Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Estrella Television License of Houston LLC Doing Business As: KRCA LICENSE LLC |
1845 Empire Avenue Burbank, CA 91504 United States |
+1 (818) 729-5300 | bkei@EstrellaMedia.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity, Inc. |
4031 University Drive Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | The plan is for KZJL to replace the existing Channel 44 system with a new Channel 21 antenna, new 6-1/8" line and new transmitter. During the transition, KZJL will utilize a shared interim antenna at a new site. See attached narrative statement. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Auxiliary | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Ranger | |
Year | 2001 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | UAXTE-2R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1 kW | |
Justification for New Transmitter | Existing transmitter cannot be retuned, so a replacement transmitter needs to be purchased. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | The new auxiliary transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 42 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-72 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 47 kW | |
Justification for New Transmitter | The existing transmitter cannot be retuned per letter from the manufacturer. A new replacement transmitter is required. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 1000.0 feet | |
Other Electrical Service | Yes | |
Description | The new main transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1500.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Ice Shield for HVAC Equipment |
Ice shield necessary for HVAC Equipment per tower owner. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Lease New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30DSC-R C170 | |
Year | 2004 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Leased | |
Owner | American Tower Corp. | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels/Bays | 56 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 700.00 MHz | |
Design power capacity in use | 60.0 % | |
Other Antenna Type | N/A | |
ERP: | 660.0 kW | |
Manufacturer | ||
Model | PEPL42C | |
Year | 2018 | |
Justification for New Antenna | The existing antenna cannot be re-tuned. KJZL decided to join effort through the BBA system in order to reduced cost compared to a like-for-like swap. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 470.0 MHz - 698.0 MHz | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Combiner HVAC |
2x10 Ton HVAC needed for the Combiner |
Combiner Space |
600-1500 sq ft indoor space needed for new Combiner system. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Lease New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1800 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 2 | |
Length | 2100 feet per run | |
Justification for New Transmission Line | The existing transmission line is the wrong segment length. |
Name | Description |
---|---|
Nitrogen Generator |
For transmission line protection and dehydration |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Auxiliary (Backup) | |
Description of Use | No Longer Needed | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1059622 | |
Coordinates (NAD83) | Latitude (NAD83) | 29° 33' 45.2" N- |
Longitude (NAD83) | 095° 30' 35.9" W- | |
Overall Structure Height | 1974.06 feet | |
Support Structure Height | 1844.14 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 74.15 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 08/30/2000 |
Facility ID | Call Sign | Service |
---|---|---|
53847 | KXLN-DT | DTV |
9625 | KQBT | FM |
31870 | KYAZ | DTV |
51569 | KTXH | DTV |
13200 | KUVM-CD | DTV |
28324 | KTBU | DTV |
11969 | KBXX | FM |
11971 | KMJQ | FM |
Users |
---|
142962 K236AR |
57189 KHLM-LD |
7079 KCVH |
Wireless 2 |
Wireless 1 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1059622 | |
Coordinates (NAD83) | Latitude (NAD83) | 29° 33' 45.2" N- |
Longitude (NAD83) | 095° 30' 35.9" W- | |
Overall Structure Height | 1974.06 feet | |
Support Structure Height | 1844.14 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 74.15 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 08/30/2000 |
Facility ID | Call Sign | Service |
---|---|---|
31870 | KYAZ | DTV |
51569 | KTXH | DTV |
28324 | KTBU | DTV |
11969 | KBXX | FM |
11971 | KMJQ | FM |
53847 | KXLN-DT | DTV |
9625 | KQBT | FM |
13200 | KUVM-CD | DTV |
22204 | KRIV | DTV |
Users |
---|
Wireless 2 |
142962 K236AR |
57189 KHLM-LD |
7079 KCVH |
Wireless 1 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Construction Management |
Construction project management - Tower Modification reinforcements and facilities |
Structural Analysis |
After the tower mapping is complete, a structural analysis will be necessary. |
Ground Permit Drawings |
Ground & Building A and E Permit Drawing Package |
Tower Permit Drawings |
