Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
RADIO LICENSE HOLDING SRC LLC Doing Business As: RADIO LICENSE HOLDING SRC LLC |
3280 Peachtree Road, NW Suite 2200 Atlanta, GA 30305 United States |
+1 (404) 949-0700 | FCCLicenseManagement@cumulus.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Cynthia M. Jacobson , P.E. . Consulting Engineer Carl T. Jones Corp. |
7901 Yarnwood Court Springfield, VA 22153 United States |
+1 (703) 569-7704 | cjacob@ctjc.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | FM AUXILIARY FACILITY for WWWQ-FM (FM Impacted by TV Repack). This is to use an existing community antenna with a new transmitter to maintain analog and HD signals during TV Repack work at MAIN site. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | No model | |
Year | 2017 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Hybrid | |
Solid State Power Capacity | 40 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | FAX20 FM/HD | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Hybrid | |
Solid State Power capacity | 20 kW | |
Justification for New Transmitter | Needed for New Auxiliary FM site to keep WWWQ-FM on the air during the TV Repack with its analog and digital signals. | |
Does the transmitter require the purchase of a new HD Importer? | Yes | |
Does the transmitter require the purchase of a new HD Exporter? | Yes |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | Does the transmitter installation require an Additional Exciter? | No |
Does the transmitter installation require any additional transmitter installation costs? | Yes | |
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 2.50 inches | |
Length | 75.0 feet | |
Other Electrical Service | Yes | |
Description | Electrical Entrance Panel and wiring to the transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Other Transmitter-Related Expenses | Does the replacement transmitter require a Remote Control? | Yes |
Does the replacement transmitter require an RDS Encoder? | Yes | |
Does the replacement transmitter require Audio Processing? | Yes | |
Audio Processing | Analog/HD Basic |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | No | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1/2 inches | |
Number of parallel runs | 1 | |
Length | 10 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 150 feet per run | |
Justification for New Transmission Line | New line from New transmitter to existing combiner (using existing transmission line to community FM antenna). | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? | Yes |
Name | Description |
---|---|
Inside Lline Installation |
Inside Line Installation Costs Xmtr to Combiner |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 175 | |
Explanation | Project Management of the transition | |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Internal Employee Time Costs |
Internal Employee Time Costs |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | Yes |
Name | Description |
---|---|
Antenna Tune and IM check |
ERI Factory 73.317 tests and report, tune and IM report |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $370,459.85 | $378,646.06 | N/A | $0.00 | N/A |
Total for all systems | $465,686.35 | $473,872.56 | N/A | $0.00 | N/A |
Primary Transmitter FAX20 FM/HD | $370,459.85 | $378,646.06 | $0.00 | ||
2.50" Rigid Conduit and Wiring | $1,659.00 | $1,659.00 | See attached invoice from Maclean-Riggins | N/A | N/A |
Other Electrical Service: Electrical Entrance Panel and wiring to the transmitter. | $47,195.00 | $47,195.00 | Total of the attached JR Electrical invoices #2017-997, #2018-1193 and #2019-1368 | N/A | N/A |
Filter | $79,605.85 | $79,605.85 | Total of net package price $73,127.40, sales tax and freight cost. See attached quote from ERI for net package price. | N/A | N/A |
Audio Processing - Analog/HD basic | $4,750.00 | $4,750.00 | N/A | N/A | N/A |
Other Transmitter-Related Expenses RDS Encoder | $1,750.00 | $1,750.00 | N/A | N/A | N/A |
Other Transmitter-Related Expenses Remote Control | $2,400.00 | $2,400.00 | N/A | N/A | N/A |
Transmitter Installation | $70,500.00 | $70,500.00 | N/A | N/A | N/A |
10 Ton system | $38,900.00 | $38,900.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,400.00 | N/A | N/A | N/A |
HD Importer | $2,550.00 | $2,550.00 | N/A | N/A | N/A |
HD Exporter | $2,550.00 | $2,550.00 | N/A | N/A | N/A |
Air Cooled Solid State FM Transmitter 15 - 20 kW Hybrid | $104,200.00 | $112,386.21 | See Gates Air quote. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $58,279.00 | $58,279.00 | N/A | $0.00 | N/A |
Total for all systems | $465,686.35 | $473,872.56 | N/A | $0.00 | N/A |
Primary Transmission Line | $58,279.00 | $58,279.00 | $0.00 | ||
Inside Lline Installation | $17,500.00 | $17,500.00 | Install 150 feet 3 1/8 inch line from 3rd floor combiner room to 1st floor transmitter room. See attached invoice from American Antennas. | N/A | N/A |
Flexible Air Transmission Line - dielectric, 3" | $8,850.00 | $8,850.00 | N/A | N/A | N/A |
Interior RF Systems: Elbows, fitting, hangers, etc. | $27,929.00 | $27,929.00 | See attached quote from BGS | N/A | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $4,000.00 | $4,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $21,962.50 | $21,962.50 | N/A | $0.00 | N/A |
Total for all systems | $465,686.35 | $473,872.56 | N/A | $0.00 | N/A |
Outside Professional Services | $21,962.50 | $21,962.50 | $0.00 | ||
Project management of the transition | $18,462.50 | $18,462.50 | N/A | N/A | N/A |
Internal Employee Time Costs | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $14,985.00 | $14,985.00 | N/A | $0.00 | N/A |
Total for all systems | $465,686.35 | $473,872.56 | N/A | $0.00 | N/A |
Other Expenses | $14,985.00 | $14,985.00 | $0.00 | ||
Antenna Tune and IM check | $6,600.00 | $6,600.00 | See attached invoice from ERI. | N/A | N/A |
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems | $5,850.00 | $5,850.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $200.00 | $200.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $465,686.35 | $473,872.56 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Richard S. Denning Executive Vice President & General Counsel 10/29/2019 |