Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
13960
Service:
DTV
Call Sign:
WISE-TV
Channel:
34 (UHF)
File Number:
0000027871
FRN:
0018223693
Date Submitted:
05/22/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WPTA LICENSE, LLC

Doing Business As: WPTA LICENSE, LLC

Brady Dreasler

P.O. BOX 909

QUINCY, IL 62306

United States

+1 (217) 223-5100 BDREASLER@QUINCYMEDIA.COM Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Tony zumMallen

QCommunications, LLC

Tony zumMallen

705B SE Melody LN #314

Lees Summit, MO 64063

United States

+1 (816) 729-1177 tony@qcom1.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan To transition from ch 18 to ch 34, tests by Resonant Results, LTD say ANT and TX line can be retuned. New TX and associated systems are needed. An interim system (ant, TX and line) is required. Combiner needed to share with WPTA.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma
Year 1998
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 21.1 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-60
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 38 kW
Justification for New Transmitter Transmitter is not tunable per the manufacturer. See Exhibits Y and Z for details from GatesAir and Comark.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 2 inches
Length 800.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 25 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 200.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Disconnect existing Transmitter

Disconnect transmitter and components from existing configuration and move within building to make way for new facilities.

Route Water Line

Route water line outside of transmitter room required to keep away from transmitter equipment.

Sales Tax for EQ

Sales Tax for EQ

Freight

Freight from mfg to staging area

Site Survey - TX

Site survey and report are required to be performed before the new transmitter and components installation plan can be finalized.

Replace ARC remote control

Replace remote control system (ARC)

Securirty - Site

This site requires security once the new transmission line and equipment arrive on site to be installed. Estimated length of 4-6 weeks.

Transmitter - Training

Transmitter training - offsite - 1 week in duration at mfg site.

Reducer

Reducer, 6 1/8 to 4 1/16

Transmitter site Preparation

Site prep for installation of the interim and main transmitters and RF components not part of Installation SOW.

Plumbing

Plumbing costs to install transmitter and components

Misc Installation Expenses

Expenses to support installation of transmitter. Examples: nitrogen and portojohn expenses

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model ULXTE-30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 21 kW
Justification for New Transmitter Interim facility is required to avoid prolonged period of station silence during transition, and station currently has no aux facility to use for interim operation. Extended silent period during transition to new channel is unreasonable.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 800.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 25 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? Yes

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Move ABC rack

Move ABC rack, re-route LDF & control cabling to new tech core to accommodate interim transmitter

Move NBC rack

Skypath rack move to accommodate interim transmitter

Sales Tax

Sales tax for eq

Freight

Freight from mfg to staging area

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner WPTA License, LLC
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Omni-Directional
ERP: 320.0 kW
Manufacturer Dielectric
Model TUA-O4-10/40H-T-1R
Year 2001

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
73905 WPTA

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
24
34

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Antenna Parts and Filter

Antenna Parts and filter (Dielectric Sales orders 1535002 and 1534004)

Retune Antenna

Per Resonant Results, Ltd. Field report 2/21/2017 see EX V for pricing quote

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 1
Number of Panels/Bays 8
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 45.0 kW
Manufacturer
Model TFU-8-WB
Year 2017
Justification for New Antenna Interim facility is required to avoid prolonged period of station silence during transition, and station currently has no aux facility to use for interim operation. Extended silent period during transition to new channel is unreasonable.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 4 1/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Antenna Parts

Misc parts to put (2) WB 8 antennas together to make a WB 16.

FREIGHT

FREIGHT FROM MFG TO STAGING AREA

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 797 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Disconnect existing Interior RF components

Disconnect interior RF transmission line and filters from existing configuration and move within the building to make way for new facilities.

Flex Line and Connectors

Flex Line and Connectors from tx to antenna

Microwave Cables

Microwave Cables for new tower

Refurbish Transmission Line

Per Resonant Results Ltd, field report dated 2/21/2017 - See Exhibits - W and X - engineering reports.

New Transmission Line

New transmission line

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 797 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 797 feet per run
Justification for New Transmission Line See submittal

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Tx Line and Elbows

Elbows and transmission line

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 4 1/16 inches
Segment Length 19 ½ '
Other Segment Length
Number of parallel runs 1
Length 775 feet per run
Justification for New Transmission Line Interim facility is required to avoid prolonged period of station silence during transition, and station currently has no aux facility to use for interim operation. Extended silent period during transition to new channel is unreasonable.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission Line for Microwave

Transmission Line for Microwave for new tower

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Construct New
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1029441
Coordinates (NAD83) Latitude (NAD83) 41° 06' 08.0" N-
Longitude (NAD83) 085° 11' 05.0" W-
Overall Structure Height 770.99 feet
Support Structure Height 725.06 feet
Ground Elevation Above Mean Sea Level (AMSL) 796.91 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner WPTA Television, Inc.
Date Constructed 01/01/1957

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
73905 WPTA DTV

Primary Tower

Back to Top

Tower Construction Costs

Section Question Response
Construct New Tower Use Primary (Main)
Description of Use N/A
Is this a request for upgraded equipment? No
Height 727.00 feet
Justification for New Tower See uploaded file for full details of requirements. WISE-13960 Tower request supporting documents-4-4-18

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Custom Transmission Bridge

21.25' of ERI 3' TX bridge with 90 degree turn extending 35.5'. modified TX bridge length per customer drawing.

