FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
12520
Service:
DTV
Call Sign:
WGMB-TV
Channel:
24 (UHF)
File Number:
0000028525
FRN:
0009961889
Date Submitted:
09/19/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

NEXSTAR BROADCASTING, INC.

Elizabeth Ryder

545 E. JOHN CARPENTER FREEWAY

SUITE 700

IRVING, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Broadcasting, Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace transmitter, antenna, and transmission line. Acquire interim antenna system during construction and duration of the assigned phase. Map and analyze tower; design and implement modifications if required. See attached.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model QXD1
Year 2007
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 31 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9evo-20
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 25.5 kW
Justification for New Transmitter The manufacturer of the existing IOT transmitter advises that the transmitter cannot be re-tuned to the assigned channel. Upgrade to a SS at one power step up from the required TPO. See attached quotes.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model ATW-30H5-HSC4L-44H
Year 2007

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 665.0 kW
Manufacturer
Model TFU30JSC/VP-R C200
Year 2019
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-24WB
Year 2019
Justification for New Antenna An interim antenna is necessary to keep station on the air during primary antenna replacement and for the duration of the assigned phase. Station will attempt to rent if renting is available at time of acquisition.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Waveguide
Diameter N/A
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 1485 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1485 feet per run
Justification for New Transmission Line The existing waveguide section lengths cannot accommodate the assigned channel.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 19 ¾ '
Other Segment Length
Number of parallel runs 1
Length 1350 feet per run
Justification for New Transmission Line An interim transmission line is necessary for the interim antenna to keep station on the air during primary antenna replacement and for the duration of the assigned phase. Station will attempt to rent if renting is available at time of acquisition.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex?
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1022810
Coordinates (NAD83) Latitude (NAD83) 30° 19' 34.6" N-
Longitude (NAD83) 091° 16' 36.1" W-
Overall Structure Height 1736.86 feet
Support Structure Height 1676.82 feet
Ground Elevation Above Mean Sea Level (AMSL) 12.14 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Pinnacle Towers LLC
Date Constructed 01/01/1986

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
47402 WYNK-FM FM
70021 WVLA-TV DTV
24975 KZUP-CD DTV
24976 WBRL-CD DTV
4053 WFMF FM

Other Types of Users

Users
7 mwave license
2 RPU licenses

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Other
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Crane Expenses

Tower and Foundation Modifications also require a crane, crane rigging and crane permits.

Labor

Tower and Foundation Modifications Labor

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1000
Explanation Schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. Internal accounting and Project management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 20
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Sales Tax

Sales and use tax on goods and services

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,015,950.00 $716,492.00 N/A $162,360.50 N/A
Total for all systems $5,012,004.28 $4,607,134.20 N/A $2,486,969.92 N/A
Primary Transmitter THU9evo-20 $1,015,950.00 $716,492.00 $162,360.50
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $649,442.00 See R&S quote 229279.0 $162,360.50 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,900.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $37,150.00 N/A N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $5,000.00 N/A N/A N/A

Components

Actual Information Description File Name
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
Transmitter, installment #1
Amount:
$162,360.50
Transformer 3 phase/480v - 150 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $427,355.00 $422,775.00 N/A $328,441.50 N/A
Total for all systems $5,012,004.28 $4,607,134.20 N/A $2,486,969.92 N/A
Interim Antenna TFU-24WB $197,890.00 $196,620.00 $135,405.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,120.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,500.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $12,000.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,550.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, horizontally polarized $150,450.00 $150,450.00 See Dielectric quote 700435CMZ-2. $135,405.00 N/A
Primary Antenna TFU30JSC/VP-R C200 $229,465.00 $226,155.00 $193,036.50
Sweep test of existing antenna $6,730.00 $6,550.00 N/A N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,120.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 665 kW input, directional,, elliptically or circularly polarized $182,025.00 $182,025.00 See attached Dielectric quote DMS157-2. Total cost $205,275 less vpol ($23,250) $163,822.50 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $21,750.00 See attached Dielectric quote DMS157-2 $19,575.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $10,710.00 See Dielectric quote DMS157-2. $9,639.00 N/A

