Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
14040
Service:
DTV
Call Sign:
KRMA-TV
Channel:
33 (UHF)
File Number:
0000027982
FRN:
0001615582
Date Submitted:
04/10/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

ROCKY MOUNTAIN PUBLIC MEDIA, INC.

Doing Business As: ROCKY MOUNTAIN PUBLIC MEDIA, INC.

DOUG HOUSTON

1089 BANNOCK STREET

DENVER, CO 80204

United States

+1 (303) 892-6666 doughouston@rmpbs.org Not-for-Profit

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

James Schoedler

KRMA Repack Project Manager

JB Schoedler Associates LLC

1069 S Downing Street

Denver, CO 80209

United States

+1 (303) 725-9043 jschoedler@usa.net

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan To transition from CH 18 to CH 33 KRMA must replace its main antenna, transmission line, RF switching, main and backup transmitters. An interim antenna on the new channel will be used during replacement of the main antenna.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Low Power Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Innovator LX
Year 2009
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 3 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-6R44
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 3.6 kW
Justification for New Transmitter KRMA originally requested funds to retune the existing Axcera transmitter, but after submitting sample rf modules to UBS/Axcera for re-tuning, the company has advised that due to the age and design of the modules the re-tuning will not be possible.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Power CD
Year 2009
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 30 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTE-50
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31.7 kW
Justification for New Transmitter Refer to attached Transition Plan exhibit.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 1 inches
Length 1.0 feet
Other Electrical Service Yes
Description Disconnection of existing.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Site Survey

Engineering visit to specify transmitter installation.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-32DSC/VP-R C190
Year 2009

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-38DSC/VP-R C190
Year 2018
Justification for New Antenna Existing antenna does not cover new channel

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Installation

Removal of old antenna and installation of new.

Transportation to site

Transportation to site on 4-wheel drive road.

Freight

Shipping from manufacturer to offload point in Denver.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 115.0 kW
Manufacturer
Model SFN-2030-5645-16
Year 2019
Justification for New Antenna An existing RF Technologies CH 18 antenna planned for interim use was found to have a burned center conductor and shorting ring. It is not repairable and therefore a new interim antenna is needed to stay on the air during main antenna replacement.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Coaxial Switch for Interim Antenna

Dielectric 3 Port Coaxial Switch and Elbows needed to connect new interim antenna with transmitter RF system.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 379 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 379 feet per run
Justification for New Transmission Line Existing transmission line is not suitable for new channel

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1023484
Coordinates (NAD83) Latitude (NAD83) 39° 40' 17.4" N-
Longitude (NAD83) 105° 13' 08.0" W-
Overall Structure Height 273.95 feet
Support Structure Height 271.98 feet
Ground Elevation Above Mean Sea Level (AMSL) 7685.60 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Bear Creek Development Corporation
Date Constructed 11/08/1988

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
83535 KVOD FM
57219 KCEC DTV

Other Types of Users

Users
2-way radio
Cellular

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 500
Explanation Overall project management and coordination of procurement process.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Electrical Design Engineering

Electrical requirements of new main and auxiliary transmitters require extensive electrical rework. Contractor requested drawings and panel schedules from an electrical designer.

Electrical Installation for Main and Backup Transmitters

Costs to install new 150 kVA transformer and power panels for new transmitters; electrical wiring of transmitters, pumps, and loads.

Interim CH 33 Antenna Installation

Costs for installation of new CH 33 interim antenna required to meet the Phase 2 deadline.

Interim Facility Transmission Line Upgrade

Larger transmission line is needed to increase ERP of interim facility to address lost coverage during transition.

Interim and Final Transmission Line Components

Transmission line components for interim and final configuration not covered elsewhere.

Replacement Coaxial Switching System

Dielectric has advised that re-use of the existing waveguide switching system is not practical. A replacement coaxial system is required instead.

Temporary Antenna Installation

A temporary antenna installation on the tower ice bridge is required during installation of the new antenna.