Structural analysis of tower

Tower Analysis

Utility Phone Move

Move phone utility to accommodate tower build

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 914
Explanation Scope & significance of project (QMI has multiple stations repacked) require outside management services to augment existing internal personnel to assist turnkey management of and ensure timely and safe execution of channel relocation. CO 20392
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 4
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 4
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Vendor Travel Expenses

Reimbursable Vendor Travel expenses for working in the field on behalf of the station for the Repack project - see quote for estimated expenses.

General Legal fees

General legal fess that are not covered under the 399 EST line items and required to repack the station.

Quarterly reporting -Atty

Preparation and submittal of the FCC required quarterly report 387 attorney. We est. 10qtrs for WISE at $750/qtr.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $3,245,194.95 $3,134,440.96 N/A $2,338,688.77 N/A
Total for all systems $5,925,198.59 $5,827,683.50 N/A $4,375,474.86 N/A
Interim Transmitter ULXTE-30 $1,333,474.72 $1,276,754.72 $844,529.04
Freight $10,162.72 $10,162.72 Freight from mfg to staging area per Q-73719 CO 20504 $10,162.72 N/A
Sales Tax $43,412.02 $43,412.02 EST SALES TAX wise interim eq $43,412.02 N/A
Move NBC rack $30,099.98 $30,099.98 Skypath Rack move to accommodate interim transmitter per actual invoice from USSI Global. $30,099.98 N/A
Move ABC rack $4,800.00 $4,800.00 Actual costs to move ABC rack to accommodate interim transmitter. $4,800.00 N/A
UHF inside RF system including switching $147,500.00 $140,000.00 N/A $79,672.08 N/A
25 Ton system $91,500.00 $91,980.00 Required the the new interim transmitter will be placed in a room that is not currently equipped with necessary HVAC ventilation to operate a transmitter. $91,980.00 Actual costs per invoices from Current Mechanical .
2" Rigid Conduit and Wiring (Cost per foot) $20,800.00 $20,000.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $24,420.19 N/A
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $900,000.00 N/A $559,982.05 N/A
Primary Transmitter ULXTE-60 $1,911,720.23 $1,857,686.24 $1,494,159.73
Transformer 3 phase/480v - 300 KVA $36,800.00 $49,086.40 Per actual quotes rather than estimated costs. $49,086.40 N/A
Misc Installation Expenses $1,130.66 $1,130.66 Costs to support installation crew expenses such as providing nitrogen and portojohn for installation crew. $1,130.66 These invoices are for expenses incurred during the installation activities. They are normally part of the installation costs; however, a new cost component line was added to separate them out from the transmitter or transmitter install expenses
Plumbing $24,720.00 $24,720.00 Per PO 20324, Current Proposal # pp-7362 attached to invoices J000784 and J000859 $24,720.00 N/A
Transmitter site Preparation $11,500.00 $11,500.00 Site prep for installation of the interim and main transmitters and RF components not part of Installation SOW. $11,500.00 N/A
Reducer $2,054.05 $2,054.05 Reducer 6 1/8 to 4 1/16 $2,054.05 N/A
Transmitter - Training $3,300.00 $3,300.00 Transmitter training - offsite - 1 week in duration at mfg site. N/A N/A
Securirty - Site $17,500.00 $17,500.00 This site requires security once the new transmission line and equipment arrive on site to be installed. Estimated length of 4-6 weeks. N/A N/A
Replace ARC remote control $9,971.67 $9,971.67 Replace remote control system - costs per actual invoice $9,971.67 N/A
Site Survey - TX $25,000.00 $25,000.00 Site survey and report are required to be performed before the new transmitter and components installation plan can be finalized. $16,500.00 N/A
Freight $11,000.00 $11,000.00 FREIGHT EST PER Q-73718 $8,482.13 N/A
Sales Tax for EQ $81,280.94 $81,280.94 Sales Tax for WISE - Main TX eq per MFG est and inv. $81,280.94 This final invoice was for the actual sales tax; whereas the original amounts were estimated.
Route Water Line $9,562.91 $9,562.91 Change order to 20324 for additional work necessary for transmitter equipment. INV W13941W13942 - PO 20522 $9,562.91 N/A
Disconnect existing Transmitter $20,000.00 $20,000.00 Disconnect transmitter and components from existing configuration and move within building to make way for new facilities. $18,500.00 N/A
Other -- Building Addition Size: 200.0 $20,000.00 $20,000.00 Necessary to transition the interim and final transmitter installation locations. $0.00 N/A
25 Ton system $91,500.00 $93,243.00 Actual costs per Current Mechanical invoices. $93,243.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $20,800.00 $20,000.00 N/A $0.00 Actual costs per invoices from Current Mechanical.
Switchgear - industrial 800 amp $38,200.00 $44,636.61 PER Q-75864 $44,636.61 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,400,000.00 N/A $1,123,491.36 N/A

Components

Actual Information Description File Name
Freight

Component Description:
WISE-GATES-INT-4TH INV-US0321042 -FREIGHT -
Amount:
$7,596.06

Component Description:
WISE-GATES-INT-2ND INV-TE10004484-2 -FREIGHT - SEE Q-73719
Amount:
$2,566.66
Sales Tax

