Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
AUGUSTANA COLLEGE Doing Business As: AUGUSTANA COLLEGE |
Jay Pearce 639 38TH STREET ROCK ISLAND, IL 61201 United States |
+1 (309) 794-7500 | jaypearce@wvik.org | Private Not-for-Profit Educational Institution |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | With partial local funding & to serve our community better during times of disaster, WVIK took the opportunity during the repack to develop and build an auxiliary facility on the campus of our licensee on an existing tower near our main broadcast studio. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NV40 | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Hybrid | |
Solid State Power Capacity | 40 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | VS300-N | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Analog | |
Solid State Power capacity | 300 W | |
Justification for New Transmitter | We purchased this item for the dual purpose of being able to continue to broadcast during the repack and as part of our larger commitment to our community of providing service during disasters and extreme weather. | |
Does the transmitter require the purchase of a new HD Importer? | No | |
Does the transmitter require the purchase of a new HD Exporter? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | Does the transmitter installation require an Additional Exciter? | No |
Does the transmitter installation require any additional transmitter installation costs? | Yes | |
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Other Transmitter-Related Expenses | Does the replacement transmitter require a Remote Control? | No |
Does the replacement transmitter require an RDS Encoder? | No | |
Does the replacement transmitter require Audio Processing? | No |
Name | Description |
---|---|
Transmitter |
Transmitter Electric Supply and Misc Parts |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | 4 Bay FM | |
ERP: | 31.0 W | |
Manufacturer | ||
Model | BESP-4AC | |
Year | 1991 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | 2 Bay Low Power FM | |
ERP: | 815.0 W | |
Manufacturer | ||
Model | 100A | |
Year | 2018 | |
Justification for New Antenna | There was no antenna for the transmitter that we are using for our auxiliary location. The tower and facility was available to us at no cost because it is owned by our licensee. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Gray Miller Persch LLP |
Broadcast Attorneys |
Doug Vernier |
Telecommunications Consultant |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $78,650.00 | $2,304.00 | N/A | $2,303.80 | N/A |
Total for all systems | $155,045.00 | $8,649.00 | N/A | $8,648.51 | N/A |
Primary Transmitter VS300-N | $78,650.00 | $2,304.00 | $2,303.80 | ||
Air Cooled Solid State FM Transmitter 300 - 500 Watts Analog | $8,150.00 | $0.00 | Paid for by another funder | $0.00 | N/A |
Transmitter | $0.00 | $0.00 | received funding from another source | $0.00 | N/A |
Transmitter Installation | $70,500.00 | $2,304.00 | Electric supply to transmitter and related misc parts not paid for by other funding sources. | $2,303.80 | N/A |
Actual Information Description | File Name |
---|---|
Air Cooled Solid State FM Transmitter 300 - 500 Watts Analog | Information not provided. |
Transmitter | Information not provided. |
Transmitter Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,985.00 | $1,685.00 | N/A | $1,684.71 | N/A |
Total for all systems | $155,045.00 | $8,649.00 | N/A | $8,648.51 | N/A |
Primary Antenna 100A | $2,985.00 | $1,685.00 | $1,684.71 | ||
Antenna | $1,685.00 | $1,685.00 | Mount of new antenna and misc parts | $1,684.71 | N/A |
Low Power 200 Watt - 1000 Watt Circularly-polarized | $1,300.00 | $0.00 | Paid for by another funder | N/A | N/A |
Actual Information Description | File Name |
---|---|
Antenna | |
Low Power 200 Watt - 1000 Watt Circularly-polarized | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $72,875.00 | $4,660.00 | N/A | $4,660.00 | N/A |
Total for all systems | $155,045.00 | $8,649.00 | N/A | $8,648.51 | N/A |
Outside Professional Services | $72,875.00 | $4,660.00 | $4,660.00 | ||
Doug Vernier | $4,036.00 | $4,036.00 | Engineering provided by consultant. | $4,036.00 | N/A |
Gray Miller Persch LLP | $624.00 | $624.00 | Legal services required. | $624.00 | N/A |
RF Exposure Measurements | $12,100.00 | $0.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $0.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $0.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Doug Vernier | |
Gray Miller Persch LLP | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $535.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $155,045.00 | $8,649.00 | N/A | $8,648.51 | N/A |
Other Expenses | $535.00 | $0.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $200.00 | $0.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $155,045.00 | $8,649.00 | $8,648.51 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Colleen Sibthorp Director of Finance and Membership 05/26/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Colleen Sibthorp Director of Finance and Membership 05/26/2020 |