Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
BROADWAY MEDIA LS, LLC Doing Business As: BROADWAY MEDIA LS, LLC |
Blake Beyer 50 W Broadway Ste. 200 Salt Lake City, UT 84101 United States |
+1 (801) 524-2600 | bbeyer@bwaymedia.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Trent Anderson Director of Engineering Broadway Media LS, LLC |
Trent Anderson 50 W Broadway Ste. 200 Salt Lake City, UT 84101 United States |
+1 (801) 524-2600 | tanderson@bwaymedia.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | To provide Auxiliaries for KXRK, KKLV, KUDD, KUER we replaced the antenna and transmission line for KUUU to create an auxiliary system that would reduce RFR to proper levels for Repack tower work. |
Question | Response |
---|---|
Sharee Station Facility ID | 37876 |
Call Sign | KUUU |
Type | Commercial |
Licensee Name | BROADWAY MEDIA LS, LLC |
Status | LICENSED |
DTS | No |
Community of License | SOUTH JORDAN, UT |
Pre-auction RF Channel | 223 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 69553 |
Call Sign | KKLV |
Type | Noncommercial Educational |
Licensee Name | EDUCATIONAL MEDIA FOUNDATION |
Status | LICENSED |
DTS | No |
Community of License | KAYSVILLE, UT |
Pre-auction RF Channel | 298 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 69171 |
Call Sign | KUER-FM |
Type | Noncommercial Educational |
Licensee Name | UNIVERSITY OF UTAH |
Status | LICENSED |
DTS | No |
Community of License | SALT LAKE CITY, UT |
Pre-auction RF Channel | 211 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 406 |
Call Sign | KXRK |
Type | Commercial |
Licensee Name | BROADWAY MEDIA LS, LLC |
Status | LICENSED |
DTS | No |
Community of License | PROVO, UT |
Pre-auction RF Channel | 242 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 37766 |
Call Sign | KRCL |
Type | |
Licensee Name | LISTENERS COMMUNITY RADIO OF UTAH, INC. |
Status | LICENSED |
DTS | No |
Community of License | SALT LAKE CITY, UT |
Pre-auction RF Channel | 215 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Bottom | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 35.0 kW | |
Manufacturer | ||
Model | SHPX-2AE-HW | |
Year | 2018 |
Facility ID | Call Sign |
---|---|
69553 | KKLV |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Bottom | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 0.6 kW | |
Manufacturer | ||
Model | SHPX-2AE-HW | |
Year | 2018 | |
Justification for New Antenna | KUDD was required to build a auxiliary to reduce RFR and to stay on air during repack work. KXRK, KUDD, KKLV, KUER all built a shared system by combining into KUUU and replacing its antenna and coax |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 7 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 88.0 MHz - 108.0 MHz | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
FM Band Pass Filters | Do you require an FM band pass filter? | Yes |
Notch Filter | Do you require a Notch filter? | Yes |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | Yes |
Number of bays | 2 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 168 feet per run |
Facility ID | Call Sign |
---|---|
69553 | KKLV |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 168 feet per run | |
Justification for New Transmission Line | new antenna required 3 inch line to be able to handle all station needing an aux during repack | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? | Yes |
Name | Description |
---|---|
Directional coupler |
Coupler required for proof and spurious emissions testing for combined system |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1237796 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 39' 35.0" N- |
Longitude (NAD83) | 112° 12' 07.5" W- | |
Overall Structure Height | 282.15 feet | |
Support Structure Height | 282.15 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9038.60 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Bonneville International Corporation | |
Date Constructed | 08/25/2003 |
Facility ID | Call Sign | Service |
---|---|---|
69553 | KKLV | FM |
406 | KXRK | FM |
69171 | KUER-FM | FM |
37876 | KUUU | FM |
Users |
---|
KSL |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Manufacturer of RF combining system had to install and tune system on site. They also provided RFR and spurious emissions tests. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $57,910.00 | $10,259.32 | N/A | $0.00 | N/A |
Total for all systems | $217,422.00 | $30,136.82 | N/A | $0.00 | N/A |
Primary Antenna SHPX-2AE-HW | $57,910.00 | $10,259.32 | $0.00 | ||
Low Power 200 Watt - 1000 Watt Circularly-polarized | $1,300.00 | $0.00 | N/A | N/A | N/A |
New FM combiner, cost per channel (depends on power input and min. frequency separation) | $21,782.50 | $7,843.32 | N/A | N/A | N/A |
Sweep test of existing antenna | $5,730.00 | $1,741.00 | KUDD's share of cost of new antenna | N/A | N/A |
Radomes (per bay) | $2,700.00 | $675.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $0.00 | $0.00 | N/A | N/A | N/A |
FM Band pass filter (depends on power input and number of sections) | $15,757.50 | $0.00 | N/A | N/A | N/A |
Notch Filter (depends on power input and number of sections) | $10,640.00 | $0.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,537.00 | $5,240.50 | N/A | $0.00 | N/A |
Total for all systems | $217,422.00 | $30,136.82 | N/A | $0.00 | N/A |
Primary Transmission Line | $10,537.00 | $5,240.50 | $0.00 | ||
Interior RF Systems: Elbows, fitting, hangers, etc. | $0.00 | $0.00 | N/A | N/A | N/A |
Flexible Air Transmission Line - dielectric, 3" | $9,912.00 | $4,615.50 | N/A | N/A | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $0.00 | $0.00 | N/A | N/A | N/A |
Directional coupler | $625.00 | $625.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $73,650.00 | $2,637.00 | N/A | $0.00 | N/A |
Total for all systems | $217,422.00 | $30,136.82 | N/A | $0.00 | N/A |
Primary Tower TOWER | $73,650.00 | $2,637.00 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $73,650.00 | $2,637.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $74,240.00 | $10,915.00 | N/A | $0.00 | N/A |
Total for all systems | $217,422.00 | $30,136.82 | N/A | $0.00 | N/A |
Outside Professional Services | $74,240.00 | $10,915.00 | $0.00 | ||
RF Exposure Measurements | $12,100.00 | $1,375.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $750.00 | $750.00 | contour maps provided by contractor | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $0.00 | N/A | N/A | N/A |
Additional Field Engineering Service, 5 Days | $6,325.00 | $6,325.00 | Field service of tuning and installing combiner | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,085.00 | $1,085.00 | N/A | $0.00 | N/A |
Total for all systems | $217,422.00 | $30,136.82 | N/A | $0.00 | N/A |
Other Expenses | $1,085.00 | $1,085.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $750.00 | $750.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $217,422.00 | $30,136.82 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Trent R Anderson Director of Engineering 10/15/2019 |