Component Description:
WISE-GATES- INTERIM INV 1/3 FOR UPLOADED QUOTE Q-73719
Amount:
$13,220.14

Component Description:
WISE-GATES- INTERIM 2ND INV FOR SALES TAX- QUOTE Q-73719
Amount:
$13,220.15

Component Description:
WISE-GATES-INT-TX 4TH INV-US0321042 FOR SALES TAX
Amount:
$2,834.02

Component Description:
WISES GATES INT TX 3RD INV SALES TAX INV TE10004484-3 CORRECTED MODEL
Amount:
$14,137.71
Move NBC rack

Component Description:
Relocate NBC skypath rack to accommodate interim transmitter. INV CI-764835 - PO 20096
Amount:
$30,099.98
Move ABC rack

Component Description:
Vincor - move ABC rack - INV 10615 - PO 20100
Amount:
$4,800.00
UHF inside RF system including switching

Component Description:
WISE-GATES-INT-TX 4TH INV-US0321042 FOR RF COMP
Amount:
$27,933.80

Component Description:
WISE-GATES-INTERIM-3RD INV FOR RF INV TE10004484-3 CORRECTED MODEL
Amount:
$51,738.28
25 Ton system

Component Description:
Final invoice for HVAC. 1/2 of invoice is requested under Interim TX; half under main tx. INV J000876; PO 20323
Amount:
$32,193.00

Component Description:
WISE - CURRENT HVAC FOR THE INTERIM IS HALF OF THE TOTAL INV FOR PO 20323
Amount:
$59,787.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp

Component Description:
Invoice for installation of electrical on interim tx. INV 29446; PO 20536
Amount:
$19,422.70

Component Description:
WISE-GATES-INTERIM-1/3 FOR ELEC LINE C OF Q-73719
Amount:
$1,665.83

Component Description:
WISE-GATES-INTERIM-3RD INV FOR ELEC LINE C INV TE10004484-3 CORRECTED MODEL
Amount:
$1,665.83

Component Description:
WISE-GATES-INTERIM-2ND INV FOR ELEC LINE C OF Q-73719
Amount:
$1,665.83
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
WISE- INT TX 3RD INV FOR LINES A B INV TE10004484-3 - CORRECTED MODEL
Amount:
$174,047.71

Component Description:
WISE-GATES-INTERIM TX - INV FOR TX - LINES A, B AND D FOR Q-73719
Amount:
$187,193.39

Component Description:
WISE-GATES-INTERIM-4TH INV FOR LINE D OF INV US0321042
Amount:
$11,547.56

Component Description:
WISE-GATES-INTERIM TX - 2ND INV FOR TX - LINES A, B AND D FOR Q-73719
Amount:
$187,193.39
Transformer 3 phase/480v - 300 KVA

Component Description:
WISE-GATES- MAIN TX - INV TE10004490-3 LINE D
Amount:
$3,559.90

Component Description:
WISE - Gates final invoice main tx; Line D only. INV US0322577
Amount:
$38,406.69

Component Description:
WISE-GATES- MAIN TX - INVTE10004490-2 LINE D
Amount:
$3,559.90

Component Description:
WISE-GATES_ MAIN TX - ELEC per uploaded Q-73718 line C.
Amount:
$3,559.91
Misc Installation Expenses

Component Description:
Portajohn rental for period ending Aug 31, 2018 INV 1091213
Amount:
$104.68

Component Description:
Nitrogen for period ending 08/31/2019. INV 1102764
Amount:
$21.92

Component Description:
Nitrogen - December 2019. INV 1106627
Amount:
$21.92

Component Description:
Nitrogen for period ending 10/31/18. INV 1093101
Amount:
$21.92

Component Description:
Nitrogen for period ending 12/31/18. INV 1095045
Amount:
$21.92

Component Description:
Nitrogen for period ending 7/31/2019. INV 1101775
Amount:
$21.92

Component Description:
Portajohn rental period ending 10/31/18. INV 1093102
Amount:
$115.46

Component Description:
Nitrogen for period ending 11/30/18. INV 1094072
Amount:
$21.35

Component Description:
2 cyl compressed nitrogen, INV 522665
Amount:
$97.21

Component Description:
Nitrogen for period ending 6/30/19. INV 1100818
Amount:
$21.35

Component Description:
Nitrogen for period ending 5/31/19. INV 1099840
Amount:
$21.92

Component Description:
Nitrogen for period ending 09/30/2019. INV 1103736
Amount:
$21.35

Component Description:
Portajohn rental for period ending 11/30/18. INV 1094073
Amount:
$75.92

Component Description:
Nitrogen for period ending 04-30-19. INV 1098866
Amount:
$21.35

Component Description:
Nitrogen delivery for installation of transmitter. INV 504735
Amount:
$123.96

Component Description:
Nitrogen for period ending 11/30/19. INV 1105673
Amount:
$21.35

Component Description:
Nitrogen for period ending 9/30/2018. INV 1092154
Amount:
$21.35

Component Description:
Portajohn delivery for installation crews. INV 203093
Amount:
$163.50

Component Description:
Nitrogen for period ending 10/31/19. INV 1104697
Amount:
$21.92

