FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
74173
Service:
DTV
Call Sign:
WVTM-TV
Channel:
7 (High VHF)
File Number:
0000026837
FRN:
0023890601
Date Submitted:
05/28/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WVTM Hearst Television Inc.

Doing Business As: WVTM Hearst Television Inc.

150 Fayetteville Street

Suite 1700

Raleigh, NC 27601

United States

+1 (919) 838-0300 mprak@brookspierce.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan see attached document

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use backup to main transmitter
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Platinum PTCD1OP1-i
Year 2008
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 4 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-6R37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 4.8 kW
Justification for New Transmitter Per original transmitter manufacturer, existing transmitter cannot be converted to post transition channel. See attached GatesAir EOL and HTV transmitter statements.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 3 inches
Length 250.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Electrical Accessories

manufacturer required surge protection

Transmitter de-install

remove current transmitter to make room for repack transmitter

Shipping

transmitter shipping

Additional RF components

Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote.

Sales Tax

transmitter sales tax

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Platinum PTCD1OP1-i
Year 2008
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 4 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-6R37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 4.8 kW
Justification for New Transmitter Per original transmitter manufacturer, existing transmitter cannot be converted to post transition channel. See attached GatesAir EOL and HTV transmitter statements.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 300.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Shipping

transmitter shipping

Electrical Accessories

Manufacturer required surge protection

Additional RF components

Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote.

Sales Tax

transmitter sales tax

Transmitter de-install

remove current transmitter to make room for repack transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 20.0 kW
Manufacturer
Model THV-9A13/VP-R-04
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 20.0 kW
Manufacturer
Model THV-7A7/VP-R 04
Year 2019
Justification for New Antenna Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 3 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional RF components

line size and impedance matching, & custom line section required for installation

Sales Tax

antenna sales tax

Shipping

antenna shipping

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 1
Number of Panels/Bays 8
Lower Limit 174.00 MHz
Upper Limit 213.00 MHz
Design power capacity in use 35.0 %
Other Antenna Type N/A
ERP: 20.0 kW
Manufacturer
Model TLS-V8BB
Year 2019
Justification for New Antenna WVTM does not own an auxiliary antenna. Therefore, an interim antenna is required to facilitate move to post-transition channel.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Sales Tax

antenna sales tax

Shipping

antenna shipping

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1180 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 4 1/16 inches
Segment Length 20'
Other Segment Length
Number of parallel runs 1
Length 1010 feet per run
Justification for New Transmission Line transmission line required to support interim antenna

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sales Tax

sales tax

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1036003
Coordinates (NAD83) Latitude (NAD83) 33° 29' 26.0" N-
Longitude (NAD83) 086° 47' 48.0" W-
Overall Structure Height 1075.12 feet
Support Structure Height 965.21 feet
Ground Elevation Above Mean Sea Level (AMSL) 973.74 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner WVTM Hearst Television Inc.
Date Constructed 04/24/1982


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Consulting

Consulting for tower analysis and modification

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Number of Hours N/A
Explanation N/A
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Non-Catalog legal expenses

Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues

Transmitter Site Survey

Transmitter planning survey & transmitter building drawings

Consulting-Project Management

Project consulting and project management

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $365,730.01 $364,680.01 N/A $240,203.63 N/A
Total for all systems $1,816,285.01 $1,720,650.01 N/A $629,965.27 N/A
Primary Transmitter VAXTE-6R37 $199,912.70 $199,612.70 $127,085.31
Transmitter de-install $7,242.84 $7,242.84 transmitter de-install per updated GatesAir quote N/A N/A
Sales Tax $17,370.00 $17,370.00 transmitter sales tax per attached GatesAir quote N/A N/A
Electrical Accessories $1,942.49 $1,942.49 manufacturer required surge protection N/A N/A
Shipping $4,500.00 $4,500.00 transmitter shipping N/A N/A
2" Rigid Conduit and Wiring (Cost per foot) $7,800.00 $7,500.00 N/A N/A N/A
High VHF - Air Cooled Solid State Transmitter 4.8 kW $130,245.05 $130,245.05 updated GatesAir quote sections A, B & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. $127,085.31 N/A
Additional RF components $30,812.32 $30,812.32 updated Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote. N/A N/A
Auxiliary Transmitter VAXTE-6R37 $165,817.31 $165,067.31 $113,118.32
Transmitter de-install $7,242.84 $7,242.84 transmitter de-install per updated GatesAir quote N/A N/A
Sales Tax $14,786.00 $14,786.00 transmitter sales tax per attached GatesAir quote N/A N/A
Additional RF components $6,594.44 $6,594.44 updated Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote. N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $13,000.00 $12,250.00 N/A N/A N/A
Electrical Accessories $1,942.49 $1,942.49 manufacturer required surge protection N/A N/A
Shipping $4,500.00 $4,500.00 shipping per GatesAir quote N/A N/A
High VHF - Air Cooled Solid State Transmitter 4.8 kW $117,751.54 $117,751.54 updated GatesAir quote sections A, B & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. $113,118.32 N/A