Glycol Recycling

Cost of recycling used glycol from decommissioned main transmitter.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,230,850.00 $1,105,260.34 N/A $1,071,460.34 N/A
Total for all systems $2,306,078.79 $1,970,601.13 N/A $1,806,589.79 N/A
Primary Transmitter ULXTE-50 $927,232.34 $925,982.34 $892,182.34
Site Survey $6,500.00 $6,500.00 Site survey is required to determine plan for replacement transmitter installation. N/A N/A
Other Electrical Service: Disconnection of existing. $1,500.00 $1,500.00 N/A N/A N/A
1" Rigid Conduit and Wiring $1,500.00 $1,500.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 31.7 kW $892,182.34 $892,182.34 Estimated cost revised to reflect 2 change orders to original quote and to reflect actual shipping cost. Refer to GatesAir Invoice US0323277 for details. Estimate also increased to reflect cost of de-ionized water needed for cooling system. $892,182.34 Estimated cost for ULXTE-50 Transmitter System revised on 4/17/2019 to reflect 2 change orders to original quote and to reflect actual shipping cost.
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,300.00 N/A N/A N/A
Auxiliary Transmitter UAXTE-6R44 $303,617.66 $179,278.00 $179,278.00
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW $155,600.00 $31,260.34 Estimated cost increased to cover two remaining GatesAir invoices for the Air Cooled Solid State backup transmitter. $31,260.34 N/A
UHF - Air Cooled Solid State Transmitter 3.6 kW $148,017.66 $148,017.66 ***System Notice: Estimate adjusted and locked because line has been superseded.***See GatesAir quote Q-63424 uploaded with this application. $148,017.66 N/A

Components

Actual Information Description File Name
Site Survey Information not provided.
Other Electrical Service: Disconnection of existing. Information not provided.
1" Rigid Conduit and Wiring Information not provided.
UHF - Liquid Cooled Solid State Transmitter 31.7 kW

Component Description:
Deionized water provided for primary transmitter installation.
Amount:
$461.30

Component Description:
25% Payment due 8/30/18 for main transmitter
Amount:
$214,271.29

Component Description:
Initial payment with order for ULXTE-50 Transmitter System
Amount:
$217,021.29

Component Description:
Invoice for payment due after transmitter installation is complete.
Amount:
$120,294.89

Component Description:
Invoice #2 for Main Transmitter - 25% installment due 5/30/2018
Amount:
$214,271.29

Component Description:
Payment due after shipment of equipment.
Amount:
$125,862.28
Transformer 3 phase/480v - 150 KVA Information not provided.
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW

Component Description:
Invoice on completion of installation.
Amount:
$17,460.34

Component Description:
Invoice for Channel Change 18 to 33.
Amount:
$13,800.00
UHF - Air Cooled Solid State Transmitter 3.6 kW

Component Description:
1/3 Down Payment for Auxiliary/Backup Transmitter
Amount:
$55,620.57

Component Description:
Invoice for onsite training in new transmitters (main and backup) for KRMA staff.
Amount:
$5,418.00

Component Description:
1/3 payment due prior to shipping for Auxiliary/Backup Transmitter
Amount:
$55,620.57

Component Description:
Invoice for payment due after shipment of equipment.
Amount:
$31,358.52