Component Description:
Portajohn rental for period ending Sept 30, 2018. INV 1092155
Amount:
$111.87

Component Description:
Nitrogen for period ending 2/28/19. INV 1096986
Amount:
$20.19

Component Description:
Nitrogen for period ending 8/31/18. INV 1091212
Amount:
$14.41

Component Description:
Nitrogen for period ending 01/31/19. INV 1096013
Amount:
$21.92
Plumbing

Component Description:
1st invoice for plumbing work: INV J000784.
Amount:
$16,068.00

Component Description:
2nd invoice for transmitter plumbing work: INV J000859
Amount:
$8,652.00
Transmitter site Preparation

Component Description:
WISE - QCOMM MAIN AND INTERIM TX SITE PREP INV QC18-055
Amount:
$11,500.00
Reducer

Component Description:
Reducer and freight. Gates INV US0321536 - PO 20715
Amount:
$2,054.05
Transmitter - Training Information not provided.
Securirty - Site Information not provided.
Replace ARC remote control

Component Description:
WISE - Burk - Arc system - INV 68908 - PO 20372. Invoice includes sales tax of $213.67 not included in original quote.
Amount:
$9,971.67

Component Description:
3rd revision: See attached cover letter for further explanation from Burk of why each component is necessary. Burk - INV 00068908 - PO 20372
Amount:
$9,971.67
Site Survey - TX

Component Description:
WISE-SURVEY-INV QC18-033
Amount:
$16,500.00
Freight

Component Description:
WISE - Gates - Actual freight for tx; INV US0322577
Amount:
$8,482.13
Sales Tax for EQ

Component Description:
WISE GATES MAIN TX - 3RD INV TE10004490-3 FOR SALES TAX
Amount:
$8,053.36

Component Description:
WISE - Gates Air - Main tx - remaining sales tax on this PO. US0322577
Amount:
$46,278.11

Component Description:
WISE- GATES-MAIN TX- sales tax per inv est.
Amount:
$26,949.47
Route Water Line

Component Description:
Change to scope of work of 20324. Change order 20522. INV W13941W13942
Amount:
$9,562.91
Disconnect existing Transmitter

Component Description:
WISE QCOMM DECOMM TX INV QC18-081
Amount:
$18,500.00
Other -- Building Addition Size: 200.0 Information not provided.
25 Ton system

Component Description:
WISE - CURRENT HVAC FOR THE MAIN IS HALF OF THE TOTAL INV FOR PO 20323
Amount:
$59,787.00

Component Description:
Half of invoice under Int tx; half under Main tx HVAC systems; INV J000876; PO 20323
Amount:
$32,193.00

Component Description:
Condenser Coil Screens; INV J000899; PO 20547
Amount:
$1,263.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp

Component Description:
WISE-GATES-TX- INV TE10004490-3 - LINE C RF
Amount:
$14,878.86

Component Description:
WISE-GATES-TX- INV TE10004490-2 - LINE C
Amount:
$14,878.88

Component Description:
WISE-GATES-MAIN-TX - INV - FOR QUOTE Q-73718 LINE C.
Amount:
$14,878.87
Service entrance 3 phase/800 amp/208 volt Information not provided.
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
WISE-GATES-TX- INV TE10004490-3 - LINE A,B, E - TAX
Amount:
$361,221.05

Component Description:
WISE Gates Main Tx final invoice - INV US0322577; see cover sheet. For lines A, B & E
Amount:
$21,072.55

Component Description:
WISE - GatesAir - Main tx reducer not included in original scope of work - INV US0321536 - PO 20715
Amount:
N/A

Component Description:
This is the first invoice for the plumbing work on PO 20324. INV J00784
Amount:
$16,068.00

Component Description:
This is the 2nd and final invoice for the plumbing work on PO 20324. INV J000859
Amount:
$8,652.00

Component Description:
WISE- MAIN-TX-INV - FOR LINES A B AND E OF Q-73718, UPLOADED
Amount:
$366,553.70

Component Description:
WISE-MAIN-TX-INV TE10004490-2 LINE A,B,E
Amount:
$374,644.06

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $332,839.35 $417,252.63 N/A $127,597.94 N/A
Total for all systems $5,925,198.59 $5,827,683.50 N/A $4,375,474.86 N/A
Interim Antenna TFU-8-WB $203,026.66 $200,736.66 $76,116.66
FREIGHT $2,227.50 $2,227.50 FREIGHT FROM MFG TO STAGING AREA - INV 93050 $2,227.50 N/A
Antenna Parts $19,709.16 $19,709.16 Misc parts required to put (2) WB 8 antennas together to make a WB 16 $19,709.16 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 8 bay,, 45 kW input, horizontally polarized $135,000.00 $135,000.00 Entered Catalog of Costs dollar amount. For some reason the form stated $0.00 in the Predetermined block for the replacement Primary antenna. Not sure why. We tried many options to alleviate the situation an none but adding the EST cost cured the issue. $44,925.00 N/A
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) $10,950.00 $10,400.00 N/A $9,255.00 N/A
Primary Antenna TUA-O4-10/40H-T-1R $129,812.69 $216,515.97 $51,481.28
Retune Antenna $13,200.00 $13,200.00 Retune Antenna estimated cost per EX V - PCI estimate e17449-5A. $10,000.00 N/A
Antenna Parts and Filter $11,982.69 $11,982.69 Filter per Dielectric Sales order 1535002 (invoices 189012 ) $0.00 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $24,933.28 Actual costs per invoices. $1,986.28 Costs are per actual invoices from vendor performing the work.
New combiner, cost per channel (without antenna) $84,200.00 $160,000.00 $80k per Catalog of cost - $80k for each channel 24 and 34. $39,495.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A