Tower Permit Drawing Package |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 807 | |
Explanation | KZJL does not have sufficient resource capacity and expertise in house to handle all of the Project Management related tasks necessary to facilitate on-time completion of the station's build by the Construction Deadline | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 10 | |
Justification | Supervision and inspection of work completed |
Name | Description |
---|---|
Site Coordination Meeting |
Site Coordination Meeting |
RF System Test |
RF System Test |
Migratory Bird Assessment |
Migratory Bird Assessment and Permitting (if needed) |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Site Security |
Site Security necessary during repack activities. |
Main Site Upgrades |
Upgrades necessary at the Main tower site due to Repack Activities. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,850,020.57 | $1,613,235.31 | N/A | $1,438,395.43 | N/A |
Total for all systems | $5,136,123.57 | $2,766,490.30 | N/A | $2,089,613.98 | N/A |
Primary Transmitter ULXTE-72 | $1,670,720.57 | $1,442,185.31 | $1,350,245.14 | ||
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,290,031.41 | See attached GatesAir quote GA-00021324 for upgrade solid state transmitter. | $1,247,892.25 | N/A |
Ice Shield for HVAC Equipment | $8,000.00 | $8,000.00 | See attached KZJL Main Transmitter Cost Estimate. | $6,000.00 | N/A |
Other -- Building Addition Size: 1500.0 | $44,849.86 | $44,849.86 | Per ATC Quote ($33,333.33) and Wilson Fire Proposal dated 12/7/18 ($11,516.53) | $36,073.86 | N/A |
Other -- HVAC Service Type: C Size:20 (Other) | $42,204.04 | $42,204.04 | Per Mercury Control proposal 1034 dated 9/28/18 | $42,204.03 | N/A |
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | $1,666.67 | $1,666.67 | ATC Invoice 460208944 | $1,250.01 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $26,000.00 | $8,333.33 | See attached KZJL Main Transmitter Cost Estimate and ATC Invoice 460208944 | $7,749.99 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $12,100.00 | Per ATC Invoice 460208944 | $9,075.00 | N/A |
Auxiliary Transmitter UAXTE-2R37 | $179,300.00 | $171,050.00 | $88,150.29 | ||
5 Ton system | $20,250.00 | $19,250.00 | N/A | N/A | N/A |
Other Electrical Service: The new auxiliary transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | $7,500.00 | $7,500.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $120,000.00 | N/A | $88,150.29 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Ice Shield for HVAC Equipment | |
Other -- Building Addition Size: 1500.0 | |
Other -- HVAC Service Type: C Size:20 (Other) | |
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | |
2" Rigid Conduit and Wiring (Cost per foot) | |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | |
5 Ton system | Information not provided. |
Other Electrical Service: The new auxiliary transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $419,780.00 | $245,809.00 | N/A | $159,356.46 | N/A |
Total for all systems | $5,136,123.57 | $2,766,490.30 | N/A | $2,089,613.98 | N/A |
Primary Antenna PEPL42C | $419,780.00 | $245,809.00 | $159,356.46 | ||
UHF - High Power Top Mount Three Station broadband panel antenna elliptically or circularly polarized | $128,000.00 | $128,000.00 | N/A | $96,000.00 | N/A |
Combiner Space | $33,333.00 | $33,333.00 | N/A | $2,083.33 | N/A |
Combiner HVAC | $24,667.00 | $24,667.00 | N/A | $18,500.01 | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $8,580.00 | N/A | $6,435.00 | N/A |
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $0.00 | N/A | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $44,562.00 | N/A | $31,338.11 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,667.00 | See attached Cost sheets | $5,000.01 | N/A |
Actual Information Description | File Name |
---|---|
UHF - High Power Top Mount Three Station broadband panel antenna elliptically or circularly polarized | |
Combiner Space | |
Combiner HVAC | |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | |
Combiner output splitting/switching for dual feed lines, if applicable | Information not provided. |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,403,600.00 | $308,030.00 | N/A | $231,022.50 | N/A |
Total for all systems | $5,136,123.57 | $2,766,490.30 | N/A | $2,089,613.98 | N/A |
Primary Transmission Line | $1,403,600.00 | $308,030.00 | $231,022.50 | ||
Nitrogen Generator | $5,000.00 | $5,000.00 | Per ATC Invoice 460208944 | $3,750.00 | N/A |
Rigid Transmission Line - copper, 7 3/16" broadband | $1,398,600.00 | $303,030.00 | N/A | $227,272.50 | N/A |
Actual Information Description | File Name |
---|---|
Nitrogen Generator | |
Rigid Transmission Line - copper, 7 3/16" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,103,445.00 | $252,572.57 | N/A | $117,053.18 | N/A |
Total for all systems | $5,136,123.57 | $2,766,490.30 | N/A | $2,089,613.98 | N/A |