Components

Actual Information Description File Name
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, horizontally polarized

Component Description:
Interim antenna, installment #1, line 1 of invoice
Amount:
$67,702.50

Component Description:
Interim antenna, installment #2, line 1 of invoice
Amount:
$67,702.50
Sweep test of existing antenna Information not provided.
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 665 kW input, directional,, elliptically or circularly polarized

Component Description:
Antenna, installment #2, line 1 of invoice
Amount:
$81,911.25

Component Description:
Antenna, installment #1, line 1 of invoice
Amount:
$81,911.25
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Side mount brackets, installment #1, line 2 of invoice
Amount:
$9,787.50

Component Description:
Side mount brackets, installment #2, line 2 of invoice
Amount:
$9,787.50
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Elbow complex, installment #1, line 3 of invoice
Amount:
$4,819.50

Component Description:
Elbow complex, installment #2, line 3 of invoice
Amount:
$4,819.50

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $572,670.00 $399,571.20 N/A $359,614.08 N/A
Total for all systems $5,012,004.28 $4,607,134.20 N/A $2,486,969.92 N/A
Interim Transmission Line $272,700.00 $193,880.40 $174,492.36
Rigid Transmission Line - copper, 6 1/8" $272,700.00 $193,880.40 See Dielectric quote 700435CMZ-2. $174,492.36 N/A
Primary Transmission Line $299,970.00 $205,690.80 $185,121.72
Rigid Transmission Line - copper, 6 1/8" $299,970.00 $205,690.80 See Dielectric quote DMS157-2. $185,121.72 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Transmission line, installment #1, lines 2 & 6 of invoice
Amount:
$87,246.18

Component Description:
Transmission line, installment #2, lines 2 and 6 of invoice
Amount:
$87,246.18
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Transmission line, installment #2, lines 4 and 8 of invoice
Amount:
$92,560.86

Component Description:
Transmission line, installment #1, lines 4 & 8 of invoice
Amount:
$92,560.86

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,338,849.28 $2,416,911.00 N/A $1,603,648.80 N/A
Total for all systems $5,012,004.28 $4,607,134.20 N/A $2,486,969.92 N/A
Primary Tower TOWER $2,338,849.28 $2,416,911.00 $1,603,648.80
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,600.00 N/A $18,200.00 N/A
Labor $752,573.50 $752,573.50 See attached Crown Castle quote ("WGMB Tower & Foundation Mod Quote") $602,058.79 N/A
Crane Expenses $86,975.78 $86,975.78 See attached Crown Castle quote ("WGMB Tower & Foundation Mod Quote") $69,580.63 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,142,261.72 See attached Crown Castle quote ("WGMB Tower & Foundation Mod Quote") $913,809.38 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $409,500.00 See attached Crown Castle quote ("WGMB Antenna & Line Installation Quote") N/A N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Geotechnical report
Amount:
$8,250.00

Component Description:
Modification Design
Amount:
$9,950.00
Labor

Component Description:
Tower modifications, 30% installment
Amount:
$225,772.04

Component Description:
Tower Mod Construction, 50% down payment
Amount:
$376,286.75
Crane Expenses

Component Description:
Tower Mod Construction, 50% down payment
Amount:
$43,487.89

Component Description:
Crane expenses, 30% installment
Amount:
$26,092.74
Serious tower reinforcement/modifications

Component Description:
Tower Mod Construction, 50% down payment
Amount:
$571,130.86

