) 73.16 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Lovelace Tower, Inc.
Date Constructed 03/11/2005

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
146555 W278CN FX
196508 WUOH-LP FL
70415 WZXZ-CD DTV
138970 W228BK FX
10549 WRCF-CD DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Tower mapping and report for structural engineer
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 150
Explanation Required to assist in the turnkey management of the channel relocation project in order that the existing internal personal can maintain and operate the stations daily operational requirements and plans.
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Attorney - General services

General attorney fees related to repack

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $155,650.00 $165,650.00 N/A $0.00 N/A
Total for all systems $582,510.00 $600,575.00 N/A $81,157.20 N/A
Primary Transmitter TRN-U-2000-FA $155,650.00 $165,650.00 $0.00
Transmitter Decommissioning $4,500.00 $4,500.00 Estimated costs of harvesting and removal of old transmitter from site. Revised upon Site Survey. N/A N/A
Other Electrical Service: Other electrical service required to accommodate new transmitter and associated equipment in existing facility. $20,000.00 $20,000.00 Estimate of other electrical service required to accommodate new transmitter and associated equipment in existing facility. Actual costs to be determined. N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $84,000.00 $84,000.00 N/A N/A N/A
Transmitter Building Site Survey/Installation $10,000.00 $20,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Site Prep $6,000.00 $6,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Transmitter Taxes $8,400.00 $8,400.00 Estimated sales tax collected by vendors as part of the repack. Actual costs to be determined. N/A N/A
5 Ton system $20,250.00 $20,250.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Transmitter Shipping fee $2,500.00 $2,500.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $65,245.00 $65,245.00 N/A $44,115.00 N/A
Total for all systems $582,510.00 $600,575.00 N/A $81,157.20 N/A
Primary Antenna 4x2 750 10325 $65,245.00 $65,245.00 $44,115.00
Antenna Shipping fee $2,250.00 $2,250.00 Estimated shipping costs for antenna. Actual costs to be determined. $2,250.00 N/A
Antenna Sales Tax $2,000.00 $2,000.00 Estimated sales tax collected by vendors as part of the repack. Actual costs to be determined. N/A N/A
Elbow complex, single channel, 1 5/8” input (if needed) $6,900.00 $6,900.00 N/A N/A N/A
UHF-Low Power, Top Mount, Broadband Panel, 2 bay, 5.0kW input, Elliptical $48,365.00 $48,365.00 Actual cost from invoice from Kathrein Broadcast USA, Inc. $41,865.00 Actual invoice uploaded.
Sweep test of transmission line and antenna $5,730.00 $5,730.00 N/A N/A N/A

Components

Actual Information Description File Name
Antenna Shipping fee

Component Description:
Freight cost
Amount:
$2,250.00
Antenna Sales Tax Information not provided.
Elbow complex, single channel, 1 5/8” input (if needed) Information not provided.
UHF-Low Power, Top Mount, Broadband Panel, 2 bay, 5.0kW input, Elliptical

Component Description:
Cost for horizontal pol minus the elliptical upgrade
Amount:
$41,865.00
Sweep test of transmission line and antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $28,600.00 $28,600.00 N/A $27,600.00 N/A
Total for all systems $582,510.00 $600,575.00 N/A $81,157.20 N/A
Primary Transmission Line $28,600.00 $28,600.00 $27,600.00
Flexible Foam Transmission Line - 3" 1 parallel runs 400 feet $25,350.00 $25,350.00 Per attached quote from Kathrein Broadcast USA, Inc. $25,350.00 N/A
Transmission line shipping $2,250.00 $2,250.00 Cost determined by invoice from Kathrein Broadcast USA, Inc. $2,250.00 N/A
Transmission line taxes $1,000.00 $1,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A

Components

Actual Information Description File Name
Flexible Foam Transmission Line - 3" 1 parallel runs 400 feet

Component Description:
400ft 3'' Airline
Amount:
$25,350.00
Transmission line shipping

Component Description:
Freight cost
Amount:
$2,250.00
Transmission line taxes Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $177,190.00 $177,190.00 N/A $0.00 N/A
Total for all systems $582,510.00 $600,575.00 N/A $81,157.20 N/A
Primary Tower TOWER $177,190.00 $177,190.00 $0.00
Tower mapping and report for structural engineer $21,000.00 $21,000.00 N/A N/A N/A
Tower Rigging Short Tower (less than 500') $56,190.00 $56,190.00 N/A N/A N/A
Minor tower reinforcement/modifications $100,000.00 $100,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $143,115.00 $151,180.00 N/A $9,442.20 N/A
Total for all systems $582,510.00 $600,575.00 N/A $81,157.20 N/A
Outside Professional Services $143,115.00 $151,180.00 $9,442.20
Attorney - General services $50,000.00 $50,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Comprehensive coverage verification via field study, if needed $52,600.00 $52,600.00 N/A $900.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $2,235.00 $2,235.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $3,262.50 $3,262.50 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Prepare Form 601 $755.00 $755.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Prepare/ Review 399 reimbursement form $1,710.00 $2,500.00 Per attached Anywave quote. $2,500.00 N/A
Project management of the transition $15,825.00 $23,100.00 Estimate 150 hours at $154/hr N/A N/A
Perform engineering study for displacement application $1,800.00 $1,800.00 N/A $1,800.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Form 399 assistance or other Program Management costs $5,890.00 $5,890.00 Per attached Anywave quote. $4,242.20 N/A
Prepare request for Special Temporary Authorization $1,280.00 $1,280.00 N/A N/A N/A

Components

Actual Information Description File Name
Attorney - General services Information not provided.
Comprehensive coverage verification via field study, if needed

Component Description:
Antenna and Pattern Shape study
Amount:
$750.00

Component Description:
Pattern study
Amount:
$150.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare Form 601 Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare/ Review 399 reimbursement form

Component Description:
399 Submittal, These are flat fees as indicated in the invoice.
Amount:
$2,500.00
Project management of the transition Information not provided.
Perform engineering study for displacement application

Component Description:
Alternative Channel Search for WSWF
Amount:
$1,650.00

Component Description:
Displacement study discussion
Amount:
$150.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Form 399 assistance or other Program Management costs

Component Description:
Form 399 Assistance, These are flat fees as indicated in the invoices.
Amount:
$500.00

Component Description:
Pm 399 follow up work for REPACK
Amount:
$1,709.40

Component Description:
PM follow up work for 399 REPACK
Amount:
$2,032.80
Prepare request for Special Temporary Authorization Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $12,710.00 $12,710.00 N/A $0.00 N/A
Total for all systems $582,510.00 $600,575.00 N/A $81,157.20 N/A
Other Expenses $12,710.00 $12,710.00 $0.00
Equipment Storage $2,000.00 $2,000.00 Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $2,000.00 $2,000.00 Estimated 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. Actual costs to be determined. N/A N/A
FCC Filing Fees - Special Temporary Authorization request $305.00 $305.00 N/A N/A N/A
FCC Filing Fees - Form 2100 Major change CP application $4,960.00 $4,960.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
Equipment Delivery and Handling Charges $2,000.00 $2,000.00 Estimated transport, forklift rental and handling fees from staging area to transmitter site. Actuals to be determined. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $582,510.00 $600,575.00 $81,157.20

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Deepti Dawar

Project Manager


08/14/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Deepti Dawar

Project Manager


08/14/2020