Components

Actual Information Description File Name
FREIGHT

Component Description:
WISE-DIE-FREIGHT-INT-INV 93050 BALANCE PAYMENT LINE 17
Amount:
$2,227.50

Component Description:
WISE-DIE-FREIGHT-INT-INV 93050 BALANCE PAYMENT
Amount:
$2,227.50
Antenna Parts

Component Description:
misc parts required to put (2) WB 8 antennas together to make a WB 16 . INV 201009
Amount:
$19,709.16
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Sweep test of existing antenna Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 8 bay,, 45 kW input, horizontally polarized

Component Description:
WISE-DIELECTRIC-INT-BALANCE INV 93050 LINE 1
Amount:
$4,492.50

Component Description:
WISE - ERI - move int antenna - INV WISE-5000 - PO 20833
Amount:
N/A

Component Description:
WISE-DIELECTRIC-INT-BALANCE INV 93050 LINE 1
Amount:
$4,492.50

Component Description:
Filter. Dielectric INV 189012, SO 1535002
Amount:
N/A

Component Description:
INTERIM ANT-WISE-45 PERCENT INV LINE 1
Amount:
$20,216.25

Component Description:
Misc parts required to put (2) WB 8 antennas together to make a WB 16. Dielectric INV 201009, SO 1534004
Amount:
N/A

Component Description:
WISE-DIE-INTERIM ANT- 2nd INV LINE 1 - MAN00114 3-28 uploaded Order Conf # 407003
Amount:
$20,216.25
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed)

Component Description:
WISE - DIE-INTERIM-ELBOW- LINE 17 -MAN00114
Amount:
$4,164.75

Component Description:
WISE - DIE-INTERIM-ELBOW- LINE 16 -INV93050 BALANCE
Amount:
$925.50

Component Description:
ELBOW-WISE MAIN INV 45 PERCENT LINE 17
Amount:
$4,164.75

Component Description:
WISE - DIE-INTERIM-ELBOW- LINE 16 -INV93050 BALANCE
Amount:
$925.50
Retune Antenna

Component Description:
WISE - ERI - additional tuning & time for assisting with tune - INV 51930 - PO 20402
Amount:
$10,000.00
Antenna Parts and Filter

Component Description:
WISE - Dielectric - filter - INV 189012
Amount:
$11,982.69

Component Description:
Misc parts required to put (2) WB 8 antennas together to make a WB 16
Amount:
N/A

Component Description:
Cover letter attached. Dielectric INV 189012.
Amount:
$11,982.69
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Elbow & T/L lengths. Dielectric INV 248005 - SO 1696678
Amount:
$11,237.00

Component Description:
WISE - ERI - tx elbows - INV 52031 - PO 20519
Amount:
$1,986.28

Component Description:
T/L lengths and elbow 6-75 90 degree. Dielectric INV 325035 - SO 1697385
Amount:
$11,710.00
New combiner, cost per channel (without antenna)

Component Description:
last invoice for combiner - Dielectric INV 233008 - sales order 751003
Amount:
$19,995.00

Component Description:
1st invoice for combiner. Dielectric INV MAN00401 - sales order 751003 attached
Amount:
$19,500.00
Sweep test of existing antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $361,759.91 $359,612.53 N/A $323,555.51 N/A
Total for all systems $5,925,198.59 $5,827,683.50 N/A $4,375,474.86 N/A
Interim Transmission Line $138,465.52 $136,318.14 $107,902.62
Transmission Line for Microwave $28,415.52 $28,415.52 Costs to replace microwave components due to needing a new tower for repack. $28,415.52 N/A
Rigid Transmission Line - copper, 4 1/16" $110,050.00 $107,902.62 Actual costs per vendor invoices and POs $79,487.10 N/A
Primary Transmission Line $183,941.00 $183,941.00 $176,299.50
Rigid Transmission Line - copper, 6 1/8" $160,994.00 $160,994.00 N/A $153,352.50 N/A
Tx Line and Elbows $22,947.00 $22,947.00 Actual costs for addition line sections and elbows. See cover sheet for invoice 248005 or 325035 for further explanation. $22,947.00 N/A
Primary Transmission Line $39,353.39 $39,353.39 $39,353.39
Disconnect existing Interior RF components $11,500.00 $11,500.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***Disconnect interior RF transmission line and filters from existing configuration and move within the building to make way for new facilities. $11,500.00 N/A
Flex Line and Connectors $11,506.32 $11,506.32 ***System Notice: Estimate adjusted and locked because line has been superseded.***Flex line and connectors per actual invoices. $11,506.32 N/A
Microwave Cables $16,347.07 $16,347.07 ***System Notice: Estimate adjusted and locked because line has been superseded.***Microwave cables for new tower per actual invoices $16,347.07 N/A