Component Description:
Tower modifications, 30% installment
Amount:
$342,678.52
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $305,130.00 $299,635.00 N/A $32,905.04 N/A
Total for all systems $5,012,004.28 $4,607,134.20 N/A $2,486,969.92 N/A
Outside Professional Services $305,130.00 $299,635.00 $32,905.04
Additional Field Engineering Service, 20 Days $108,000.00 $108,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,050.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,050.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,585.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,095.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,305.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,120.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,535.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,535.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,070.00 N/A $3,000.00 N/A
Project management of the transition $158,000.00 $154,000.00 N/A $20,405.04 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,560.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,170.00 N/A $7,000.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,560.00 N/A $2,500.00 N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 20 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Vendor has issued a revised invoice.
Amount:
($3,000.00)

Component Description:
KGA Subcontractor invoice line 3
Amount:
$3,000.00

Component Description:
Prepare engineering sections of FCC Form 2100, item 4 from invoice summary
Amount:
$3,000.00
Project management of the transition

Component Description:
Project management services 7.1.17 through 9.29.17
Amount:
$2,824.66

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates.
Amount:
$450.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from January 1, 2018 through January 26, 2018.
Amount:
$900.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$2,125.00

Component Description:
Project management services
Amount:
$2,876.00

Component Description:
Project management services April 2019
Amount:
$78.00

Component Description:
Project management services January 2019
Amount:
$65.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$225.00

Component Description:
Project management services February 2019
Amount:
$214.50

Component Description:
Project management services March 2019
Amount:
$71.50

Component Description:
Project management services 6.1.19 through 6.28.19
Amount:
$675.00

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$900.00

Component Description:
Project management services 2.24.18 to 3.30.18
Amount:
$675.00

Component Description:
Prepare FCC Schedule 387, item 5 from invoice summary
Amount:
$150.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$225.00

Component Description:
Project management services 5/26/18 through 6/29/18.
Amount:
$600.00

Component Description:
Project management services 1.1.19 through 1.31.19
Amount:
$600.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$150.00

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$1,975.00

Component Description:
Vendor has issued a revised invoice.
Amount:
($675.00)

Component Description:
Vendor has issued a revised invoice.
Amount:
($150.00)

Component Description:
Vendor has issued a revised invoice.
Amount:
($1,000.00)

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from May 27, 2017 through June 30, 2017.
Amount:
$1,000.00

Component Description:
Project management services 6/30/18 through 7/27/18
Amount:
$1,050.00

Component Description:
Project management services, item 1 from invoice summary
Amount:
$1,817.88

Component Description:
Various project management services, item 6 from invoice summary
Amount:
$820.00

Component Description:
Project management prepare schedule 387 progress report
Amount:
$150.00

Component Description:
Project management services Aug 2018
Amount:
$75.00

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$150.00

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from October 27, 2017 through December 31, 2017.
Amount:
$1,387.50
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
KGA subcontractor invoice line 2
Amount:
$7,000.00

Component Description:
Vendor has issued a revised invoice.
Amount:
($7,000.00)

Component Description:
Perform engineering study for new channel assignment, item 3 from invoice summary
Amount:
$7,000.00
Prepare and or review reimbursement form

Component Description:
KGA subcontractor invoice line 1
Amount:
$2,500.00

Component Description:
Prepare reimbursement form, item 2 from invoice summary
Amount:
$2,500.00

Component Description:
Vendor has issued a revised invoice.
Amount:
($2,500.00)

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $352,050.00 $351,750.00 N/A $0.00 N/A
Total for all systems $5,012,004.28 $4,607,134.20 N/A $2,486,969.92 N/A
Other Expenses $352,050.00 $351,750.00 $0.00
Sales Tax $235,000.00 $235,000.00 Estimated using the LA state rate of 10% tax applied to transmitters, antennas, line and towers. N/A N/A
DTV Medical Facility Notification $11,550.00 $11,250.00 N/A N/A N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A N/A N/A
Equipment Storage $25,000.00 $25,000.00 N/A N/A N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $3,500.00 $3,500.00 Cost to develop and produce spots and crawls for viewer notification N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,012,004.28 $4,607,134.20 $2,486,969.92

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


09/19/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


09/19/2019