Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NEXSTAR BROADCASTING, INC. |
Elizabeth Ryder 545 E. JOHN CARPENTER FREEWAY SUITE 700 IRVING, TX 75062 United States |
+1 (972) 373-8800 | eryder@nexstar.tv | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Elizabeth Ryder General Counsel Nexstar Broadcasting, Inc. |
Elizabeth Ryder 545 E. John Carpenter Freeway Suite 700 Irving, TX 75062 United States |
+1 (972) 373-8800 | eryder@nexstar.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace transmitter, antenna and line. Use existing antenna and line through assigned phase as "interim" while the top-mount is built-out. Map and analyze tower; design and implement modifications if required. See attached |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | QXD2 | |
Year | 2007 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 60 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9EVO-48 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 106 kW | |
Justification for New Transmitter | The manufacturer of the existing IOT transmitter advises that the transmitter cannot be re-tuned to the assigned channel. A new solid state transmitter is proposed because a new MSDC IOT does not have enough capacity. See attachment; |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 500 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 300.0 feet | |
Other Electrical Service | Yes | |
Description | See attached building addition quote with electrical costs from Hope Contractors of Shreveport, Inc. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 900.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Additional Line |
Additional transmission line required from new building addition to base of tower |
Additional Interior RF System |
Interior RF System Existing Transmitter to Interim Transmission line |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-32DSB-R O3 | |
Year | 2007 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 927.0 kW | |
Manufacturer | ||
Model | TFU-29JTH/VP-R O6 | |
Year | 2018 | |
Justification for New Antenna | The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel. Moving from side to top mount. Use existing as Interim which justifies side-to-top upgrade. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Bury Mounting Adapter |
BURY MOUNTING ADAPTER 12FT BELOW TOWER TOP. 15.8 FT ABOVE TOWER TOP. ALLOWS TOP MOUNT ANTENNA TO UTILIZE TOWER TOP BURY CONFIGURATION. |
Feed Through Complex |
FEED THROUGH COMPLEX, INCLUDES REQUIRED ELBOWS AND CUT SECTIONS TO ROUTE ANTENNA INPUT ALONG SUPPORT POLE INTO TOWER. |
Wedding Cake Mounting Adapter |
WEDDING CAKE MOUNTING ADAPTER 3FT |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1500 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1570 feet per run | |
Justification for New Transmission Line | Moving from side to top mount. Will use existing antenna and line as Interim which justifies the upgrade costs since a new interim antenna and interim transmission line will not be required. |
Name | Description |
---|---|
Additional Line |
Additional transmission line required from new building addition to base of tower. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | ||
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1025912 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 54' 11.0" N- |
Longitude (NAD83) | 094° 00' 21.0" W- | |
Overall Structure Height | 1558.05 feet | |
Support Structure Height | 1479.97 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 295.93 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Nexstar Broadcasting, Inc. | |
Date Constructed | 05/19/1961 |
Facility ID | Call Sign | Service |
---|---|---|
33728 | KTAL-FM | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Other |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Lower Existing Side-Mount Antenna |
Existing antenna must be moved to protect tower workers from RFR exposure while installing the new top-mount post-auction antenna |
Weather and Downtime Delays |
Weather and Downtime Delays |
Ice Bridge |
A new building addition is required which necessitates an ice bridge from the new building addition to the base of the tower |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 750 | |
Explanation | Schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. Internal accounting and Project management. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 17 | |
Justification | It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | Yes |
Is Remediation needed? | Yes | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Sales Taxes |
Sales and use tax on goods and services |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,173,080.00 | $1,932,370.00 | N/A | $1,813,620.00 | N/A |
Total for all systems | $5,920,760.00 | $4,125,785.00 | N/A | $3,301,471.41 | N/A |
Primary Transmitter THU9EVO-48 | $3,173,080.00 | $1,932,370.00 | $1,813,620.00 | ||
Additional Interior RF System | $140,000.00 | $140,000.00 | N/A | $140,000.00 | N/A |
Additional Line | $25,000.00 | $25,000.00 | Additional transmission line required from new building addition to base of tower. | N/A | N/A |
Other -- Building Addition Size: 900.0 | $206,480.00 | $206,480.00 | Insufficient space in existing building for new RF system. New building addition is required. Total costs for new building addition is $170400 which includes electrical. See attached Building Addition Quote and change orders(Hope Contractors of Shreve) | $206,480.00 | N/A |
Other -- HVAC Service Type: C Size:20 (Other) | $55,000.00 | $55,000.00 | Insufficient space in existing building for new RF system. HVAC required for new building addition. See attached Building Addition HVAC Quote (Central Air Heating and Aire Conditioning, Inc.). | $45,200.00 | N/A |
Other Electrical Service: See attached building addition quote with electrical costs from Hope Contractors of Shreveport, Inc. | $0.00 | $0.00 | Electrical costs associated with the new building addition are included in the building addition quote. See attached Building Addition Quote (Hope Contractors of Shreveport, Inc.). | N/A | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $15,600.00 | $15,000.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 500 KVA | $48,400.00 | $47,100.00 | N/A | $28,500.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | $2,630,000.00 | $1,393,440.00 | See Rohde & Schwarz quote 119242.1. Note upgrade to THU9EVO-48 system cost is not included in estimated cost and KTAL will not seek reimbursement for the upgrade cost. | $1,393,440.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,050.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional Interior RF System | |
