Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
COX TELEVISION TULSA, LLC Doing Business As: COX TELEVISION TULSA, LLC |
Chief Engineer 2625 SOUTH MEMORIAL DRIVE TULSA, OK 74129 United States |
+1 (918) 491-0023 | darin.hall@coxinc.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Darin Hall Chief Engineer Cox Television Tulsa, LLC |
Chief Engineer 2625 South Memorial Drive Tulsa, OK 74129 United States |
+1 (918) 491-0023 | darin.hall@coxinc.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | KMYT will construct interim facilities on nearby tower. KMYT will move to the interim tower on its current channel. KMYT's new equipment will be installed after serious tower modifications at existing site. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3200 | |
Year | 2002 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 42 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-80 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 50 kW | |
Justification for New Transmitter | Current IOT Transmitter cannot be retuned per manufacturer and solid state transmitter is less than a comparable IOT transmitter. 08/18/2018 Transmitter size was increased See attachment: TP Required to Compensate Ant AGL Reduction rev2.pdf |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Required new 208vac Transformer, Switch and Panel with Breakers | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Indoor RF Equipment |
New mask filter, reject loads, main load and switch control equipment |
Transmitter Disposal |
Removal and environmental disposal of existing transmitter coolant and High Voltage Beam Supply oil. |
Spare Parts Kit |
Current Spare parts kit is not compatible with new transmitter. |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-72 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 47.2 kW | |
Justification for New Transmitter | Interim transmitter needed for continued viewer service during the repack process. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 250.0 feet | |
Other Electrical Service | Yes | |
Description | 208vAC Transformer, Switch and Panel with Breakers for Pumps, Loads, Generator, lighting and UPS. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1200.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Name | Description |
---|---|
Transmitter Control |
Required Transmitter control, Rack, UPS and remote monitoring system |
STL Signal Link |
STL/TSL microwave equipment, dish, line and rigging installation costs |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 900.0 kW | |
Manufacturer | ||
Model | ATW30H5-HSOL-41H | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 770.0 kW | |
Manufacturer | ||
Model | TFU-29JSC-R-04 | |
Year | 2018 | |
Justification for New Antenna | Current antenna cannot be retuned on new Repacked channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | ||
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 3 | |
Lower Limit | 521.00 MHz | |
Upper Limit | 641.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-24WB-R | |
Year | 2018 | |
Justification for New Antenna | Broadband panel antenna required to approximate the current viewer coverage without exceeding licensed contour. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | S | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Interim Tower Rigging |
Rigging and installation costs for Interim Antenna and Line. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1285 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1285 feet per run | |
Justification for New Transmission Line | Current line will not technically operate within specs at channel 34 per manufacturer. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | 19 ½ ' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1720 feet per run | |
Justification for New Transmission Line | Rigid Coaxial Transmission line for Interim Antenna located at the Interim site. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1048931 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 01' 36.0" N- |
Longitude (NAD83) | 095° 40' 45.0" W- | |
Overall Structure Height | 1268.03 feet | |
Support Structure Height | 1200.12 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 709.97 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | IWG Towers Assets II, LLC | |
Date Constructed | 03/28/2003 |
Facility ID | Call Sign | Service |
---|---|---|
11910 | KOKI-TV | DTV |
Users |
---|
Action Radio Co |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Additional Tower Engineering |
Additional tower studies and modifications engineering. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 160 | |
Explanation | Manage and coordinate delivery of all equipment at both the Interim Site as well as the Main Site. Confirm all contractors arrival and schedule. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Interim Facility Engineering |
