Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
BOARD OF GOVERNORS OF MISSOURI STATE UNIVERSITY Doing Business As: BOARD OF GOVERNORS OF MISSOURI STATE UNIVERSITY |
Tammy Wiley 901 S. NATIONAL AVE. SPRINGFIELD, MO 65897 United States |
+1 (417) 836-5878 | TAMMYWILEY@MISSOURISTATE.EDU | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Matthew Anderson Sanderford , Jr. . President Marsand, Inc. 211 Pack Saddle Trail Weatherford, TX 76088-8646 |
Matthew Sanderford 211 Pack Saddle Trail Weatherford, TX 76088 United States |
+1 (817) 783-5566 | engineering@marsand.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | See attached station transition plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DHD20P1 | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-10 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 6.6 kW | |
Justification for New Transmitter | Existing transmitter manufacturer will not support retuning to new channel and current transmitter does not have sufficient output power. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 0.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 55.0 kW | |
Manufacturer | ||
Model | B16UOM | |
Year | 1984 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 16 | |
Lower Limit | 500.00 MHz | |
Upper Limit | 626.00 MHz | |
Design power capacity in use | 59.0 % | |
Other Antenna Type | N/A | |
ERP: | 68.0 kW | |
Manufacturer | ||
Model | RD-16RFS(OM)-500626-SL | |
Year | 2017 | |
Justification for New Antenna | Existing CH25 antenna will not support CH35. Broadband replacement allows reuse of existing aperture and main transmission line run with no structural modification. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 3 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1012933 | |
Coordinates (NAD83) | Latitude (NAD83) | 37° 04' 34.9" N- |
Longitude (NAD83) | 094° 32' 16.4" W- | |
Overall Structure Height | 981.94 feet | |
Support Structure Height | 980.96 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1042.97 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SpectraSite Communications, LLC. through American Towers, LLC. | |
Date Constructed | 01/01/1965 |
Facility ID | Call Sign | Service |
---|---|---|
18283 | KODE-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Antenna Change Out |
Cost for removing old antenna and install new antenna |
Tower Permit Drawing Package |
Tower owner required generation of a construction drawing package |
Ground and Building AE Permit Drawing Package |
Tower owner required generation of a construction drawing package |
Structural Engineering Tower Load Study |
Tower owner required Rigorous Structural analysis |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 100 | |
Explanation | The station has multiple transmitter sites (2 TV) and operates with minimal staff. It does not have personnel available for any of these tasks, nor is the staff trained to provide any of these services. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Survey |
Site visit for specifying the final equipment needs and installation planning. |
Tower Owner Project Managment |
Tower owner required project management. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Required bid advertising |
State of Missouri statutes require advertising for projects/equipment with a value of $100,000 or greater. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $710,879.35 | $377,323.88 | N/A | $238,744.87 | N/A |
Total for all systems | $2,274,006.51 | $1,196,320.34 | N/A | $884,035.60 | N/A |
Primary Transmitter ULXTE-10 | $710,879.35 | $377,323.88 | $238,744.87 | ||
UHF - Liquid Cooled Solid State Transmitter 6.6 kW | $176,968.35 | $176,968.35 | Cost is reflective of actual expenses incurred. See cost component for detailed memo and supporting documentation. | $176,968.35 | N/A |
Other -- Building Addition Size: 0.0 | $13,865.00 | $13,865.00 | Access Door required to allow personnel access between the transmitter room and the new transmitter heat exchanger located outside. Costs exceeded original estimates. See attached documentation for actual costs. | $13,865.00 | N/A |
Other -- HVAC Service Type: H Size:5 (Other) | $25,546.00 | $25,546.00 | Current HVAC requires too much space to locate new transmitter’s outdoor heat exchanger. This space is limited. HVAC to be replaced with smaller outdoor unit to allow sufficient area for transmitter exchanger. Actual costs exceeded original estimates. | $25,546.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $160,944.53 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Final quote not received. Maximum estimate used in its place. | $22,365.52 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Liquid Cooled Solid State Transmitter 6.6 kW | |
Other -- Building Addition Size: 0.0 | |
Other -- HVAC Service Type: H Size:5 (Other) | |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $80,587.16 | $77,802.46 | N/A | $66,402.46 | N/A |
Total for all systems | $2,274,006.51 | $1,196,320.34 | N/A | $884,035.60 | N/A |
