Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
ONEIDA COUNTY TRANSLATOR DISTRICT Doing Business As: ONEIDA COUNTY TRANSLATOR DISTRICT |
ONEIDA COUNTY TRANSLATOR DISTRICT 10 COURT STREET MALAD CITY, ID 83252 United States |
+1 (208) 766-4405 | NAJAUSSI@YAHOO.COM | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Transition K47MH-D to K25PO-D. Install new Antenna and channel combiner. Coordinated efforts with Idaho Public Television to design new relay from Holbrook to Malad for KISU, KIDK. Added a new facility. Costs shared with Idaho Public Television. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | No | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Paraslot | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | SL8-3 | |
Year | 2014 |
Facility ID | Call Sign |
---|---|
191248 | K31PJ-D |
182578 | K21OA-D |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels/Bays | 4 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 40.0 % | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | K72314 | |
Year | 2018 | |
Justification for New Antenna | The original para slot antenna was made for UHF channels 43,45,47 and was not re-tunable. A new broadband antenna was needed. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Power Dividers | Does the panel antenna require power dividers? | No |
Cable Harness | Does the panel antenna require cable harness? | No |
RF Channel Number |
---|
31 |
21 |
25 |
Name | Description |
---|---|
Antenna Installation |
Installation of new Antenna array by CWC Construction. |
Antenna Clamps |
Additional mounting clamps needed due to Salesperson Error on original order. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Jaussi Electronics |
Planning and Engineering services for transitioning K47MH-D to new channel |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Air conditioners |
Air conditioners for new building |
Anywave exciters |
Quantity of two purchased for new relay. |
B. W. St. Clair |
STA preparation and filing |
Ken Eliason |
Back Hoe work for new building |
New Building for relay |
New building for KIDK, KISU relay to Malad |
VHF Transmitter |
VHF transmitter for New relay for KIDK and KISU Idaho public Television |
new building wiring |
New building wiring charges from D & T Electric |
transmission line |
Transmission line used for transmit and receive antennas for KISU, KIDK relay |
Border States electrical |
building electrical supplies 1 |
Electrical wholesale.002 |
building electrical s4524447.002 |
Hess Lumber 10-31-18 |
building electrical 10/31/18 |
Hess lumber 8-31-18 |
building Electrical 8-31-18 |
lowes, home depot |
lowe's, home depot electrical supplies |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $24,935.77 | $11,634.03 | N/A | $0.00 | N/A |
Total for all systems | $63,726.11 | $48,724.37 | N/A | $0.00 | N/A |
Primary Antenna K72314 | $24,935.77 | $11,634.03 | $0.00 | ||
Antenna Installation | $2,280.00 | $2,280.00 | N/A | N/A | N/A |
Antenna Clamps | $1,555.77 | $1,555.77 | N/A | N/A | N/A |
1 kW UHF Combiner (per channel) | $14,100.00 | $2,200.00 | N/A | N/A | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $7,000.00 | $5,598.26 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,527.27 | $827.27 | N/A | $0.00 | N/A |
Total for all systems | $63,726.11 | $48,724.37 | N/A | $0.00 | N/A |
Outside Professional Services | $2,527.27 | $827.27 | $0.00 | ||
Jaussi Electronics | $727.27 | $727.27 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $100.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $36,263.07 | $36,263.07 | N/A | $0.00 | N/A |
Total for all systems | $63,726.11 | $48,724.37 | N/A | $0.00 | N/A |
Other Expenses | $36,263.07 | $36,263.07 | $0.00 | ||
Border States electrical | $146.57 | $146.57 | N/A | N/A | N/A |
Hess Lumber 10-31-18 | $215.04 | $215.04 | N/A | N/A | N/A |
Hess lumber 8-31-18 | $1,072.92 | $1,072.92 | N/A | N/A | N/A |
Electrical wholesale.002 | $228.99 | $228.99 | N/A | N/A | N/A |
New Building for relay | $15,275.00 | $15,275.00 | N/A | N/A | N/A |
Ken Eliason | $350.00 | $350.00 | N/A | N/A | N/A |
B. W. St. Clair | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Anywave exciters | $7,880.00 | $7,880.00 | N/A | N/A | N/A |
Air conditioners | $5,660.00 | $5,660.00 | N/A | N/A | N/A |
lowes, home depot | $329.83 | $329.83 | N/A | N/A | N/A |
transmission line | $244.80 | $244.80 | N/A | N/A | N/A |
new building wiring | $1,799.92 | $1,799.92 | N/A | N/A | N/A |
VHF Transmitter | $1,260.00 | $1,260.00 | N/A | $0.00 | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $63,726.11 | $48,724.37 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William C. Jaussi Reimbursement contact 11/14/2019 |