Service Fees for engineering, mechanical and utilities design and management. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Interim Tower and Ground Lease |
Interim Tower and Ground Lease will be required by Interim Tower Owner for 5 years minimum. |
Interim Tower Mapping and Studies |
Tower Mapping and Studies will be needed to be performed on Interim Tower and grounds to determine loading. |
Interim Tower Modifications |
Modifications will needed on Interim Tower to bring to TIA/ANSI Rev. G standard. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,470,697.25 | $3,919,279.42 | N/A | $3,743,294.76 | N/A |
Total for all systems | $8,168,987.89 | $7,582,252.89 | N/A | $5,778,824.28 | N/A |
Interim Transmitter ULXTE-72 | $2,702,173.89 | $2,254,738.75 | $2,121,250.81 | ||
Other -- Building Addition Size: 1200.0 | $458,149.23 | $458,149.23 | Building constructed at Interim Site. No existing facility available at site. This build includes floor, walls, roof, and ice protection. Outdoor concrete pads for heat exchangers with ice protection. *Earlier price provided on 399 was just an estimate | $456,360.92 | Earlier price provided on 399 was just an estimate and after bid process and full installation the cost was increased. |
STL Signal Link | $222,634.64 | $222,634.64 | STL/TSL Signal from Studio. Dish, Line, Radios for both ends. Includes Rigging and path alignment. Frequency path analysis and line sweeps. | $151,752.53 | N/A |
UHF inside RF system including switching | $147,500.00 | $106,939.86 | Indoor RF equipment and control including dummy load, switch, mask filter and control equipment. | $106,939.86 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Other -- HVAC Service Type: C Size:20 (Other) | $37,600.00 | $37,600.00 | 2-10 ton Cooling only HVAC units for interim site. | $23,660.00 | N/A |
Other Electrical Service: 208vAC Transformer, Switch and Panel with Breakers for Pumps, Loads, Generator, lighting and UPS. | $272,140.02 | $272,140.02 | 208vac transformer and TVSS from Gates Air. Interim transmitter panel and breakers. Generator and ATS switch for building including installation. | $251,780.50 | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $13,000.00 | $12,250.00 | N/A | $6,625.00 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | $9,875.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $15,562.00 | Earlier price provided on 399 was just an estimate and after bid process and full installation the cost was increased. | $15,562.00 | Earlier price provided on 399 was just an estimate and after bid process and full installation the cost was increased. |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $29,832.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,068,863.00 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. | $1,068,863.00 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Transmitter Control | $0.00 | $0.00 | N/A | N/A | N/A |
Primary Transmitter ULXTE-80 | $1,768,523.36 | $1,664,540.67 | $1,622,043.95 | ||
Spare Parts Kit | $13,931.27 | $13,931.27 | Current Parts kit is not compatible with new transmitter. New kit replaces existing parts kit of PA module, power supply, control boards. | $13,931.27 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Transmitter Disposal | $1,788.00 | $1,788.00 | Environmental disposal of existing Sigma coolant and Beam supply oil. 10 Drums/550 gallons. | N/A | N/A |
Indoor RF Equipment | $144,685.80 | $144,685.80 | Inside RF System including Mask Filter, dummy load system and control from Gates Air. | $120,342.08 | N/A |
Other Electrical Service: Required new 208vac Transformer, Switch and Panel with Breakers | $52,818.29 | $52,818.29 | 208VAC Transformer and Surge Suppressor from Gates Air, installation and 208VAC panel board and breakers including associated wiring. Early estimate was low and after final quotes the cost had increased. | $52,818.29 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $4,900.00 | N/A | $4,900.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $19,935.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,402,017.31 | Main transmitter required for operation, Gates Air quote minus the spare parts kit, Indoor RF, and Electrical.Cost increased after the estimate was provided and tower antenna/line was finalized. | $1,402,017.31 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
10 Ton system | $38,900.00 | $8,100.00 | N/A | $8,100.00 | N/A |
Actual Information Description | File Name |
---|---|
Other -- Building Addition Size: 1200.0 | |
STL Signal Link | |
UHF inside RF system including switching | |
Other -- HVAC Service Type: C Size:20 (Other) | |
Other Electrical Service: 208vAC Transformer, Switch and Panel with Breakers for Pumps, Loads, Generator, lighting and UPS. | |
3" Rigid Conduit and Wiring (Cost per foot) | |
Transformer 3 phase/480v - 150 KVA | |
Service entrance 3 phase/800 amp/208 volt | |
