(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
36912
Service:
DTV
Call Sign:
WSAZ-TV
Channel:
22 (UHF)
File Number:
0000028915
FRN:
0018223693
Date Submitted:
10/23/2018

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

GRAY TELEVISION LICENSEE, LLC

Doing Business As: GRAY TELEVISION LICENSEE, LLC

Robert Folliard

4370 Peachtree Road

Atlanta, GA 30319

United States

+1 (202) 750-1585 Robert.Folliard@gray.tv Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

Widelity, inc.

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan WSAZ will be replacing its main transmission line, antenna, and transmitter, its aux antenna. The station will be installing a broadband main antenna and broadband interim antenna to be shared with WQCW. The station will also be installing an interim XMTR

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DCX-Millenium
Year 2003
Type Inductive Output Tube
IOT Power Type Three
Power Capacity 60 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-90
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 56.4 kW
Justification for New Transmitter Existing transmitter cannot be retuned

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 500 kVA
Rigid Conduit and Wiring Yes
Size 4 inches
Length 200.0 feet
Other Electrical Service Yes
Description The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

BGS

Burk Transmitter Remote WSAZ

Basic Site Survey

Basic site survey by GatesAir for planning transmitter(s) installation

Pad for Heat Exchangers

Pad for Heat Exchangers behind new Building

Ice Bridge Building Interconnect

Ice Bridge for interconnection between buildings

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model ULXTE-30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter Interim transmitter needed to broadcast during the transition

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractor.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? No

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Tower to interim building ice bridge

Tower to interim building ice bridge

Building Renovation

Renovate OLD building to install Interim facility

Waveguide Switch for Interim

UHF Inside RF System including switching

Site Prep

Site prep for Construction

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Backup Antenna
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 724.0 kW
Manufacturer
Model TFU-20DSC-R 04
Year 2002

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Backup Antenna
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 2
Lower Limit 476.00 MHz
Upper Limit 530.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 530.0 kW
Manufacturer
Model TFU-24WB C160
Year 2017
Justification for New Antenna Needed for interim operations

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 476.0 MHz - 530.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Ice Shield

Ice Shield over Coax into old Building for interim

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 595.0 kW
Manufacturer
Model ATW28H3-ETO-23H Trasar
Year 2010

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 64
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 2000.0 kW
Manufacturer
Model UHF 16B4P-elli-omni-90kw
Year 2018
Justification for New Antenna Main antenna cannot be retuned, combining with WQCW

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 470.0 MHz - 698.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 8 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 970 feet per run

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Backup and Interim
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 960 feet per run
Justification for New Transmission Line Needed for interim broadcasting

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sweep Existing Transmission Line

Sweep of existing transmission line to determine viability on new channel(s)

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1022 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1022 feet per run
Justification for New Transmission Line The current line will not support the combined RF power for two full power transmitters.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1035121
Coordinates (NAD83) Latitude (NAD83) 38° 30' 36.3" N-
Longitude (NAD83) 082° 13' 09.5" W-
Overall Structure Height 1029.84 feet
Support Structure Height 966.20 feet
Ground Elevation Above Mean Sea Level (AMSL) 1011.14 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner Gray Television Group, Inc.
Date Constructed 10/27/2014


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Mapping

Mapping of existing tower.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 900
Explanation Strategic Support
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Tree Removal

Removal of Trees for Tagline Rigging

Security

Security for Site 60 Days

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,902,482.55 $2,377,029.41 N/A $1,172,169.39 N/A
Total for all systems $5,665,482.18 $4,313,759.28 N/A $1,475,978.44 N/A
Interim Transmitter ULXTE-30 $875,989.55 $719,213.09 $361,881.52
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $562,623.54 N/A $361,881.52 N/A
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractor. $2,000.00 $2,000.00 N/A N/A N/A
15 Ton system $88,400.00 $53,000.00 N/A N/A N/A
Building Renovation $34,072.00 $34,072.00 N/A N/A N/A
Waveguide Switch for Interim $50,000.00 $50,000.00 N/A N/A N/A
Site Prep $10,600.00 $10,600.00 N/A N/A N/A
Tower to interim building ice bridge $6,917.55 $6,917.55 See attached Steel Products and Manufacturing quote #003 for Ice Bridge between tower and analog transmitter building. N/A N/A
Primary Transmitter ULXTE-90 $2,026,493.00 $1,657,816.32 $810,287.87
Ice Bridge Building Interconnect $11,500.00 $11,500.00 This is half the cost, other half paid by WQCW. Revised quote uploaded. N/A N/A
Pad for Heat Exchangers $66,555.00 $66,555.00 See Maynard C. Smith Construction Co. Revised Quote WSAZ-SOG101rev3. This is half the cost, other half paid by WQCW N/A N/A
Basic Site Survey $9,000.00 $9,000.00 See vendor invoice $8,538.60 N/A
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW $1,788,000.00 $1,422,723.32 Quote GA-00023867 $798,105.27 N/A
Transformer 3 phase/480v - 500 KVA $48,400.00 $46,000.00 N/A N/A N/A
4" Rigid Conduit and Wiring (Cost per foot) $20,200.00 $19,200.00 N/A N/A N/A
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. $80,000.00 $80,000.00 Whitt-Meadows quote $3,644.00 N/A
BGS $2,838.00 $2,838.00 See attached BGS quote N/A N/A

