Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
American Christian Television Services, Inc. |
1844 Baty Road Lima, OH 45807 United States |
+1 (419) 339-4444 | kbowers@wtlw.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WOIW-LD has transitioned from channel 23 to channel 17 and is operating with a license to operate. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AT7120 | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 120 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-4R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2173 W | |
Justification for New Transmitter | The existing transmitter is not capable of being tuned to channel 17 and cannot meet the requirements of the displacement construction permit. The existing output mask filter is channel-specific and must be replaced to accommodate the new channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Barrier Gas 1 5-8 |
Transmitter part Barrier Gas |
Intall Material |
Install Material |
Parallel Surge Suppressor |
Surge Suppressor |
Couplings |
Two couplings |
Elbow 90 degree 1 5-8 |
Elbow |
Transmitter Installation |
Install |
Kit - UAXT RF Access |
RF Access |
Mask Filter 2.5 kw |
Mask Filter Tuned |
Kit Rf XSMN Line 1 5-8 |
RF Kit |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Cone | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | Ultra Blaster | |
Year | 1992 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-16A/VP | |
Year | 2019 | |
Justification for New Antenna | The replaced antenna was designed for channel 23 and would not work for channel 17. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Reducer |
Reducer to feed line |
VPOL Components |
Feed line components. |
Parts Shipping |
Additional shipping for component parts. |
Antenna Shipping |
Shipment from Dielectric. |
Antenna Mounting Brackets |
mounting brackets for tower legs |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 623 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 125 feet per run | |
Justification for New Transmission Line | 125 ft purchased to extend existing and reusable 2.25" line on tower. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1012894 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 45' 47.0" N- |
Longitude (NAD83) | 084° 11' 01.0" W- | |
Overall Structure Height | 720.14 feet | |
Support Structure Height | 660.10 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 826.76 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Christian Television Services Inc. | |
Date Constructed | 02/27/2019 |
Facility ID | Call Sign | Service |
---|---|---|
1222 | WTLW | DTV |
74294 | WWSR | FM |
Users |
---|
Radio Communica |
Internet Provid |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Removal of Previous Antenna |
Removal of old antenna and transmission line. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $144,236.46 | $90,805.59 | N/A | $92,253.92 | N/A |
Total for all systems | $388,058.29 | $217,200.06 | N/A | $214,271.06 | N/A |
Primary Transmitter UAXTE-4R37 | $144,236.46 | $90,805.59 | $92,253.92 | ||
Kit Rf XSMN Line 1 5-8 | $1,708.18 | $1,708.18 | N/A | $1,708.18 | N/A |
Mask Filter 2.5 kw | $3,272.72 | $3,272.72 | N/A | $3,272.72 | N/A |
Kit - UAXT RF Access | $542.06 | $542.06 | N/A | $542.06 | N/A |
Transmitter Installation | $12,628.35 | $12,628.35 | N/A | $12,628.35 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $58,186.60 | N/A | $59,634.93 | Includes freight charge which was unknown at the time of estimate. |
Parallel Surge Suppressor | $1,510.82 | $1,510.82 | N/A | $1,510.82 | N/A |
10 Ton system | $38,900.00 | $11,282.53 | N/A | $11,282.53 | N/A |
Couplings | $368.90 | $368.90 | N/A | $368.90 | N/A |
Barrier Gas 1 5-8 | $241.55 | $241.55 | N/A | $241.55 | N/A |
Intall Material | $680.00 | $680.00 | N/A | $680.00 | N/A |
Elbow 90 degree 1 5-8 | $383.88 | $383.88 | N/A | $383.88 | N/A |
Actual Information Description | File Name |
---|---|
Kit Rf XSMN Line 1 5-8 | |
Mask Filter 2.5 kw | |
Kit - UAXT RF Access | |
Transmitter Installation | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Parallel Surge Suppressor | |
10 Ton system | |
Couplings | |
Barrier Gas 1 5-8 | |
Intall Material | |
Elbow 90 degree 1 5-8 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $52,704.33 | $52,704.33 | N/A | $50,714.70 | N/A |
Total for all systems | $388,058.29 | $217,200.06 | N/A | $214,271.06 | N/A |
Primary Antenna TLP-16A/VP | $52,704.33 | $52,704.33 | $50,714.70 | ||
Parts Shipping | $281.33 | $281.33 | N/A | $281.33 | N/A |
Antenna Mounting Brackets | $3,583.00 | $3,583.00 | N/A | $3,583.00 | N/A |
Antenna Shipping | $3,510.00 | $3,510.00 | N/A | $3,510.00 | N/A |
VPOL Components | $5,966.00 | $5,966.00 | N/A | $5,966.00 | N/A |
Reducer | $426.00 | $426.00 | N/A | $426.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $3,740.37 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $33,208.00 | $33,208.00 | N/A | $33,208.00 | N/A |
Actual Information Description | File Name |
---|---|
Parts Shipping | |
Antenna Mounting Brackets | |
Antenna Shipping | |
VPOL Components | |
Reducer | |
Sweep test of transmission line and antenna | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,375.00 | $6,515.14 | N/A | $6,515.14 | N/A |
Total for all systems | $388,058.29 | $217,200.06 | N/A | $214,271.06 | N/A |
Primary Transmission Line | $7,375.00 | $6,515.14 | $6,515.14 | ||
Flexible Air Transmission Line - dielectric, 3" | $7,375.00 | $6,515.14 | N/A | $6,515.14 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $166,250.00 | $50,200.00 | N/A | $50,200.00 | N/A |
Total for all systems | $388,058.29 | $217,200.06 | N/A | $214,271.06 | N/A |
Primary Tower GTOWER | $166,250.00 | $50,200.00 | $50,200.00 | ||
Structural Analysis | $8,500.00 | $8,500.00 | N/A | $8,500.00 | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $41,700.00 | N/A | $41,700.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural Analysis | |
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,982.50 | $12,465.00 | N/A | $10,077.30 | N/A |
Total for all systems | $388,058.29 | $217,200.06 | N/A | $214,271.06 | N/A |
Outside Professional Services | $12,982.50 | $12,465.00 | $10,077.30 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $3,675.00 | N/A | $3,873.75 | Adjusted invoice 1516076 to correct amount. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $1,557.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $1,050.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | $1,806.25 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $1,414.80 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $250.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $250.00 | Engineering portion of STA Application |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $125.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $125.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare/ Review 399 reimbursement form | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,510.00 | $4,510.00 | N/A | $4,510.00 | N/A |
Total for all systems | $388,058.29 | $217,200.06 | N/A | $214,271.06 | N/A |
Other Expenses | $4,510.00 | $4,510.00 | $4,510.00 | ||
Removal of Previous Antenna | $4,510.00 | $4,510.00 | N/A | $4,510.00 | N/A |
Actual Information Description | File Name |
---|---|
Removal of Previous Antenna |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $388,058.29 | $217,200.06 | $214,271.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin Bowers President 05/05/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin Bowers President 05/05/2020 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin Bowers President 05/05/2020 |