Switchgear - industrial 800 amp | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Transmitter Control | Information not provided. |
Spare Parts Kit | |
Transmitter Disposal | Information not provided. |
Indoor RF Equipment | |
Other Electrical Service: Required new 208vac Transformer, Switch and Panel with Breakers | |
3" Rigid Conduit and Wiring (Cost per foot) | |
Switchgear - industrial 800 amp | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
10 Ton system |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $644,118.43 | $639,338.43 | N/A | $451,394.68 | N/A |
Total for all systems | $8,168,987.89 | $7,582,252.89 | N/A | $5,778,824.28 | N/A |
Interim Antenna TFU-24WB-R | $410,178.43 | $407,838.43 | $269,268.43 | ||
Interim Tower Rigging | $200,000.00 | $200,000.00 | Interim Site rigging, installation of antenna and line using Widelity Estimate for Tower Rigging. | $85,242.00 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $2,700.00 | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 1000 horizontally polarized | $27,333.43 | $27,333.43 | Duplicate entry created from 399 system. Was Recommended by Reimburse Viewer to add this explanation and put no cost in the estimate. | $27,333.43 | Previous Antenna Line was superseded, thus this new antenna line. Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $0.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $11,700.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $18,588.00 | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 1000 horizontally polarized | $135,405.00 | $135,405.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Interim Panel Antenna required to approximate the current viewer coverage without exceeding licensed contour. Vendor Change | $135,405.00 | N/A |
Primary Antenna TFU-29JSC-R-04 | $233,940.00 | $231,500.00 | $182,126.25 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $2,700.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $19,575.00 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,900.00 | $13,200.00 | N/A | $9,268.20 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $2,340.55 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 770 kW input, horizontally polarized | $184,900.00 | $184,900.00 | Main Antenna replacement, current antenna cannot be retuned. Price includes shipping. Vendor Change | $148,242.50 | N/A |
Actual Information Description | File Name |
---|---|
Interim Tower Rigging | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 1000 horizontally polarized | |
Sweep test of existing antenna | Information not provided. |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 1000 horizontally polarized | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power, Side Mount, basic slot antenna, 770 kW input, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $720,090.00 | $708,291.63 | N/A | $529,913.05 | N/A |
Total for all systems | $8,168,987.89 | $7,582,252.89 | N/A | $5,778,824.28 | N/A |
Interim Transmission Line | $347,440.00 | $324,945.63 | $324,945.63 | ||
Rigid Transmission Line - copper, 6 1/8" | $347,440.00 | $324,945.63 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. | $324,945.63 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Primary Transmission Line | $372,650.00 | $383,346.00 | $204,967.42 | ||
Rigid Transmission Line - copper, 7 3/16" | $372,650.00 | $383,346.00 | Cost includes all hangars, line, pressure windows and required dehydrator. Line design and site evaluation included in cost. | $204,967.42 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 7 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,319,324.00 | $1,255,524.00 | N/A | $659,031.00 | N/A |
Total for all systems | $8,168,987.89 | $7,582,252.89 | N/A | $5,778,824.28 | N/A |
Primary Tower TOWER | $1,319,324.00 | $1,255,524.00 | $659,031.00 | ||
Serious tower reinforcement/modifications | $1,052,000.00 | $1,000,000.00 | Serious Tower Modification are required to bring tower to current standards. | $467,833.00 | N/A |
Additional Tower Engineering | $30,524.00 | $30,524.00 | Additional tower engineering due to serious tower modifications and studies. | $26,220.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $19,740.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $145,238.00 | N/A |
Actual Information Description | File Name |
---|---|
Serious tower reinforcement/modifications | |
Additional Tower Engineering | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $214,304.40 | $258,660.60 | N/A | $127,271.00 | N/A |
Total for all systems | $8,168,987.89 | $7,582,252.89 | N/A | $5,778,824.28 | N/A |
Outside Professional Services | $214,304.40 | $258,660.60 | $127,271.00 | ||
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $9,029.80 | Earlier price provided on 399 was just an estimate and after actual cost was increased. | $9,029.80 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