Components

Actual Information Description File Name
Transmission Line for Microwave

Component Description:
Parts to replace microwave due to new tower installation.
Amount:
$3,940.60

Component Description:
Repack Transmission line for Microwave for new tower. ERI INV 51875 - PO 20330
Amount:
$24,474.92
Rigid Transmission Line - copper, 4 1/16"

Component Description:
WISE-DIE-INTERIM- LINE -2nd invoice - MAN00114 - LINES 2 and 19
Amount:
$36,796.10

Component Description:
WISE - ERI - feed line & acces. - INV 51875 - PO 20330. NOTE: Invoice includes sales tax ($1601.17) and freight ($673.24) not included on PO/quote
Amount:
$24,474.92

Component Description:
LINE INTERIM-LINE 2 DEPOSIT INV 45 PERCENT WISE
Amount:
$36,796.10

Component Description:
WISE-DIE-INTERIM- LINE -BALANCE invoice - 93050 - LINE 2
Amount:
$5,894.90

Component Description:
WISE - ERI - parts for repack of line - INV 52274 - PO 20330
Amount:
$3,940.60

Component Description:
WISE-DIE-INTERIM- LINE -BALANCE invoice - 93050 - LINE 2
Amount:
$5,894.90
Rigid Transmission Line - copper, 6 1/8"

Component Description:
New transmission line for new tower. INV MAN00574; sales order 1539002
Amount:
$70,555.28

Component Description:
Main Transmission line - INV 225004 - Sales order 1539002
Amount:
$12,241.94

Component Description:
New transmission line for new tower. INV MAN00573; Sales Order 1539002
Amount:
$70,555.28
Tx Line and Elbows

Component Description:
WISE - Dielectric - T/L and elbows. INV 248005 - Order Conf 1696678. See cover letter for explanation for these charges.
Amount:
$11,237.00

Component Description:
WISE - Dielectric - T/L & Elbow. INV 325035. PO 20476. See cover letter for explanation.
Amount:
$11,710.00
Disconnect existing Interior RF components

Component Description:
WISE QCOMM DECOMM RF INV QC18-081
Amount:
$11,500.00
Flex Line and Connectors

Component Description:
WISE - RF Spec - Flex Line & Connectors- INV 20905 - PO 20351
Amount:
$11,506.32
Microwave Cables

Component Description:
WISE - Integrated - Microwave Line for new tower - INV CD60160489 - PO 20326
Amount:
$16,347.07

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,612,095.59 $1,609,395.59 N/A $1,370,281.31 N/A
Total for all systems $5,925,198.59 $5,827,683.50 N/A $4,375,474.86 N/A
Primary Tower TOWER $0.00 $0.00 $0.00
Primary Tower $1,612,095.59 $1,609,395.59 $1,370,281.31
Custom Transmission Bridge $35,055.99 $35,055.99 Custom transmission bridge to be installed with tower. $35,055.69 N/A
Utility Phone Move $5,125.00 $5,125.00 Costs to move phone utility to accommodate tower build. Per actual invoice from Zayo. $5,125.00 N/A
Structural analysis of tower $4,000.00 $4,000.00 Per proposal agreement with ERI: 20180518-141 $4,000.00 N/A
New tower $1,344,814.60 $1,344,814.60 see uploaded file for full request details and proposal and PO. file - WISE-13960 Tower request supporting documents-4-4-18 7-11-Added $76,875.00 for temporary parking lot because of new tower construction requirements. 4-10-20 added costs to move antenn $1,266,586.62 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $39,114.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $20,400.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***FAILING TOWER ANALYSIS REQUIRED NEW DRAWINGS AND ANALYSIS AS WE TRIED TO ENGINEER OUT OF A NEW TOWER $20,400.00 N/A

Components

Actual Information Description File Name
Custom Transmission Bridge

Component Description:
WISE - ERI - custom tx bridge - INV WISE-005 - PO 20188
Amount:
$16,860.69

Component Description:
WISE - ERI - custom tx bridge - INV WISE-002 - PO 20188
Amount:
$18,195.00
Utility Phone Move

Component Description:
Cost to move phone line for tower build. INV 2019010028493 - PO 20502
Amount:
$5,125.00
Structural analysis of tower

Component Description:
See cover letter for justification for 2nd tower analysis - INV WISE-030 - PO 20219
Amount:
$4,000.00

Component Description:
WISE - ERI - Tower analysis - INV WISE-030 - PO 20219
Amount:
$4,000.00
New tower

Component Description:
WISE - LOHNES - INV -201803-0275-15 - FAA NOTICE AND ASR
Amount:
$2,400.00

Component Description:
Weather days during tower build. See T&C 1.6 and 3.2 on attached quote. INV 52122 - PO 20135
Amount:
$6,500.00

Component Description:
WISE - ERI - weather days during tower construct - INV 52389 - PO 20135
Amount:
$8,450.00

Component Description:
Weather days during build of new tower. See T&C 1.6 and 3.2 on quote. INV 51957 - PO20135
Amount:
$3,900.00

Component Description:
WISE - ERI - INV WISE-001 Invoice covers Materials for Custom Guyed Tower
Amount:
$591,482.50

Component Description:
WISE - ERI NEW TOWER 2ND INVOICE WISE-004 TOWER IS ERECTED
Amount:
$595,634.12