Components

Actual Information Description File Name
Transmitter de-install Information not provided.
Sales Tax Information not provided.
Electrical Accessories Information not provided.
Shipping Information not provided.
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
High VHF - Air Cooled Solid State Transmitter 4.8 kW

Component Description:
WVTM main transmitter prior to ship
Amount:
$21,578.69

Component Description:
Main transmitter 2nd deposit
Amount:
$88,062.62

Component Description:
Main transmitter 1st deposit
Amount:
$17,444.00
Additional RF components Information not provided.
Transmitter de-install Information not provided.
Sales Tax Information not provided.
Additional RF components Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Electrical Accessories Information not provided.
Shipping Information not provided.
High VHF - Air Cooled Solid State Transmitter 4.8 kW

Component Description:
WVTM auxiliary transmitter prior to ship
Amount:
$10,206.49

Component Description:
Aux transmitter 1st deposit
Amount:
$14,849.21

Component Description:
Aux transmitter 2nd deposit
Amount:
$88,062.62

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $460,175.00 $435,789.00 N/A $217,359.90 N/A
Total for all systems $1,816,285.01 $1,720,650.01 N/A $629,965.27 N/A
Interim Antenna TLS-V8BB $109,675.00 $86,195.00 $71,457.30
High VHF - High Power Side Mount One Station horizontally polarized $72,997.00 $72,997.00 antenna cost per attached Dielectric quote $71,457.30 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $0.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $0.00 N/A $0.00 N/A
Sales Tax $6,798.00 $6,798.00 estimated antenna sales tax based on Alabama state and local sales tax rate of 10% N/A N/A
Shipping $0.00 $0.00 antenna shipping per attached Dielectric quote $0.00 N/A
Primary Antenna THV-7A7/VP-R 04 $350,500.00 $349,594.00 $145,902.60
Shipping $7,608.00 $7,608.00 N/A $0.00 N/A
Sales Tax $29,134.00 $29,134.00 estimated antenna sales tax based on Alabama state and local sales tax rate of 10% N/A N/A
Additional RF components $10,200.00 $10,200.00 additional RF components required for antenna installation $0.00 N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $7,024.00 N/A $0.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $0.00 N/A
High VHF - High Power Top Mount One Station elliptically or circularly polarized $289,228.00 $289,228.00 antenna price for comparable replacement antenna per attached Dielectric quote $145,902.60 N/A

Components

Actual Information Description File Name
High VHF - High Power Side Mount One Station horizontally polarized

Component Description:
WVTM Dielectric Interim Antenna payments 1&2 - 45%; $35,728.65
Amount:
$35,728.65

Component Description:
WVTM auxiliary antenna payment 2
Amount:
$35,728.65
Sweep test of existing antenna Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Sales Tax Information not provided.
Shipping Information not provided.
Shipping Information not provided.
Sales Tax Information not provided.
Additional RF components Information not provided.
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
High VHF - High Power Top Mount One Station elliptically or circularly polarized

Component Description:
WVTM Dielectric Main Antenna payments 1&2 - 45%: $145,902.60
Amount:
$145,902.60

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $154,320.00 $119,896.00 N/A $98,096.40 N/A
Total for all systems $1,816,285.01 $1,720,650.01 N/A $629,965.27 N/A
Interim Transmission Line $154,320.00 $119,896.00 $98,096.40
Sales Tax $10,900.00 $10,900.00 estimated transmission line sales tax based on Alabama state and local sales tax rate of 10% N/A N/A
Rigid Transmission Line - copper, 4 1/16" $143,420.00 $108,996.00 N/A $98,096.40 N/A
Primary Transmission Line $0.00 $0.00 $0.00

Components

Actual Information Description File Name
Sales Tax Information not provided.
Rigid Transmission Line - copper, 4 1/16"

Component Description:
WVTM Dielectric Interim transmission line payments 1&2 - 45%; $49,048.20
Amount:
$49,048.20