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $586,962.12 $546,072.12 N/A $543,654.62 N/A
Total for all systems $2,306,078.79 $1,970,601.13 N/A $1,806,589.79 N/A
Interim Antenna SFN-2030-5645-16 $75,507.00 $75,327.00 $72,909.50
Sweep test of existing antenna $6,730.00 $6,550.00 N/A $4,132.50 N/A
UHF - Lower Power, Side Mount, Class A, basic slot antenna, 115 kW input, directional,, elliptically or circularly polarized $45,645.00 $45,645.00 Updated estimated cost includes shipping billed on invoice C2186-B. $45,645.00 N/A
Coaxial Switch for Interim Antenna $23,132.00 $23,132.00 A coaxial switch is required to feed interim antenna from transmitter RF system. See Proposal 180177SM from Dielectric for costs. $23,132.00 N/A
Primary Antenna TFU-38DSC/VP-R C190 $511,455.12 $470,745.12 $470,745.12
Freight $16,220.35 $16,220.35 Freight Cost to Denver, Colorado provided in Dielectric email dated 6/22/17; however, actual costs were higher. $16,220.35 N/A
Installation $84,470.00 $84,470.00 Estimate increased to cover installation of transmission line needed to increase power to interim antenna used during main antenna replacement. $84,470.00 N/A
Transportation to site $0.00 $0.00 Included in antenna installation cost. N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $0.00 This cost is now included in antenna base cost. N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized $370,054.77 $370,054.77 Several line items are now consolidated in this line, including antenna, scatter analysis, side-mount brackets, elbow complex and transmission line. Estimate increased to cover additional transmission line and shipping costs. $370,054.77 Actual costs are reported on the line corresponding to the antenna as the invoices from the manufacturer are not broken down according to the categories listed in the estimated costs column.
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $0.00 This cost is now included in antenna base cost. N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $0.00 This cost is now included in antenna base cost. N/A N/A

Components

Actual Information Description File Name
Sweep test of existing antenna

Component Description:
Sweep testing of existing antenna intended for interim use during main antenna replacement.
Amount:
$4,132.50
UHF - Lower Power, Side Mount, Class A, basic slot antenna, 115 kW input, directional,, elliptically or circularly polarized

Component Description:
Final payment including shipping for interim CH 33 antenna.
Amount:
$23,247.50

Component Description:
50% payment with order
Amount:
$22,397.50
Coaxial Switch for Interim Antenna

Component Description:
50% payment due with order.
Amount:
$11,566.00

Component Description:
50% due prior to shipment.
Amount:
$11,566.00
Freight

Component Description:
Shipping charges for antenna and transmission line.
Amount:
$14,762.25

Component Description:
Freight charges for RF component shipments.
Amount:
$1,458.10
Installation

Component Description:
Invoice for main antenna and transmission line replacement, plus installation of transmission line to increase power to interim antenna used during replacement.
Amount:
$84,470.00
Transportation to site Information not provided.
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized

Component Description:
Invoice for current balance due. Shipping and site visit to be invoiced later.
Amount:
$32,484.73

Component Description:
Invoice for 45% due prior to shipment; invoice includes adjustments for two change orders, also attached. This is a corrected invoice to accurately describe the side-mount antenna.
Amount:
$165,171.15

Component Description:
This invoice for 4 cut sections of transmission line to complete installation plus freight with justification for overnight shipping.
Amount:
$13,335.77

Component Description:
Initial payment with order for TFU-38DSC/VP-R high power antenna.
Amount:
$159,063.12
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $76,558.00 $0.00 N/A $0.00 N/A
Total for all systems $2,306,078.79 $1,970,601.13 N/A $1,806,589.79 N/A
Primary Transmission Line $76,558.00 $0.00 $0.00
Rigid Transmission Line - copper, 6 1/8" $76,558.00 $0.00 This cost is now included in antenna base cost as Dielectric provided a single sales order and invoices for antenna and transmission line. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $96,800.00 $12,000.00 N/A $6,939.90 N/A
Total for all systems $2,306,078.79 $1,970,601.13 N/A $1,806,589.79 N/A
Primary Tower TOWER $96,800.00 $12,000.00 $6,939.90
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $6,939.90 N/A
Short Tower (less than 500') $84,200.00 $0.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
Tower Analysis - Main Tower - Labor for December 2017 - Includes PO #22547
Amount:
$1,064.90

Component Description:
Tower Analysis - Main Tower - January Labor - Includes PO #22547
Amount:
$3,275.00

Component Description:
Invoice for structural study of an Andrew ALP8 interim antenna to be mounted on ice bridge of tower.
Amount:
$1,000.00

