Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
FLOOD COMMMUNICATIONS OF OMAHA, LLC |
Michael Flood 214 NORTH 7TH STREET SUITE 1 NORFOLK, NE 68702 United States |
+1 (402) 371-0100 | mike@newschannelnebraska.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Matthew H McCormick , Esq . Fletcher, Heald & Hildreth, PLC |
1300 N 17th Street Suite 1100 Arlington, VA 22209 United States |
+1 (703) 812-0400 | mccormick@fhhlaw.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Please see Transition Plan and Reimbursement Narrative |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Hitachi |
Model | EC703HP | |
Year | 2016 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3.5 kW |
Section | Question | Response |
---|---|---|
New Mask Filter | Does the transmitter require a new mask filter? | Yes |
Mask Filter Type | Full Service | |
Power | 2.1-3kW | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Purchase and installation of surge protector | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Temporary Transmitter |
Costs and services associated with installation, usage, and removal of temporary transmitter during station retuning |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | SWLP12OI/14 | |
Year | 2016 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCH412M-29 | |
Year | 2018 | |
Justification for New Antenna | Old Antenna tuned to DTV Channel 14 and incompatible with post-transition DTV Channel 29. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1052723 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 28' 21.0" N- |
Longitude (NAD83) | 096° 25' 21.0" W- | |
Overall Structure Height | 499.01 feet | |
Support Structure Height | 496.71 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1086.93 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Cable One, Inc. | |
Date Constructed | 01/01/1988 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Other Legal Services |
Legal fees for advising station regarding displacement and transition to new channel |
TV-IT Network Consulting Services |
Network redesign, equipment configuration, installation support, transmission delegation to remote cable headends, various troubleshooting and problem resolution due to changes. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $20,306.81 | $26,223.61 | N/A | $0.00 | N/A |
Total for all systems | $126,627.57 | $69,580.12 | N/A | $0.00 | N/A |
Primary Transmitter EC703HP | $20,306.81 | $26,223.61 | $0.00 | ||
2.1-3kW w mask filter Full Service | $6,200.00 | $3,000.00 | N/A | N/A | N/A |
Temporary Transmitter | $1,531.71 | $1,531.71 | N/A | $0.00 | N/A |
Retune - UHF and VHF - minor re-channel issues | $11,000.00 | $20,116.80 | Retuning existing transmitter more technically complex than initially expected | $0.00 | N/A |
Other Electrical Service: Purchase and installation of surge protector | $1,575.10 | $1,575.10 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
2.1-3kW w mask filter Full Service | Information not provided. |
Temporary Transmitter | |
Retune - UHF and VHF - minor re-channel issues | |
Other Electrical Service: Purchase and installation of surge protector |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $15,203.26 | $15,203.26 | N/A | $0.00 | N/A |
Total for all systems | $126,627.57 | $69,580.12 | N/A | $0.00 | N/A |
Primary Antenna ATC-BCH412M-29 | $15,203.26 | $15,203.26 | $0.00 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $15,203.26 | $15,203.26 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $7,439.50 | N/A | $0.00 | N/A |
Total for all systems | $126,627.57 | $69,580.12 | N/A | $0.00 | N/A |
Primary Tower TOWER | $56,190.00 | $7,439.50 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $7,439.50 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,482.50 | $20,543.75 | N/A | $0.00 | N/A |
Total for all systems | $126,627.57 | $69,580.12 | N/A | $0.00 | N/A |
Outside Professional Services | $33,482.50 | $20,543.75 | $0.00 | ||
TV-IT Network Consulting Services | $5,415.00 | $5,415.00 | N/A | $0.00 | N/A |
RF Exposure Measurements | $12,100.00 | $2,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $568.75 | N/A | $0.00 | N/A |
Form 399 assistance or other Program Management costs | $3,700.00 | $3,700.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $725.00 | N/A | $0.00 | N/A |
Other Legal Services | $1,000.00 | $1,000.00 | N/A | $0.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,932.50 | Engineering studies more complex than initially expected | $0.00 | d |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $650.00 | N/A | $0.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $3,000.00 | Form more complex and time consuming than initially expected | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
TV-IT Network Consulting Services | |
RF Exposure Measurements | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Form 399 assistance or other Program Management costs | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Other Legal Services | |
Perform engineering study for displacement application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,445.00 | $170.00 | N/A | $0.00 | N/A |
Total for all systems | $126,627.57 | $69,580.12 | N/A | $0.00 | N/A |
Other Expenses | $1,445.00 | $170.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | N/A | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $126,627.57 | $69,580.12 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael J Flood Member 11/14/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael J Flood Member 11/14/2019 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael J Flood Member 11/14/2019 |