Primary Tower GTOWER | $892,945.00 | $252,572.57 | $117,053.18 | ||
Construction Management | $10,495.00 | $10,495.00 | American Tower 460208944 | $10,495.00 | invoices |
Tower Permit Drawings | $4,700.00 | $4,700.00 | N/A | $3,525.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $6,200.00 | See attached KZJL Main Transmitter Cost Estimate | $4,650.00 | N/A |
Structural Analysis | $4,750.00 | $4,750.00 | See attached KZJL Main Transmitter Cost Estimate | $3,562.50 | N/A |
Ground Permit Drawings | $4,700.00 | $4,700.00 | N/A | $3,525.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $121,727.57 | Per ATC Invoice 460208944 | $91,295.68 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $100,000.00 | See attached KZJL Main Transmitter Cost Estimate | N/A | N/A |
Auxiliary Tower GTOWER | $210,500.00 | $0.00 | $0.00 | ||
Tall Tower (greater than 500') | $210,500.00 | $0.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Construction Management | |
Tower Permit Drawings | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Structural Analysis | |
Ground Permit Drawings | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Major tower reinforcement/modifications | Information not provided. |
Tall Tower (greater than 500') | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $242,659.00 | $230,579.42 | N/A | $115,824.68 | N/A |
Total for all systems | $5,136,123.57 | $2,766,490.30 | N/A | $2,089,613.98 | N/A |
Outside Professional Services | $242,659.00 | $230,579.42 | $115,824.68 | ||
Project management of the transition | $127,506.00 | $116,280.00 | $106,800 Overall project Management + $9,480 Additional per Towers owner See attached KZJL Cost Estimate | $77,825.55 | N/A |
Migratory Bird Assessment | $438.00 | $438.00 | N/A | $328.13 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | $0.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $14,514.75 | see Estimated Cost Justification KZJL-550-Attorney - Negotiation of Lease and Other Matters v0 | $14,514.75 | invoices |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $702.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | $350.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $3,750.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $1,567.25 | N/A |
RF System Test | $12,830.00 | $12,830.00 | see Estimated Cost Justification KZJL-580-Field Engineering Services - Interim Site RF System Test v0 | $11,580.00 | N/A |
Site Coordination Meeting | $1,250.00 | $1,250.00 | N/A | $937.50 | N/A |
Additional Field Engineering Service, 10 Days | $20,000.00 | $20,000.00 | N/A | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | $2,812.50 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $166.67 | Tower owner is passing this cost to the station | $125.00 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $1,350.00 | Tower owner is passing this cost to the Station | $1,012.50 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $319.50 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Migratory Bird Assessment | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
RF System Test | |
Site Coordination Meeting | |
Additional Field Engineering Service, 10 Days | Information not provided. |
RF Exposure Measurements | |
ASR modification (prepare FCC Form 854) | |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $116,619.00 | $116,264.00 | N/A | $27,961.73 | N/A |
Total for all systems | $5,136,123.57 | $2,766,490.30 | N/A | $2,089,613.98 | N/A |
Other Expenses | $116,619.00 | $116,264.00 | $27,961.73 | ||
Main Site Upgrades | $11,375.00 | $11,375.00 | See attached KZJL Main Transmitter Cost Estimate. | $200.00 | N/A |
Site Security | $7,875.00 | $7,875.00 | Per ATC Invoice 460208944 | $5,906.25 | N/A |
MVPD Notification of Channel Change | $2,289.00 | $2,289.00 | Please see 12.6.19 ECJ v0 | $2,289.00 | N/A |
Develop and air announcement of upcoming channel change | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $25,000.00 | $25,000.00 | N/A | $5,124.99 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $25,000.00 | $25,000.00 | Station Estimate | $3,430.00 | N/A |
Local Zoning | $10,000.00 | $10,000.00 | N/A | $562.50 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $535.00 | see Estimated Cost Justification KZJL-610-FCC Filing Fee - License to Cover v0 | $535.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $8,914.00 | N/A |
Non-zoning permits | $8,000.00 | $8,000.00 | N/A | $999.99 | N/A |
Actual Information Description | File Name |
---|---|
Main Site Upgrades | |
Site Security | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Local Zoning | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
DTV Medical Facility Notification | |
Non-zoning permits |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $5,136,123.57 | $2,766,490.30 | $2,089,613.98 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Everett Todd Chief Engineer 03/27/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Everett Todd Chief Engineer 03/27/2020 |