Primary Antenna RD-16RFS(OM)-500626-SL | $80,587.16 | $77,802.46 | $66,402.46 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) | $9,340.00 | $7,145.30 | As final needs were developed on antenna related components, there was some cost variance from initial 399 estimates which relied on FCC catalog pricing. | $7,145.30 | As final needs were developed, we saw some cost variance from original estimates for needed components. |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 68 kW input, horizontally polarized | $59,257.16 | $59,257.16 | As final antenna needs were developed, there was some cost variance from initial 399 estimates which relied on FCC catalog pricing. | $59,257.16 | As final antenna needs were developed, there was some cost variance from initial 399 estimates which relied on FCC catalog pricing. |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) | |
Sweep test of existing antenna | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 68 kW input, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,393,650.00 | $633,964.00 | N/A | $540,314.00 | N/A |
Total for all systems | $2,274,006.51 | $1,196,320.34 | N/A | $884,035.60 | N/A |
Primary Tower GTOWER | $1,393,650.00 | $633,964.00 | $540,314.00 | ||
Serious tower reinforcement/modifications | $1,052,000.00 | $512,769.00 | Estimated cost has been adjusted to reflect the actual charges incurred when implementing the tower modifications. | $512,769.00 | N/A |
Ground and Building AE Permit Drawing Package | $4,700.00 | $4,700.00 | Cost estimate provided by tower owner. | $750.00 | N/A |
Structural Engineering Tower Load Study | $10,450.00 | $10,450.00 | Cost to KOZJ increased due to the fact that the other tenant on the tower (KODE) decided it will vacate to another tower site. | $10,450.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $16,345.00 | Cost to KOZJ increased due to the fact the other tenant on the tower KODE decided it will vacate to another tower site. | $16,345.00 | N/A |
Antenna Change Out | $85,000.00 | $85,000.00 | Quote attached from PCI | N/A | N/A |
Tower Permit Drawing Package | $4,700.00 | $4,700.00 | Cost estimate provided by tower owner. | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $0.00 | Tower Rigging cost is include in the tower owner's estimate reinforcement / modifications. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Serious tower reinforcement/modifications | |
Ground and Building AE Permit Drawing Package | |
Structural Engineering Tower Load Study | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Antenna Change Out | Information not provided. |
Tower Permit Drawing Package | Information not provided. |
Tall Tower (greater than 500') | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $61,840.00 | $80,730.00 | N/A | $33,275.52 | N/A |
Total for all systems | $2,274,006.51 | $1,196,320.34 | N/A | $884,035.60 | N/A |
Outside Professional Services | $61,840.00 | $80,730.00 | $33,275.52 | ||
Site Survey | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $1,005.50 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $1,339.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $6,161.27 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $580.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $25,000.00 | After consultation with legal counsel, the station is estimating lease negotiation costs of $25,000 for amending the current site lease with ATC and for negotiating a Master Agreement with ATC relating to the overall tower changes necessary for the station’s repack. | $3,871.00 | N/A |
Project management of the transition | $15,800.00 | $15,000.00 | N/A | $8,588.25 | N/A |
Tower Owner Project Managment | $9,480.00 | $9,480.00 | Cost provided by tower owner | $9,480.00 | N/A |
Actual Information Description | File Name |
---|---|
Site Survey | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare and or review reimbursement form | |
Perform engineering study for new channel assignment and antenna development | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Project management of the transition | |
Tower Owner Project Managment |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $27,050.00 | $26,500.00 | N/A | $5,298.75 | N/A |
Total for all systems | $2,274,006.51 | $1,196,320.34 | N/A | $884,035.60 | N/A |
Other Expenses | $27,050.00 | $26,500.00 | $5,298.75 | ||
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $2,520.25 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $1,000.00 | $1,000.00 | Spot creation, talent, production. | N/A | N/A |
MVPD Notification of Channel Change | $11,000.00 | $11,000.00 | Send notification to cable companies, MVPD locations, follow up on signal reception after repack switch. | $1,430.55 | N/A |
Required bid advertising | $1,500.00 | $1,500.00 | State of Missouri statutes require advertising for projects/equipment with a value of $100,000 or greater. | $1,347.95 | N/A |
Actual Information Description | File Name |
---|---|
DTV Medical Facility Notification | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
MVPD Notification of Channel Change | |
Required bid advertising |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,274,006.51 | $1,196,320.34 | $884,035.60 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Baker James , Dr. . VP, Missouri State University 05/06/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | James Baker , Dr. . VP, Missouri State University 05/06/2019 |