Components

Actual Information Description File Name
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
Interim Transmitter -UKLTE-30 Transmitter - 70%
Amount:
$361,881.52
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractor. Information not provided.
15 Ton system Information not provided.
Building Renovation Information not provided.
Waveguide Switch for Interim Information not provided.
Site Prep Information not provided.
Tower to interim building ice bridge Information not provided.
Ice Bridge Building Interconnect Information not provided.
Pad for Heat Exchangers Information not provided.
Basic Site Survey

Component Description:
Field Engineering Fees
Amount:
$8,538.60
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW

Component Description:
New 1st Primary Transmitter
Amount:
$798,105.27
Transformer 3 phase/480v - 500 KVA Information not provided.
4" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.

Component Description:
Professional services
Amount:
$3,644.00
BGS Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,098,255.63 $652,394.72 N/A $165,515.47 N/A
Total for all systems $5,665,482.18 $4,313,759.28 N/A $1,475,978.44 N/A
Primary Antenna UHF 16B4P-elli-omni-90kw $877,880.00 $427,200.00 $67,477.20
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized $768,000.00 $365,000.00 WSAZ's half of the cost $66,517.20 N/A
Sweep test of existing antenna $6,730.00 $3,200.00 N/A $960.00 N/A
New combiner, cost per channel (without antenna) $84,200.00 $50,000.00 WSAZ's half of the cost N/A N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $9,000.00 WSAZ's half of the cost N/A N/A
Auxiliary Antenna TFU-24WB C160 $220,375.63 $225,194.72 $98,038.27
Ice Shield $16,960.00 $16,960.00 WSAZ's half of the cost N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $11,000.00 WSAZ's half of the cost N/A N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $6,500.00 WSAZ's half of the cost N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $111,899.09 WSAZ's half of the cost per quote Q-76353r1 $78,329.36 N/A
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 530 horizontally polarized $52,944.94 $52,944.94 quote JEHQ1438 $18,908.91 N/A
Sweep test of existing antenna $6,730.00 $3,200.00 WSAZ's half of the cost $800.00 N/A
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 530 horizontally polarized $22,690.69 $22,690.69 ***System Notice: Estimate adjusted and locked because line has been superseded.***WSAZ's half of the cost $0.00 N/A

Components

Actual Information Description File Name
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized

Component Description:
New primary antenna UHF High Power Top Mount (200-1000kW)
Amount:
$66,517.20
Sweep test of existing antenna

Component Description:
Sweep Test
Amount:
$960.00
New combiner, cost per channel (without antenna) Information not provided.
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) Information not provided.
Ice Shield Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
New combiner, cost per channel (without antenna)

Component Description:
Interim Channel Combiner
Amount:
$78,329.36
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 530 horizontally polarized

Component Description:
UHF - Broadband Panel, Side Mount Aux/Interim Antenna
Amount:
$18,908.91
Sweep test of existing antenna

Component Description:
Sweep test New Auxiliary Antenna
Amount:
$960.00

Component Description:
WSAZ-Sweep Test New Auxiliary Antenna
Amount:
$800.00
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 530 horizontally polarized

Component Description:
New Auxiliary Antenna
Amount:
$22,690.69

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $633,498.00 $302,749.00 N/A $70,232.68 N/A
Total for all systems $5,665,482.18 $4,313,759.28 N/A $1,475,978.44 N/A
Primary Transmission Line $407,778.00 $193,669.00 $44,950.93
Rigid Transmission Line - copper, 8 3/16" broadband $407,778.00 $193,669.00 WSAZ's half of the cost $44,950.93 N/A
Auxiliary Transmission Line $225,720.00 $109,080.00 $25,281.75
Rigid Transmission Line - copper, 6 1/8" broadband $222,720.00 $106,080.00 WSAZ's half of the cost $22,638.15 N/A
Sweep Existing Transmission Line $3,000.00 $3,000.00 See vendor invoice $2,643.60 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 8 3/16" broadband

Component Description:
New Primary Transmission Line
Amount:
$44,950.93
Rigid Transmission Line - copper, 6 1/8" broadband

Component Description:
New Auxiliary Transmission Line
Amount:
$22,638.15
Sweep Existing Transmission Line