Component Description:
WISE-ASPHALT FOR TEMP LOT DU TO NEW TOWER-INV 16198
Amount:
$56,000.00

Component Description:
1st invoice to move interim antenna - WISE - ERI - INV WISE-5000 - PO 20833
Amount:
$39,114.00

Component Description:
WISE- ERI- TOWER ENGR SURVEY- INV 51231- 6-11-FORMAT CHANGE TO INV
Amount:
$3,300.00

Component Description:
WISE - ERI - Balance of tower work. INV WISE-007 - PO 20135. See cover sheet.
Amount:
$54,920.00
Tall Tower (greater than 500')

Component Description:
Per engineer's direction, moved INV WISE-5000 to Tall Tower.
Amount:
$39,114.00
Structural engineering tower load study for well documented tower

Component Description:
WISE-TOWER ANALYSIS -PJ FORD-SEE PO 19985 AND QUOTE UPLOADED
Amount:
$3,900.00

Component Description:
WISE-FORD-TOWER DRAWING FOR TOWER ANALYSIS-INV 202415
Amount:
$16,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $313,228.79 $247,466.79 N/A $202,128.34 N/A
Total for all systems $5,925,198.59 $5,827,683.50 N/A $4,375,474.86 N/A
Outside Professional Services $313,228.79 $247,466.79 $202,128.34
Quarterly reporting -Atty $7,500.00 $7,500.00 Preparation and submittal of the FCC required quarterly report 387 by attorney. We estimate that Phase 6 will require 10 quarters@$750 of report 387 submittals. $0.00 N/A
General Legal fees $14,136.79 $14,136.79 General legal fess that are not covered under the 399 EST line items and required to repack the station. $14,136.79 N/A
Vendor Travel Expenses $15,080.00 $15,080.00 Reimbursable Vendor Travel expenses for working in the field on behalf of the station for the Repack project - see quote for estimated expenses. CO 20392 DUE TO NEW TOWER $11,254.55 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $20,000.00 N/A $20,000.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $14,720.00 $14,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $4,760.00 N/A
Prepare request for Special Temporary Authorization $8,200.00 $6,000.00 N/A $2,225.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $10,000.00 SHARED FACILITIES AND NEW TOWER REQUIRED MULTIPLE CPA MODIFICATIONS FOR WISE AND WPTA TO BE FAA AND FCC COMPLIANT $8,150.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $3,375.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $525.00 N/A
Project management of the transition $144,412.00 $140,000.00 CO 20392 DUE TO MULTIPLE PROJECT CHANGES FORCED BY A NEW TOWER BUILD AND CONFIGURATION ENGINEERING. $136,950.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $752.00 N/A

Components

Actual Information Description File Name
Quarterly reporting -Atty Information not provided.
General Legal fees

Component Description:
WISE - Brooks legal services for period ending Nov 2018 - INV 3960720
Amount:
$231.00

Component Description:
WISE - Brooks legal services for period ending July 2018 - INV 3955830
Amount:
$99.00

Component Description:
WISE - Brooks legal services period ending Dec 2018 - INV 3961878
Amount:
$1,716.00

Component Description:
WISE - Brooks legal services for period ending Jan 2019. INV 3962869
Amount:
$248.50

Component Description:
WISE-SHINE-NEW TOWER LEGAL FEES AND PERMIT INV 20180201 - PRICING CORRECTED FOR ROUNDING ERROR
Amount:
$1,015.30

Component Description:
WISE - Brooks legal services for period ending Oct 2018 - INV 3959633
Amount:
$1,501.50

Component Description:
WISE - Brooks legal services for period ending Sept 2018 - INV 3958279
Amount:
$1,765.50

Component Description:
WISE - Brooks legal services for period ending July 2019
Amount:
$52.00

Component Description:
WISE - Brooks legal services for period ending August 2019 - INV 3971024
Amount:
$208.00

Component Description:
Brooks - Repack legal services for period ending Aug 31, 2018
Amount:
$7,109.49

Component Description:
WISE - Brooks - general legal for period ending Oct 2017 - INV 3945567
Amount:
$141.00

Component Description:
WISE - Brooks legal services for period ending June 2018 - INV 3954658
Amount:
$49.50

Component Description:
WISE - Legal fees for tower approval- INV 20180201
Amount:
$1,022.00
Vendor Travel Expenses

Component Description:
WISE - QCOMM PM 8THRUOCT18 TRAVEL- PO CO 20392
Amount:
$9,000.00

Component Description:
WISE-QCOMM-PM-TRAVEL INV- QC17-151- ITEM 1010-1015 SEE QC17006
Amount:
$2,254.55
Comprehensive coverage verification via field study, if needed

Component Description:
WISE-QCOMM-COVERAGE-INV QC19-178 - WISE/WPTA BECAUSE WPTA PRE/POST SHARED FACILITY.
Amount:
$20,000.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
LEGAL APRIL17 WILEY-WISE
Amount:
$410.00

Component Description:
LEGAL WILEY JUNE17 WISE
Amount:
$1,962.50

Component Description:
LEGAL WILEY AUG17-WISE
Amount:
$392.50

Component Description:
LEGAL JULY17 WILEY WISE
Amount:
$1,995.00
Prepare request for Special Temporary Authorization