Component Description:
WVTM auxiliary transmission line payment 2
Amount:
$49,048.20

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $660,800.00 $629,850.00 N/A $39,750.00 N/A
Total for all systems $1,816,285.01 $1,720,650.01 N/A $629,965.27 N/A
Primary Tower GTOWER $660,800.00 $629,850.00 $39,750.00
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A $12,000.00 N/A
Tower Consulting $3,000.00 $3,000.00 estimated consulting fees $900.00 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $26,850.00 additional tower studies to confirm level of tower modifications needed $26,850.00 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Major tower reinforcement/modifications

Component Description:
WVTM preliminary tower reinforcement analysis
Amount:
$1,500.00

Component Description:
WVTM tower reinforcement analysis and design
Amount:
$10,500.00
Tower Consulting

Component Description:
WVTM tower consulting Sept-Oct 2018
Amount:
$100.00

Component Description:
WVTM tower consulting Dec 2018
Amount:
$200.00

Component Description:
WVTM tower consulting May 2018
Amount:
$200.00

Component Description:
WVTM tower consulting January 2019
Amount:
$400.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
WVTM tower rigorous analysis 2
Amount:
$3,500.00

Component Description:
WVTM Tower Engineering Evaluation invoice 2
Amount:
$3,875.00

Component Description:
WVTM tower structural analysis peer review
Amount:
$6,900.00

Component Description:
WVTM tower engineering evaluation 1
Amount:
$3,875.00

Component Description:
WVTM tower rigorous analysis 1
Amount:
$3,500.00

Component Description:
WVTM Tower Mapping
Amount:
$5,200.00
Tall Tower (greater than 500') Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $126,570.00 $123,350.00 N/A $34,555.34 N/A
Total for all systems $1,816,285.01 $1,720,650.01 N/A $629,965.27 N/A
Outside Professional Services $126,570.00 $123,350.00 $34,555.34
Consulting-Project Management $30,000.00 $30,000.00 estimate $1,862.14 N/A
Transmitter Site Survey $20,600.00 $20,600.00 Transmitter planning survey & transmitter building drawings per attached quote $20,600.00 N/A
Non-Catalog legal expenses $20,000.00 $20,000.00 Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues $5,810.21 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,819.02 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $1,425.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $1,750.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $1,288.97 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Consulting-Project Management

Component Description:
WVTM Kube 1
Amount:
$1,862.14
Transmitter Site Survey

Component Description:
WVTM GatesAir transmitter site survey. PO attached to invoice. Supporting quote in Attachments.
Amount:
$20,600.00
Non-Catalog legal expenses

Component Description:
WVTM non-catalog legal 2
Amount:
$3,690.01

Component Description:
WVTM non-catalog legal 1
Amount:
$2,120.20
RF Exposure Measurements Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
WVTM Prepare and File FCC Form 2100, Construction Permit Application
Amount:
$764.50

Component Description:
WVTM Prepare and File FCC Form 2100, Construction Permit Application 2
Amount:
$1,054.52
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
WVTM CP engineering section
Amount:
$1,425.00
Perform engineering study for new channel assignment and antenna development

Component Description:
WVTM CP engineering study 2
Amount:
$950.00

Component Description:
WVTM CP engineering study 1
Amount:
$800.00
Prepare and or review reimbursement form

Component Description:
WVTM Prepare and/or review reimbursement Form 399 2
Amount:
$300.07

Component Description:
WVTM Prepare and/or review reimbursement Form 399
Amount:
$988.90
Address transition timing and coordination issues w/ other stations and wireless Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $48,690.00 $47,085.00 N/A $0.00 N/A
Total for all systems $1,816,285.01 $1,720,650.01 N/A $629,965.27 N/A
Other Expenses $48,690.00 $47,085.00 $0.00
MVPD Notification of Channel Change $2,500.00 $2,500.00 Attorney assistance in coordinating MVPD notification N/A N/A
Develop and air announcement of upcoming channel change $2,500.00 $2,500.00 Attorney review to ensure FCC compliance N/A N/A
Equipment Storage $30,500.00 $30,500.00 Estimate for 1 year of antenna storage. See attached Dielectric document. N/A N/A
DTV Medical Facility Notification $11,550.00 $10,000.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,816,285.01 $1,720,650.01 $629,965.27

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John Drain

Hearst Television SVP Chief Financial Officer


05/28/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Douglas Durkee

Hearst Television Manager of Spectrum Repack


05/28/2019