Component Description:
Sweep test of transmission line and antenna
Amount:
$2,643.60

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $661,060.00 $629,680.00 N/A $11,610.00 N/A
Total for all systems $5,665,482.18 $4,313,759.28 N/A $1,475,978.44 N/A
Primary Tower GTOWER $661,060.00 $629,680.00 $11,610.00
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $0.00 N/A
Tower Mapping $16,960.00 $16,960.00 N/A $7,610.00 N/A
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A N/A N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,720.00 Includes state and local taxes $4,000.00 N/A

Components

Actual Information Description File Name
Tall Tower (greater than 500')

Component Description:
Install antennas and lines on Existing Primary Tower
Amount:
$41,056.25
Tower Mapping

Component Description:
Tower Mapping
Amount:
$7,610.00
Major tower reinforcement/modifications Information not provided.
Structural engineering tower load study for well documented tower

Component Description:
Engineering Evaluation, Level 1 Corrosion Risk Analysis
Amount:
$4,000.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $185,015.00 $175,250.00 N/A $44,101.90 N/A
Total for all systems $5,665,482.18 $4,313,759.28 N/A $1,475,978.44 N/A
Outside Professional Services $185,015.00 $175,250.00 $44,101.90
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $196.50 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $1,862.50 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $2,424.50 N/A
Project management of the transition $142,200.00 $135,000.00 N/A $39,618.40 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Complete and file initial repack CP application.
Amount:
$196.50
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
support response to review of reimbursement form 399 provide summaries of additional antenna
Amount:
$375.00

Component Description:
RF Consulting Fees
Amount:
$1,487.50
Perform engineering study for new channel assignment and antenna development

Component Description:
Review proposed antenna specifications from additional vendor, discuss vendor and prompt recalculation of gain required TPO.
Amount:
$125.00

Component Description:
Perform engineering study for new channel assignment
Amount:
$812.50

Component Description:
Consulting Engineer
Amount:
$425.00

Component Description:
Engineering Study for New Channel Assignment
Amount:
$1,062.00
Project management of the transition

Component Description:
Project management
Amount:
$2,231.90

Component Description:
Project Management
Amount:
$2,270.10

Component Description:
Project Mgt
Amount:
$839.75

Component Description:
Project Management
Amount:
$4,329.75

Component Description:
Project Management
Amount:
$3,016.15

Component Description:
Project Mgt
Amount:
$1,326.45

Component Description:
Project Management
Amount:
$2,452.40

Component Description:
Project Management
Amount:
$2,265.25

Component Description:
Project Management
Amount:
$1,930.60

Component Description:
Project Mgt
Amount:
$733.30

Component Description:
Project Mgt
Amount:
$2,942.30

Component Description:
Transition Related Project Management Costs
Amount:
$1,500.00

Component Description:
Project management
Amount:
$1,328.55

Component Description:
Project Management
Amount:
$2,285.40

Component Description:
Project Mgt
Amount:
$28.20

Component Description:
Project management
Amount:
$2,675.15

Component Description:
Project Management
Amount:
$1,968.10

Component Description:
Project Mgt
Amount:
$3,488.80

Component Description:
Project Management
Amount:
$2,006.25
Prepare and or review reimbursement form Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $185,171.00 $176,656.15 N/A $12,349.00 N/A
Total for all systems $5,665,482.18 $4,313,759.28 N/A $1,475,978.44 N/A
Other Expenses $185,171.00 $176,656.15 $12,349.00
Security $9,000.00 $9,000.00 Cost shared between stations N/A N/A
Tree Removal $12,349.00 $12,349.00 N/A $12,349.00 N/A
MVPD Notification of Channel Change $1,272.00 $1,272.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $10,000.00 $10,000.00 N/A N/A N/A
Equipment Storage $21,400.00 $21,400.00 Storage Rates Central Van and Storage quote N/A N/A
Equipment Delivery and Handling Charges $21,200.00 $21,200.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $86,210.00 $86,210.00 Maynard C. Smith Construction Co., Inc. quote WSAZ Demo Safety Klean Disposal Quote N/A N/A
Non-zoning permits $11,660.00 $11,660.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $3,050.15 N/A N/A N/A

Components

Actual Information Description File Name
Security Information not provided.
Tree Removal

Component Description:
Trees cut X3 - pin oak - left side of tower
Amount:
$4,452.00

Component Description:
Clear cut NE corner
Amount:
$1,908.00

Component Description:
Tree removal - SE corner
Amount:
$689.00

Component Description:
Barker Ridge - clear cut back side of Tower site
Amount:
$5,300.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,665,482.18 $4,313,759.28 $1,475,978.44

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard

Assistant Secretary


10/23/2018

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard

Assistant Secretary


10/23/2018