Component Description:
WISE- LOHNES- STA INTERIM - INV 201808-0275-15-2
Amount:
$1,050.00

Component Description:
WISE- LOHNES- STA- MAIN TOP ANTENNA - INV 201809-0275-15-1
Amount:
$1,175.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
WISE - ENGR NEW CH-CP
Amount:
$1,650.00

Component Description:
WISE/WPTA- LOHNES - CPA TO LOWER ERP PER PRE AND POST REPACK CONFIG CHANGES - INV201902-0275-15-1
Amount:
$1,260.00

Component Description:
WISE -LOHNES - WPTA SHARED FACILITIES MOD TO CPA FOR NEW TOWER INV 201807-0275-15-1
Amount:
$1,300.00

Component Description:
WISE- LOHNES - CPA MOD FOR NEW TOWER SHARED WITH WISE AND WPTA INV 201812-0275-15-1
Amount:
$2,640.00

Component Description:
WISE- LOHNES- CPA -NEW TOWER REQUIRED MOD TO CPA - INV 201810-0275-15-2
Amount:
$1,300.00
Perform engineering study for new channel assignment and antenna development

Component Description:
WISE/WPTA - LOHNES - FAA ASR - REQUIRED FILINGS FOR NEW TOWER BUILD - INV 201811-0275-15-2
Amount:
$1,275.00

Component Description:
WISE-ENGR-NEW CHANNEL
Amount:
$2,100.00
Prepare and or review reimbursement form Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
WISE-LOHNES - LIC APP WISE INV 201212-0275-15-2
Amount:
$525.00
Project management of the transition

Component Description:
WISE QCOMM PM 4THRU7-18, NEW TOWER BEGAN - INV QC18-071 CO 20392
Amount:
$49,350.00

Component Description:
PM-WISE 50 PERCENT DEPOSIT INV
Amount:
$29,147.50

Component Description:
WISE-PM-SEPT-DEC-17 - INV QC18-017
Amount:
$15,015.00

Component Description:
WISE-QCOMM-PM-INV QC17-151-MAR-AUG17
Amount:
$16,230.00

Component Description:
WISE QCOMM PM AUG THRU OCT18 INV QC19-020 CO 20392
Amount:
$39,000.00

Component Description:
WISE-PM-1THRU3-18-INV-QC18-046
Amount:
$17,355.00
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
OPERATIONAL MEETING ATTY OF QMI AND SAGAMOREHILL - WISE
Amount:
$141.00

Component Description:
OPERATIONAL MEETING QMI AND SAGAMOREHILL ATTY
Amount:
$611.00

Component Description:
WISE- BROOKS- legal- shared services inv 3944698
Amount:
$188.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $60,080.00 $59,515.00 N/A $13,222.99 N/A
Total for all systems $5,925,198.59 $5,827,683.50 N/A $4,375,474.86 N/A
Other Expenses $60,080.00 $59,515.00 $13,222.99
Equipment Storage $10,000.00 $10,000.00 Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate from 6-24 months of storage time. $5,650.00 N/A
Develop and air announcement of upcoming channel change $15,000.00 $15,000.00 Required FCC announcements and good will public relations must we upheld. The production airing and disseminating of these announcements are fundamental to our operations. N/A N/A
Equipment Delivery and Handling Charges $8,000.00 $8,000.00 Transport, forklift rental and handling fees from staging area to transmitter site. $6,450.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $10,000.00 $10,000.00 40 yard disposal bin on site to capture all waste from on site system integration and tower vendors with multiple pick up for at least 6 months on site. $1,122.99 N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
MVPD Notification of Channel Change $5,000.00 $5,000.00 Required FCC notification. N/A N/A

Components

Actual Information Description File Name
Equipment Storage

Component Description:
Storage fees for 7/11/18 thru 10/11/18. Casey's Garage - INV 1012
Amount:
$1,800.00

Component Description:
WISE - EQ STORAGE-4-12-18-7-12-18 - INV 1008
Amount:
$1,800.00

Component Description:
WISE-STORAGE-1-18 THRU-4-11-18 INV-1003
Amount:
$1,800.00

Component Description:
WISE-FORKLIFT RENT TO UNLOAD INTO STORAGE. INV 1004
Amount:
$250.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Antenna delivery from storage facility to site. Casey's Garage - INV 1018
Amount:
$1,500.00

Component Description:
Delivery of transmission line from storage facility to site. Casey's Garage - INV 1014
Amount:
$4,950.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Dumpster expense to collect debris from installation activities. INV 0091-002865044
Amount:
$310.06

Component Description:
Dumpster to collect debris from installation for November, 2018. NOTE: the two late fees of $2.37 and $7.02 are NOT included in this request.
Amount:
$340.75

Component Description:
Dumpster delivery fee for collecting debris from installation activities. INV 0091-002845250
Amount:
$157.69

Component Description:
Dumpster to collect debris from installation activities. INV 0091-002978645
Amount:
$314.49
DTV Medical Facility Notification Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
MVPD Notification of Channel Change Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,925,198.59 $5,827,683.50 $4,375,474.86

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

BRADY DREASLER

CORPORATE DIRECTOR OF ENGINEERING


05/22/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

BRADY DREASLER

CORPORATE DIRECTOR OF ENGINEERING


05/22/2020

Attachments