Interim Facility Engineering | $48,854.40 | $48,854.40 | Interim Facility building engineering, mechanical, A/E, and utilities. Civil design and stamped drawing package. | $48,854.40 | Earlier price provided on 399 was just an estimate and after bid process and full installation the cost was increased. |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $1,411.90 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $8,000.00 | This is for both the Main Tower Site as well as the Interim Site. | $6,998.50 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $7,556.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. | $7,556.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
Prepare request for Special Temporary Authorization | $2,050.00 | $4,950.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. | $4,950.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,700.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $33,814.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. Cost was also higher due to Interim Site. | $33,814.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. Cost was also higher due to Interim Site. |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $11,956.40 | Earlier price provided on 399 was just an estimate and after actual cost was increased. | $11,956.40 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
Project management of the transition | $25,280.00 | $24,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Interim Facility Engineering | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Project management of the transition | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $800,453.81 | $801,158.81 | N/A | $267,919.79 | N/A |
Total for all systems | $8,168,987.89 | $7,582,252.89 | N/A | $5,778,824.28 | N/A |
Other Expenses | $800,453.81 | $801,158.81 | $267,919.79 | ||
Interim Tower and Ground Lease | $541,531.85 | $541,531.85 | Interim site tower and ground lease for $8,500.00 month for minimum 5 years. Negotiated from 10 year to 5 year. | $93,500.00 | Earlier price provided on 399 was just an estimate and after Legal process and full installation the cost was increased. |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | General Public information and channel change campaign including cost of production. | $392.50 | N/A |
Interim Tower Modifications | $150,000.00 | $150,000.00 | Tower Modifications to bring Interim tower to latest standard before interim antenna and line may be installed. Widelity Estimate for Minor Tower Modifications used. | $81,992.00 | N/A |
Interim Tower Mapping and Studies | $39,088.00 | $39,088.00 | Interim Tower Mapping, Structural and engineering studies required by tower owner. *Earlier price provided on 399 was just an estimate and after full installation the cost was increased. | $39,088.00 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. |
MVPD Notification of Channel Change | $2,500.00 | $2,500.00 | Certified letter services and notification for FCC Repack channel change. | $549.50 | N/A |
Equipment Storage | $9,983.56 | $9,983.56 | Container purchase and delivery for Main and Interim site requiring storage of equipment during construction and tower modifications. | $7,385.89 | N/A |
Equipment Delivery and Handling Charges | $38,770.40 | $38,770.40 | Large equipment rental to unload deliveries. Main and Interim Site will be needed. Prior cost was just an estimate. This will continue to increase until project is completed due to tower crew and manufacturer delays. | $38,770.40 | Earlier price provided on 399 was just an estimate and after installation the cost was increased due to lead times with manufacturers and tower crew delays. |
Disposal Costs (for equipment and other waste, net of any salvage value) | $4,000.00 | $4,000.00 | Cost of antenna and line removal from property for environmental disposal. | N/A | N/A |
Local Zoning | $0.00 | $0.00 | Interim Building Permit and Zoning Permits for Wagoner County, Oklahoma | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $380.00 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. | $380.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $1,405.00 | Earlier price provided on 399 was just an estimate and after full installation the cost was increased. | $1,405.00 | Earlier price provided on 399 was just an estimate and after actual cost was increased. |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $4,456.50 | N/A |
Actual Information Description | File Name |
---|---|
Interim Tower and Ground Lease | |
Develop and air announcement of upcoming channel change | |
Interim Tower Modifications | |
Interim Tower Mapping and Studies | |
MVPD Notification of Channel Change | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $8,168,987.89 | $7,582,252.89 | $5,778,824.28 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Darin Hall Chief Engineer 10/15/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Darin Hall Chief Engineer 10/15/2019 |