Additional Line | Information not provided. |
Other -- Building Addition Size: 900.0 | |
Other -- HVAC Service Type: C Size:20 (Other) | |
Other Electrical Service: See attached building addition quote with electrical costs from Hope Contractors of Shreveport, Inc. | Information not provided. |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 500 KVA | |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $426,730.00 | $340,180.00 | N/A | $306,802.00 | N/A |
Total for all systems | $5,920,760.00 | $4,125,785.00 | N/A | $3,301,471.41 | N/A |
Primary Antenna TFU-29JTH/VP-R O6 | $426,730.00 | $340,180.00 | $306,802.00 | ||
Wedding Cake Mounting Adapter | $18,330.00 | $18,330.00 | See Dielectric quote DMS119-5 attached. | $16,497.00 | N/A |
Feed Through Complex | $13,650.00 | $13,650.00 | See Dielectric quote DMS119-5 attached. | $12,285.00 | N/A |
Bury Mounting Adapter | $86,220.00 | $86,220.00 | See Dielectric quote DMS119-5 attached. | $77,598.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $9,150.00 | Reduced down from 11,700. See Dielectric quote DMS119-5 attached. | $8,235.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $206,430.00 | See Dielectric quote DMS119-5 attached, 236,655 cost less VPOL upgrade (30,225) | $185,787.00 | N/A |
Actual Information Description | File Name |
---|---|
Wedding Cake Mounting Adapter | |
Feed Through Complex | |
Bury Mounting Adapter | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $480,300.00 | $300,427.00 | N/A | $247,884.30 | N/A |
Total for all systems | $5,920,760.00 | $4,125,785.00 | N/A | $3,301,471.41 | N/A |
Primary Transmission Line | $480,300.00 | $300,427.00 | $247,884.30 | ||
Rigid Transmission Line - copper, 7 3/16" | $455,300.00 | $275,427.00 | See Dielectric quote DMS119-5 attached. | $247,884.30 | N/A |
Additional Line | $25,000.00 | $25,000.00 | Additional transmission line required from new building addition to base of tower. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 7 3/16" | |
Additional Line | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,132,000.00 | $846,000.00 | N/A | $741,300.00 | N/A |
Total for all systems | $5,920,760.00 | $4,125,785.00 | N/A | $3,301,471.41 | N/A |
Primary Tower TOWER | $1,132,000.00 | $846,000.00 | $741,300.00 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $347,500.00 | Rigging, relocate FM antenna from tower rigging face, remove existing top-mount antenna, install new top-mount antenna & associated components, relocate FM antenna back to licensed height & face, remove side-mount antenna, de-rig, plumb & tension tower. | $290,250.00 | N/A |
Ice Bridge | $40,500.00 | $40,500.00 | See PCI Proposal 19304-6 and addendum | $40,500.00 | N/A |
Weather and Downtime Delays | $46,000.00 | $46,000.00 | Based on Precision Communications quote; weather delays $700 per man per day; downtime delays $1200 per man per day | $0.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,600.00 | N/A | $24,150.00 | N/A |
Lower Existing Side-Mount Antenna | $177,200.00 | $177,200.00 | Existing side-mount antenna must be lowered in order to protect tower workers from RFR exposure while installing the new top-mount post-auction antenna. | $177,200.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $209,200.00 | $193,450 (PCI) + $15,750 (MorrisonHershfield) | $209,200.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Ice Bridge | |
Weather and Downtime Delays | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Lower Existing Side-Mount Antenna | |
Major tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $187,420.00 | $186,680.00 | N/A | $35,758.80 | N/A |
Total for all systems | $5,920,760.00 | $4,125,785.00 | N/A | $3,301,471.41 | N/A |
Outside Professional Services | $187,420.00 | $186,680.00 | $35,758.80 | ||
Project management of the transition | $118,500.00 | $115,500.00 | N/A | $30,583.80 | N/A |
Additional Field Engineering Service, 17 Days | $34,000.00 | $34,000.00 | N/A | N/A | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,585.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,305.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,120.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $5,175.00 | STAs required to operate at a lower height and on second interim antenna (due to burn up) | $5,175.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,535.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,070.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,560.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,560.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,170.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Additional Field Engineering Service, 17 Days | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $521,230.00 | $520,128.00 | N/A | $156,106.31 | N/A |
Total for all systems | $5,920,760.00 | $4,125,785.00 | N/A | $3,301,471.41 | N/A |
Other Expenses | $521,230.00 | $520,128.00 | $156,106.31 | ||
Equipment Delivery and Handling Charges | $25,000.00 | $25,000.00 | N/A | $12,076.33 | N/A |
Sales Taxes | $373,600.00 | $373,600.00 | Sales and use tax for goods and services based on LA state rates. | $125,089.18 | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Equipment Storage | $25,000.00 | $25,000.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $25,000.00 | $25,000.00 | N/A | $16,000.00 | N/A |
Non-zoning permits | $25,000.00 | $25,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $195.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $333.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,250.00 | N/A | $2,940.80 | N/A |
AM Pattern Disturbance -- Remedy | $21,050.00 | $20,500.00 | N/A | N/A | N/A |
AM Pattern Disturbance -- Impact study | $7,890.00 | $7,680.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
Sales Taxes | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification | |
AM Pattern Disturbance -- Remedy | Information not provided. |
AM Pattern Disturbance -- Impact study | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $5,920,760.00 | $4,125,785.00 | $3,301,471.41 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Elizabeth Ryder General Counsel 06/13/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Elizabeth Ryder General Counsel 06/13/2019 |