Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
11135
Service:
LPD
Call Sign:
KYCW-LD
Channel:
24 (UHF)
File Number:
0000089904
FRN:
0018223693
Eligibility Status:
Ineligible
Date Submitted:
11/14/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

GRAY TELEVISION LICENSEE, LLC

4370 PEACHTREE ROAD, NE

ATLANTA, GA 30319

United States

+1 (202) 750-1585 Robert.Folliard@gray.tv Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

Widelity

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan KYCW-LD is planning to upgrade its transmitter, antenna, and transmission line. It will move its transmission location to the KYTV tower in Fordland, Missouri and will combine its line and antenna with KSPR-LD.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Leased
Owner Gray Corporate Engineering
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model UAXT
Year 2015
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 0.9 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model TBD
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 0.9 kW
Justification for New Transmitter KYCW cannot retune the transmitter because it would no provide the new power output needed for repack channel and signal maximization. Please see the narrative and justification letters.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? No
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring No
Other Electrical Service Yes
Description Demolition of existing service, run 480 to transformer and 208 and 110 to transmitter location.
HVAC Service Does the replacement transmitter require HVAC Service? No
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Disposal Costs

Removal of Existing Transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Leased
Owner Gray Corporate Engineering
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 1
Number of Panels 2
Design power capacity in use 50.0 %
Lower Limit 470.00 MHz
Upper Limit 862.00 MHz
ERP: 3.9 kW
Manufacturer
Model K723147 1X2
Year 2017

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 3
Number of Panels/Bays 8
Lower Limit 500.00 MHz
Upper Limit 596.00 MHz
Design power capacity in use 48.3 %
ERP: 15.0 kW
Manufacturer
Model TUM-LP-04 8/32M-1-R
Year 2019
Justification for New Antenna The new antenna is necessary because the pre-displacement antenna could not be retuned to the new channel. This antenna also supports allotted signal maximization and sharing with KSPR. This high gain broadband antenna lowers the price of the transmitter.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 1
Frequencies of channels supported Upper and lower frequency
Frequency 530.0 MHz - 536.0 MHz
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes
Power Dividers Does the panel antenna require power dividers? No
Cable Harness Does the panel antenna require cable harness? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter 7/8 inches
Number of parallel runs 1
Length 200 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Flexible Foam
Diameter 7/8 inches
Number of parallel runs 1
Length 1608 feet per run
Justification for New Transmission Line The new transmission line is necessary due to tower move. The increase in size and length is to accommodate the shared antenna and decrease the TPO on the transmitter.
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? No

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1007779
Coordinates (NAD83) Latitude (NAD83) 37° 10' 59.0" N-
Longitude (NAD83) 093° 18' 13.0" W-
Overall Structure Height 290.35 feet
Support Structure Height 256.56 feet
Ground Elevation Above Mean Sea Level (AMSL) 1289.35 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Gray Television Group, Inc.
Date Constructed 01/01/1961

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
49186 KSPR-LD LPD

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study need for guyed or free-standing tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 254
Explanation KYCW requires the aid of outside project management services.. KYCW does not have sufficient resource capacity and expertise in house to handle all of the reimbursement activities. As such, KYCW will hire an outside firm to facilitate and support KYCW.
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System Yes
Type Unlicensed

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $125,525.00 $136,412.89 N/A $0.00 N/A
Total for all systems $289,957.50 $315,250.76 N/A $0.00 N/A
Primary Transmitter TBD $125,525.00 $136,412.89 $0.00
Other Electrical Service: Demolition of existing service, run 480 to transformer and 208 and 110 to transmitter location. $35,725.00 $35,725.00 Please see justification for the cost on KYCW AC Electrical Proposal. N/A N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $14,400.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 750 - 1000 Watts $29,850.00 $59,275.89 Please see Q-84540 for the Like for like costs for the transmitter. N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $7,012.00 The transformer is only 75 KVA; 150 KVA is the lowest value allowable by LMS. Please see attached quote GatesAir Q-82326r2, justification letter, and narrative. N/A N/A
Disposal Costs $20,000.00 $20,000.00 Please see Quote 2019-R010 for justification of costs. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $29,270.00 $29,940.00 N/A $0.00 N/A
Total for all systems $289,957.50 $315,250.76 N/A $0.00 N/A
Primary Antenna TUM-LP-04 8/32M-1-R $29,270.00 $29,940.00 $0.00
UHF-Low Power, Side Mount, Broadband Panel, 8 bay, 15.0kW input, Elliptical $23,540.00 $23,540.00 Please see JEHQ1698 for justification of costs. N/A N/A
Sweep test of transmission line and antenna $5,730.00 $6,400.00 See JEHQ1698 for justification of costs N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $17,688.00 $15,010.37 N/A $0.00 N/A
Total for all systems $289,957.50 $315,250.76 N/A $0.00 N/A
Primary Transmission Line $17,688.00 $15,010.37 $0.00
Flexible Foam Transmission Line - dielectric, 7/8" $17,688.00 $15,010.37 Please see Quote JEHQ1698 for justification of costs. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $64,890.00 $66,190.00 N/A $0.00 N/A
Total for all systems $289,957.50 $315,250.76 N/A $0.00 N/A
Primary Tower TOWER $64,890.00 $66,190.00 $0.00
Study needed for guyed or free-standing tower $8,700.00 $10,000.00 Please see the justifying proposals from Stainless- FDH Infrastructure Services. P19_3686-003,P19_3686-004, and P19_3686-005 N/A N/A
Tower Rigging Short Tower (less than 500') $56,190.00 $56,190.00 N/A N/A N/A
Minor tower reinforcement/modifications $0.00 $0.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $38,819.50 $53,932.50 N/A $0.00 N/A
Total for all systems $289,957.50 $315,250.76 N/A $0.00 N/A
Outside Professional Services $38,819.50 $53,932.50 $0.00
Perform engineering study for displacement application $1,800.00 $1,800.00 N/A N/A N/A
Prepare/ Review 399 reimbursement form $1,710.00 $1,710.00 N/A N/A N/A
Project management of the transition $26,797.00 $41,910.00 Please see KYCW strategic support quote for justification of costs. N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Prepare Form 601 $755.00 $755.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $13,765.00 $13,765.00 N/A $0.00 N/A
Total for all systems $289,957.50 $315,250.76 N/A $0.00 N/A
Other Expenses $13,765.00 $13,765.00 $0.00
New Point to Point Microwave System: Unlicensed $2,250.00 $2,250.00 N/A N/A N/A
Equipment Delivery and Handling Charges $0.00 $0.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $5,110.00 $5,110.00 Please see Sunbelt Proposal for the justification of costs. N/A N/A
FCC Filing Fees - Form 2100 Major change CP application $4,960.00 $4,960.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $289,957.50 $315,250.76 $0.00

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel.
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard

Assistant Secretary


11/14/2019

Attachments

Back to Top