Component Description:
A second interim antenna study was required as the first antenna studied did not pass RFR requirements. Please see memo attached to invoice for cost explanation.
Amount:
$500.00

Component Description:
Structural analysis for mounting the new Micronetixx CH 33 interim antenna on existing ice bridge.
Amount:
$1,100.00

Component Description:
Invoice for structural study for mounting interim antenna during main antenna replacement.
Amount:
$1,000.00
Short Tower (less than 500') Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $132,340.00 $125,250.00 N/A $64,218.50 N/A
Total for all systems $2,306,078.79 $1,970,601.13 N/A $1,806,589.79 N/A
Outside Professional Services $132,340.00 $125,250.00 $64,218.50
Project management of the transition $79,000.00 $75,000.00 N/A $44,496.75 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A $13,363.50 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $4,952.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $806.25 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $600.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $0.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Preparation of STA for temporary operation during main antenna replacement.
Amount:
$356.25

Component Description:
Project Management Fees - November 2018
Amount:
$2,793.75

Component Description:
Legal advice or assistance with management of project.
Amount:
$1,005.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$1,020.00

Component Description:
Legal advice related to management of project
Amount:
$150.00

Component Description:
Legal advice related to management of project.
Amount:
$156.00

Component Description:
Project management fees for the period from October 2019 through February 2020 inclusive.
Amount:
$262.50

Component Description:
Legal advice related to management of project.
Amount:
$1,724.00

Component Description:
Legal advice related to management of the project for the month of October 2019.
Amount:
$300.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$842.00

Component Description:
Project Management Fees - June 2018
Amount:
$975.00

Component Description:
Project Management Fees - April 2018
Amount:
$225.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$1,955.00

Component Description:
Project Management Fees - May 2018
Amount:
$1,218.75

Component Description:
Legal advice or assistance with management of project.
Amount:
$2,252.00

Component Description:
Project Management Fees for January 2019
Amount:
$1,575.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$1,749.00

Component Description:
Legal advice related to management of project - line items for 2/6 and 2/14 only
Amount:
$300.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$415.00

Component Description:
Project Management Fees - June 2017 (includes all line items except 6/26 and 6/27).
Amount:
$1,275.00

Component Description:
Project Management Fees for April 2017.
Amount:
$600.00

Component Description:
Repack Project Management Fees - September 2018
Amount:
$975.00

Component Description:
Project Management Fees - February 2018
Amount:
$506.25

Component Description:
Project Management Fees - May 2019
Amount:
$2,325.00

Component Description:
Project Management Fees - November 2017
Amount:
$300.00

Component Description:
Project Management Fees - July 2017 (all line items except 7/6/17)
Amount:
$656.25

Component Description:
Repack Project Management for April 2019
Amount:
$2,756.25

Component Description:
Repack Project Management for March 2019
Amount:
$2,587.50

Component Description:
Repack Project Management Fees - January 2018
Amount:
$731.25

Component Description:
Legal advice related to management of project - December 2017
Amount:
$50.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$1,885.00

Component Description:
Project Management Fees for the month of December 2017
Amount:
$937.50

Component Description:
Project Management Fees for February 2019
Amount:
$975.00

Component Description:
Project Management Fees - May 2017
Amount:
$1,125.00

Component Description:
Project Management Fees - June to September 2019
Amount:
$993.75

Component Description:
Project Management Fees - August 2017
Amount:
$150.00

Component Description:
Legal Advice related to management of project - January 2018
Amount:
$800.00

Component Description:
Project Management Fees - October 2017
Amount:
$225.00

Component Description:
Project Management Fees - December 2018
Amount:
$1,275.00

Component Description:
Project Management Fees - September 2017
Amount:
$450.00

Component Description:
Project Management Fees - July-August 2018
Amount:
$1,575.00

Component Description:
Legal advice or assistance with management of project.
Amount:
$350.00

