Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
DIGITAL NETWORKS-SOUTHEAST, LLC Doing Business As: DIGITAL NETWORKS-SOUTHEAST, LLC |
PO Box 11409 Chattanooga, TN 37401 United States |
+1 (423) 468-5100 | tim@reachhighmedia.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony Zummallen Anywave Communication Technologies |
Tony Zummallen 300 Knightsbridge Parkway Suite 150 Lincolnshire, IL 60069 United States |
+1 (816) 882-5600 | tony.zummallen@anywavecom.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace the transmitter, line and antenna per the channel relocation project using reasonable and customary engineering and business practices |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TMU-9 | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | .6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-1000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.1 kW | |
Justification for New Transmitter | 12-bay antenna instead of 16-bay antenna. Channel relocation project requires higher TPO |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Shipping |
Estimated shipping |
Taxes |
Estimated taxes not included on quote |
Decommission |
Estimated costs to decommission old transmitter |
Transmitter Site Prep |
Estimated costs to prepare site for transmitter installation crew |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP16L2-HSOC | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | PSILP12AW-36 | |
Year | 2019 | |
Justification for New Antenna | New antenna required for new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Taxes |
Estimated sales tax |
Shipping |
Estimated shipping |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 75 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 75 feet per run | |
Justification for New Transmission Line | Replacing old air filled coax with foam filled coax to eliminate pressurizer | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
Shipping |
Estimated shipping costs |
Taxes |
Estimated taxes |
Line connectors |
Connectors for transmission line ends |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 35° 35' 22.9" N- |
Longitude (NAD83) | 082° 40' 25.9" W- | |
Overall Structure Height | 98.00 feet | |
Support Structure Height | 98.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3570.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Western Carolina Radio Hi Top Mtn | |
Date Constructed | 01/01/2019 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operated the stations daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $138,150.00 | $153,150.00 | N/A | $40,863.00 | N/A |
Total for all systems | $357,140.55 | $382,630.55 | N/A | $61,091.65 | N/A |
Primary Transmitter TRN-U-1000-FA | $138,150.00 | $153,150.00 | $40,863.00 | ||
5 Ton system | $20,250.00 | $20,250.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $84,000.00 | N/A | $39,915.00 | N/A |
Decommission | $6,000.00 | $6,000.00 | Estimated costs to deinstall, disconnect and decommission old transmitter. | N/A | N/A |
Transmitter Site Prep | $7,000.00 | $7,000.00 | Estimated costs to prepare site for installation crew. Includes receiving and inventory of transmitter and its components; pre-assembly of cabinets and subassemblies; ensuring site has all materials ready for arrival of installation crew. | N/A | N/A |
Taxes | $8,400.00 | $8,400.00 | Estimated sales tax. Actual sales tax to be determined. | N/A | N/A |
Shipping | $2,500.00 | $2,500.00 | Estimated shipping costs. Actual costs to be determined. | $948.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $25,000.00 | Estimated costs for site survey and transmitter installation. Revised upon Site Survey. | N/A | N/A |
Actual Information Description | File Name |
---|---|
5 Ton system | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Decommission | Information not provided. |
Transmitter Site Prep | Information not provided. |
Taxes | Information not provided. |
Shipping | |
Transmitter Building Site Survey/Installation | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,793.59 | $25,793.59 | N/A | $13,053.35 | N/A |
Total for all systems | $357,140.55 | $382,630.55 | N/A | $61,091.65 | N/A |
Primary Antenna PSILP12AW-36 | $25,793.59 | $25,793.59 | $13,053.35 | ||
Shipping | $578.59 | $578.59 | Estimated shipping costs. Actual costs to be determined. | $578.59 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 5.0kW input, Horizontal | $13,860.00 | $13,860.00 | N/A | $12,474.76 | N/A |
Taxes | $1,000.00 | $1,000.00 | Estimated sales tax not included on quote. Actual costs to be determined. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Shipping | |
Sweep test of transmission line and antenna | Information not provided. |
Side Mount antenna brackets | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 5.0kW input, Horizontal | |
Taxes | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,906.96 | $3,906.96 | N/A | $1,907.80 | N/A |
Total for all systems | $357,140.55 | $382,630.55 | N/A | $61,091.65 | N/A |
Primary Transmission Line | $3,906.96 | $3,906.96 | $1,907.80 | ||
Taxes | $800.00 | $800.00 | Estimated sales tax on purchase of transmission line. Actual costs to be determined. | N/A | N/A |
Flexible Foam Transmission Line - dielectric, 1 5/8" | $1,800.00 | $1,800.00 | N/A | $678.00 | N/A |
Shipping | $500.00 | $500.00 | Estimated shipping costs. Actual costs to be determined. | $422.84 | N/A |
Line connectors | $806.96 | $806.96 | Per attached PSI line quote. | $806.96 | N/A |
Actual Information Description | File Name |
---|---|
Taxes | Information not provided. |
Flexible Foam Transmission Line - dielectric, 1 5/8" | |
Shipping | |
Line connectors |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $77,190.00 | $77,190.00 | N/A | $1,000.00 | N/A |
Total for all systems | $357,140.55 | $382,630.55 | N/A | $61,091.65 | N/A |
Primary Tower TOWER | $77,190.00 | $77,190.00 | $1,000.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $56,190.00 | N/A | $1,000.00 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | |
Tower mapping and report for structural engineer | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $98,390.00 | $108,880.00 | N/A | $4,267.50 | N/A |
Total for all systems | $357,140.55 | $382,630.55 | N/A | $61,091.65 | N/A |
Outside Professional Services | $98,390.00 | $108,880.00 | $4,267.50 | ||
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $1,267.50 | N/A |
Form 399 assistance or other Program Management costs | $5,890.00 | $5,890.00 | Per Line 200001.01 and 200003.01 on attached Anywave quote PR1910-0533 | $500.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Required to assist in the 399 form preparation in order that the existing internal personnel can maintain and operate the stations daily operational requirements and plans. Per Line 200002.01 of attached Anywave proposal PR1910-0533 | $2,500.00 | N/A |
Project management of the transition | $21,100.00 | $30,800.00 | Estimated 200 hours at $154/hour | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,710.00 | $13,710.00 | N/A | $0.00 | N/A |
Total for all systems | $357,140.55 | $382,630.55 | N/A | $61,091.65 | N/A |
Other Expenses | $13,710.00 | $13,710.00 | $0.00 | ||
Equipment Storage | $2,500.00 | $2,500.00 | Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate from 6-24 months of storage time. | N/A | N/A |
Equipment Delivery and Handling Charges | $2,500.00 | $2,500.00 | Transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $357,140.55 | $382,630.55 | $61,091.65 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tim Hurley Chief Engineer 07/06/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tim Hurley Chief Engineer 07/06/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tim Hurley Chief Engineer 07/06/2020 |