Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WAND(TV) PARTNERSHIP |
Keith Wilkowski 624 W. MUHAMMAD ALI BLVD. LOUISVILLE, KY 40203 United States |
+1 (419) 724-7276 | kwilkowski@blockcommunications.com | Limited Partnership |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Robert Gunther Chief Engineer WAND(TV) Partnership |
Robert Gunther 904 Southside Drive Decatur, IL 62521 United States |
+1 (217) 424-2500 | Robert.Gunther@wandtv.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | New transmitter will be placed in existing building. A side mount antenna will be placed on existing tower until time to shut down current transmitter and put new TX online and correct primary antenna placed on top of the tower. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Refurbished HP50DDW | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-90 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 50 kW | |
Justification for New Transmitter | Existing unit is outdated and can not be re-tuned to new specs. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Parallel Surge Suppressor for 3PH WYE or DELTA (Lightning and surge protection). | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
State and local sales tax on transmitter |
State and Local Sales tax on the new transmitter. |
Building Electrical work |
Install electrical system components in building by ALLTECH Electric |
Installation services |
Fees for installing the transmitter and inside RF system. |
State and local sales tax on materials needed for electrical service |
State and Local Sales tax on materials relating to electrical installation |
Transmitter Electrical Work |
Electrical work for installation of GatesAir transmitter |
Shipping |
Shipping charges for transmitter components |
RF Accessories |
RF system components necessary for the interim use and permanent install of the new transmitter |
Mask Filter |
Filter for preventing out of band emmisions |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-31JTH/VP-R T110C | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ATW30H3-ETTX-20H | |
Year | 2017 | |
Justification for New Antenna | Changing from channel 17 to channel 20. Current equipment cannot be used for the new channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Reducer |
Transmission line reducer-two needed |
Transformer |
Matching transformer for new transmission line-two needed |
State and Local Sales Tax |
State and local sales tax in the amount of 9.25% is calculated on the total cost, bringing the total amount to 627937.32 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 16 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 695.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 435.3 kW | |
Manufacturer | ||
Model | ATW16H9-ESO-17/20L | |
Year | 2017 | |
Justification for New Antenna | Interim side mount antenna to be put in place while primary antenna and feedline is replaced to minimize loss of on air time. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | S | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Transformer |
Matching transformer for new transmission line. |
Sales Tax |
State and local sales tax is calculated at 9.25% on the amount of the total sale, bringing the total cost to 383011.38 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 3/4 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1350 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 3/4 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1200 feet per run | |
Justification for New Transmission Line | Current equipment cannot be used for the new channel. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | 19 ¾ ' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1350 feet per run | |
Justification for New Transmission Line | Current transmission line cannot be used with new channel assignment of channel 20 |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1009651 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 57' 08.6" N- |
Longitude (NAD83) | 088° 49' 56.6" W- | |
Overall Structure Height | 1313.96 feet | |
Support Structure Height | 1243.10 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 686.02 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WAND(TV) Partnership | |
Date Constructed | 10/01/1980 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | WDRB does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | No |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Attorney Fees and Other Matters |
Other re-pack legal services. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
Rental of heavy equipment |
rental of forklift or sky-jack to off load transmitter antennas and transmission line and other equipment. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,901,501.57 | $1,751,173.73 | N/A | $1,745,863.88 | N/A |
Total for all systems | $3,764,546.87 | $3,434,053.03 | N/A | $1,960,693.55 | N/A |
Primary Transmitter ULXTE-90 | $1,901,501.57 | $1,751,173.73 | $1,745,863.88 | ||
Mask Filter | $56,125.88 | $56,125.88 | N/A | $56,125.88 | N/A |
RF Accessories | $122,228.17 | $122,228.17 | N/A | $122,228.17 | N/A |
Transmitter Electrical Work | $12,101.82 | $12,101.82 | N/A | $12,101.82 | N/A |
State and local sales tax on materials needed for electrical service | $0.00 | $0.00 | N/A | $0.00 | N/A |
Installation services | $81,690.50 | $81,690.50 | N/A | $81,690.50 | N/A |
Building Electrical work | $0.00 | $0.00 | N/A | $0.00 | N/A |
State and local sales tax on transmitter | $106,055.20 | $106,055.20 | N/A | $100,745.35 | N/A |