Component Description:
Legal advice related to management of project - line item from 2/6/2018 only.
Amount:
$50.00

Component Description:
Legal Advice related to management of project
Amount:
$50.00

Component Description:
Repack Project Management Fees - October 2018
Amount:
$1,218.75

Component Description:
Project Management Fees - March 2018
Amount:
$450.00
RF Exposure Measurements

Component Description:
Final NIER measurements and report for main and interim antenna.
Amount:
$8,518.50

Component Description:
Perform RF exposure study of KRMA transmitter site and submit study with Jefferson County telecom permit application.
Amount:
$4,845.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Legal Fees
Amount:
$139.00

Component Description:
Legal Fees
Amount:
$878.00

Component Description:
Legal Fees
Amount:
$600.00

Component Description:
Legal Fees
Amount:
$917.00

Component Description:
Legal Fees
Amount:
$2,418.00
Prepare request for Special Temporary Authorization

Component Description:
Preparation of 2nd STA for KRMA interim operation. This application was for CH 33 and was approved by the FCC on 3/6/2019.
Amount:
$450.00

Component Description:
Preparation of STA for temporary operation during main antenna replacement
Amount:
$356.25
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Engineering Fees for CP Application - line item for 7/6 only
Amount:
$150.00

Component Description:
Engineering Fees for Preparation of CP Application - line items for 6/26 and 6/27/17.
Amount:
$450.00
Perform engineering study for new channel assignment and antenna development Information not provided.
Prepare and or review reimbursement form Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $182,568.67 $182,018.67 N/A $120,316.43 N/A
Total for all systems $2,306,078.79 $1,970,601.13 N/A $1,806,589.79 N/A
Other Expenses $182,568.67 $182,018.67 $120,316.43
Glycol Recycling $66.00 $66.00 Cost estimate based on actual invoice 8418 from G2 Solutions. $66.00 N/A
Temporary Antenna Installation $14,870.00 $14,870.00 RMPBS planned to use a used RF Technologies SFN CH 18 antenna during main antenna replacement. This antenna was found to be defective. It required troubleshooting in place and de-installation at extra cost. See Rex Industries Estimate 217-334 for details. $14,870.00 N/A
Replacement Coaxial Switching System $23,757.03 $23,757.03 See Dielectric quote 180074ASM to replace an existing waveguide switching system (main and backup transmitter, antenna and load) that cannot be used on the new channel. Estimated cost increased to cover actual shipping charges. $23,757.03 N/A
Interim and Final Transmission Line Components $5,627.21 $5,627.21 Transmission line components required for interim and final installations, not included elsewhere. Quotes obtained and items purchased as required. Each invoice includes a justification. Estimate increased by $195.37 to include pressure manifold. $5,627.21 N/A
MVPD Notification of Channel Change $3,926.00 $3,926.00 A second notification was required due to unavoidable delays in completing the new antenna installation and repack channel change. Estimated cost increased accordingly. $3,926.00 N/A
Equipment Delivery and Handling Charges $12,597.40 $12,597.40 Towing company 4WD transport of transmitters to site. Forklift rental to lift transmitters to 2nd floor entrance of transmitter building. See individual invoices for details. Revised estimated cost includes insurance rider for equipment in transit. $12,597.40 Original cost estimate was based on transportation direct to site; actual cost also included temporary offloading and storage due to bad weather that delayed access to the mountaintop site.
Disposal Costs (for equipment and other waste, net of any salvage value) $48,495.00 $48,495.00 N/A N/A N/A
Local Zoning $5,000.00 $5,000.00 N/A N/A N/A
Interim Facility Transmission Line Upgrade $7,877.03 $7,877.03 Please refer to justification attached to RFSTX Quotation 6347-01. Estimated cost increased by $1,254.00 to include freight, handling and insurance. $7,877.03 N/A
Interim CH 33 Antenna Installation $9,750.00 $9,750.00 Refer to cost estimate included with Rex Industries Invoice 7423 attached. $9,750.00 N/A
Electrical Installation for Main and Backup Transmitters $34,553.00 $34,553.00 Estimate from Greiner Electric LLC to implement electrical design for replacement main and backup transmitters; install new 150 kVA transformer, power panels, and wiring to transmitters, pump modules, switches, and loads. Includes permit and inspection. $33,071.76 N/A
Electrical Design Engineering $3,000.00 $3,000.00 Cost estimate based on verbal quote from Green Mountain Electrical Consultants. $2,800.00 N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $5,974.00 N/A

Components

Actual Information Description File Name
Glycol Recycling

Component Description:
Invoice and credit card receipt for used glycol recycling.
Amount:
$66.00
Temporary Antenna Installation

Component Description:
Mounting and de-mounting of interim CH 18 antenna including in-place troubleshooting of high VSWR.
Amount:
$14,870.00
Replacement Coaxial Switching System

Component Description:
Invoice for completed shipment of budgeted components.
Amount:
$23,757.03
Interim and Final Transmission Line Components

Component Description:
Pressure manifold required to permit pressurization of interim and main antenna transmission lines with single dehydrator.
Amount:
$195.37

Component Description:
3-1/8" to type N reducer required for sweep testing of interim antenna transmission line
Amount:
$637.36

Component Description:
30 feet of 1-5/8" flexible transmission line with connectors and adapter to connect new backup transmitter to interim antenna while main transmitter and antenna are replaced.
Amount:
$1,895.85

Component Description:
1-5/8" flange gas barrier for interim antenna transmission line.
Amount:
$274.05

Component Description:
A 6-1/8" directional coupler to provide test monitoring of the main RF signal was not included in the GatesAir or Dielectric proposals. This is an essential item that was ordered separately.
Amount:
$2,624.58
MVPD Notification of Channel Change

Component Description:
Invoice for 2nd notification due to unavoidable delays in repack project.
Amount:
$1,963.00

Component Description:
DTVNotification Invoice INV-001908 - KRMA MVPD Notifications with Estimate.
Amount:
$1,963.00
Equipment Delivery and Handling Charges

Component Description:
Transportation of transmitters to Mt. Morrison via 4WD flatbed vehicle. Revised invoice includes timesheet.
Amount:
$7,635.00

Component Description:
Fueling charge for forklift rental.
Amount:
$38.33

Component Description:
Add trip transit coverage - delivery of transmitters to Mt. Morrison site.
Amount:
$1,500.00

Component Description:
Heavy duty forklift was required to move transmitter equipment into 2nd floor entrance of transmitter building. Estimate obtained for one week rental. Due to weather delays rental had to be extended past 2 weeks (4 week rental).
Amount:
$3,424.07
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Local Zoning Information not provided.
Interim Facility Transmission Line Upgrade

Component Description:
3" transmission line and connectors for interim CH 33 facility.
Amount:
$7,877.03
Interim CH 33 Antenna Installation

Component Description:
Installation of new CH 33 interim antenna required to meet Phase 2 deadline for transition to new channel.
Amount:
$9,750.00
Electrical Installation for Main and Backup Transmitters

Component Description:
Final invoice for electrical work to install replacement transmitters.
Amount:
$33,071.76
Electrical Design Engineering

Component Description:
Engineering of transmitter electrical facilities
Amount:
$2,800.00
Develop and air announcement of upcoming channel change Information not provided.
DTV Medical Facility Notification

Component Description:
DTVNotification Invoice INV-001909 - KRMA Medical Notifications with Estimate
Amount:
$2,987.00

Component Description:
A second notification was required due to unavoidable delays in completing the new antenna installation and repack channel change.
Amount:
$2,987.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,306,078.79 $1,970,601.13 $1,806,589.79

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Doug Houston

Chief Technical Officer


04/10/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Doug Houston

Chief Technical Officer


04/10/2020

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Doug Houston

Chief Technical Officer


04/10/2020

Attachments