Other Electrical Service: Parallel Surge Suppressor for 3PH WYE or DELTA (Lightning and surge protection). | $0.00 | $0.00 | N/A | $0.00 | N/A |
Shipping | $13,500.00 | $13,500.00 | N/A | $13,500.00 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $0.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,359,472.16 | N/A | $1,359,472.16 | N/A |
Actual Information Description | File Name |
---|---|
Mask Filter | |
RF Accessories | |
Transmitter Electrical Work | |
State and local sales tax on materials needed for electrical service | Information not provided. |
Installation services | |
Building Electrical work | Information not provided. |
State and local sales tax on transmitter | |
Other Electrical Service: Parallel Surge Suppressor for 3PH WYE or DELTA (Lightning and surge protection). | Information not provided. |
Shipping | |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $686,650.20 | $530,160.20 | N/A | $44,486.19 | N/A |
Total for all systems | $3,764,546.87 | $3,434,053.03 | N/A | $1,960,693.55 | N/A |
Interim Antenna ATW16H9-ESO-17/20L | $309,506.88 | $193,091.88 | $44,486.19 | ||
Transformer | $7,898.00 | $7,898.00 | Two transformers are required for impedance matching for interim antenna, primary antenna and transmitter. | $0.00 | N/A |
Sales Tax | $32,428.88 | $32,428.88 | N/A | $0.00 | N/A |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | $227,000.00 | $125,250.00 | N/A | $36,525.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,250.00 | N/A | $1,875.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $8,065.00 | Price quoted by manufacturer, quote attached. | $2,126.19 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $13,200.00 | N/A | $3,960.00 | N/A |
Primary Antenna ATW30H3-ETTX-20H | $377,143.32 | $337,068.32 | $0.00 | ||
State and Local Sales Tax | $53,166.32 | $53,166.32 | N/A | $0.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,250.00 | N/A | $0.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $253,250.00 | N/A | $0.00 | N/A |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | $15,250.00 | $11,905.00 | N/A | $0.00 | N/A |
Transformer | $7,897.00 | $7,897.00 | Two transformers are required for impedance matching for interim antenna, primary antenna and transmitter. | $0.00 | N/A |
Reducer | $4,600.00 | $4,600.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Transformer | Information not provided. |
Sales Tax | Information not provided. |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | |
Sweep test of existing antenna | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
State and Local Sales Tax | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | Information not provided. |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | Information not provided. |
Transformer | Information not provided. |
Reducer | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $689,100.00 | $583,665.00 | N/A | $52,731.48 | N/A |
Total for all systems | $3,764,546.87 | $3,434,053.03 | N/A | $1,960,693.55 | N/A |
Interim Transmission Line | $272,700.00 | $202,019.00 | $52,731.48 | ||
Rigid Transmission Line - copper, 6 1/8" | $272,700.00 | $202,019.00 | N/A | $52,731.48 | N/A |
Primary Transmission Line | $416,400.00 | $381,646.00 | $0.00 | ||
Rigid Transmission Line - copper, 8 3/16" | $416,400.00 | $381,646.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 8 3/16" | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $223,100.00 | $323,891.00 | N/A | $39,834.30 | N/A |
Total for all systems | $3,764,546.87 | $3,434,053.03 | N/A | $1,960,693.55 | N/A |
Primary Tower TOWER | $223,100.00 | $323,891.00 | $39,834.30 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $8,000.00 | N/A | $0.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $315,891.00 | Per ERI Quotes for Main and Interim Antennas | $39,834.30 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | Information not provided. |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $249,615.10 | $239,610.10 | N/A | $77,777.70 | N/A |
Total for all systems | $3,764,546.87 | $3,434,053.03 | N/A | $1,960,693.55 | N/A |
Outside Professional Services | $249,615.10 | $239,610.10 | $77,777.70 | ||
Attorney Fees and Other Matters | $20,110.10 | $20,110.10 | Please see the attached invoices from COOLEY (Attorneys at law) # 1777272, 1793256 and 1800012 | $17,094.50 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | $0.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | $0.00 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | $0.00 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $471.50 | N/A |
Project management of the transition | $94,010.00 | $90,750.00 | See Justifying Quote - WAND Strategic Support Quote Widelity | $60,211.70 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees and Other Matters | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Project management of the transition | |
Prepare and or review reimbursement form | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $14,580.00 | $5,553.00 | N/A | $0.00 | N/A |
Total for all systems | $3,764,546.87 | $3,434,053.03 | N/A | $1,960,693.55 | N/A |
Other Expenses | $14,580.00 | $5,553.00 | $0.00 | ||
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,538.00 | N/A | $0.00 | N/A |
Rental of heavy equipment | $2,500.00 | $2,500.00 | N/A | $0.00 | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,764,546.87 | $3,434,053.03 | $1,960,693.55 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Wilkowski VP, Legal & Governmental Affairs 02/28/2020 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Wilkowski VP, Legal & Governmental Affairs 02/28/2020 |