Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
PUBLIC BROADCASTING OF NORTHWEST PENNSYLVANIA, INC. Doing Business As: PUBLIC BROADCASTING OF NORTHWEST PENNSYLVANIA, INC. |
Aaron Coseo 8425 PEACH ST ERIE, PA 16509 United States |
+1 (814) 864-3001 | acoseo@wqln.org | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Aaron Coseo Director of Broadcast Operations Public Broadcasting of Northwest Pennsylvania Inc. |
Aaron Coseo 8425 Peach St. Erie, PA 16509 United States |
+1 (814) 217-6038 | acoseo@wqln.org |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WQLN will be moving from channel 50 to channel 27 in phase 6. Please see attached full transition plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HP50SAW | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | HPTV-PRLX-U12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 20 kW | |
Justification for New Transmitter | Please see attached transition plan. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Miscellaneous conduit, wiring and ladder tray installation. Please see attached transition plan. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 300.0 kW | |
Manufacturer | ||
Model | TFU-13JTT/VP-R 4C170 | |
Year | 2013 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 191.0 kW | |
Manufacturer | ||
Model | TFU-10GTH/VP-R 4C170 | |
Year | 2019 | |
Justification for New Antenna | Current antenna is designed for channel 50. Please see attached transition plan. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 8 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 77.0 % | |
Other Antenna Type | N/A | |
ERP: | 194.8 kW | |
Manufacturer | ||
Model | 75010420 | |
Year | 2019 | |
Justification for New Antenna | This antenna is needed to maintain service while the main antenna is being replaced. Please see attached transition plan. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Myat |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 775 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 5 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 600 feet per run | |
Justification for New Transmission Line | This line will provide interim operation on channel 50 while the main antenna is being changed. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1001555 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 02' 33.3" N- |
Longitude (NAD83) | 080° 03' 55.8" W- | |
Overall Structure Height | 707.01 feet | |
Support Structure Height | 681.75 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1304.77 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SBA GC Towers, LLC | |
Date Constructed | 01/01/1978 |
Facility ID | Call Sign | Service |
---|---|---|
53720 | WQLN-FM | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Interim Rigging Expense |
Expenses related to installation of interim antenna and transmission line. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 160 | |
Explanation | To assist with the implementation and completion of transition from channel 50 to channel 27. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Prepare and Review Progress Reports |
Engineering and legal expenses associated with preparation of quarterly progress reports. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Restore walls and floors |
Repairs will be required after the removal of the existing transmitter. |
Inside RF system |
This equipment will be used to rework the feed to the antenna to support the new channel. Please see attached transition plan. |
PE Review |
This is to cover the professional engineer costs for the required review of the rigging plan. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $728,508.00 | $694,508.00 | N/A | $567,906.00 | N/A |
Total for all systems | $1,917,940.80 | $1,801,575.80 | N/A | $585,423.87 | N/A |
Primary Transmitter HPTV-PRLX-U12 | $728,508.00 | $694,508.00 | $567,906.00 | ||
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $650,000.00 | N/A | $539,420.73 | N/A |
Other Electrical Service: Miscellaneous conduit, wiring and ladder tray installation. Please see attached transition plan. | $26,500.00 | $26,500.00 | Please see attached "New Transmitter Proposal 07-20-17.pdf" | $26,420.00 | N/A |
Other -- HVAC Service Type: H Size:5 (Other) | $18,008.00 | $18,008.00 | N/A | $2,065.27 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Other Electrical Service: Miscellaneous conduit, wiring and ladder tray installation. Please see attached transition plan. | |
Other -- HVAC Service Type: H Size:5 (Other) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $429,410.00 | $381,500.00 | N/A | $0.00 | N/A |
Total for all systems | $1,917,940.80 | $1,801,575.80 | N/A | $585,423.87 | N/A |
Interim Antenna 75010420 | $119,280.00 | $113,400.00 | $0.00 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | N/A | N/A |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | $89,400.00 | $85,000.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Primary Antenna TFU-10GTH/VP-R 4C170 | $310,130.00 | $268,100.00 | $0.00 | ||
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $250,000.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $0.00 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,900.00 | $11,700.00 | Actual antenna input anticipated to be 6" | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | Information not provided. |
Sweep test of existing antenna | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $63,000.00 | $60,000.00 | N/A | $0.00 | N/A |
Total for all systems | $1,917,940.80 | $1,801,575.80 | N/A | $585,423.87 | N/A |
Interim Transmission Line | $63,000.00 | $60,000.00 | $0.00 | ||
Flexible Air Transmission Line - dielectric, 5" | $63,000.00 | $60,000.00 | N/A | N/A | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $323,100.00 | $312,000.00 | N/A | $0.00 | N/A |
Total for all systems | $1,917,940.80 | $1,801,575.80 | N/A | $585,423.87 | N/A |
Primary Tower GTOWER | $323,100.00 | $312,000.00 | $0.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | $0.00 | N/A |
Interim Rigging Expense | $100,000.00 | $100,000.00 | Costs associated with the installation of the interim antenna and transmission line. Please see attached transition plan. | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | |
Interim Rigging Expense | Information not provided. |
Tall Tower (greater than 500') | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $160,400.00 | $149,125.00 | N/A | $5,774.25 | N/A |
Total for all systems | $1,917,940.80 | $1,801,575.80 | N/A | $585,423.87 | N/A |
Outside Professional Services | $160,400.00 | $149,125.00 | $5,774.25 | ||
Prepare and Review Progress Reports | $16,000.00 | $16,000.00 | Engineering and legal expenses associated with the preparation and review of quarterly reports. Please see attached transition plan. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $1,000.00 | N/A | N/A | N/A |
Project management of the transition | $25,280.00 | $24,000.00 | N/A | $3,449.25 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $1,875.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $2,325.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare and Review Progress Reports | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Perform engineering study for new channel assignment and antenna development |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $213,522.80 | $204,442.80 | N/A | $11,743.62 | N/A |
Total for all systems | $1,917,940.80 | $1,801,575.80 | N/A | $585,423.87 | N/A |
Other Expenses | $213,522.80 | $204,442.80 | $11,743.62 | ||
MVPD Notification of Channel Change | $1,000.00 | $1,000.00 | Please see attached transition plan. | N/A | N/A |
Develop and air announcement of upcoming channel change | $5,000.00 | $5,000.00 | Please see attached transition plan. | N/A | N/A |
Equipment Storage | $1,500.00 | $1,500.00 | Rental storage container for an estimated 6 months during the transmitter construction phase. Please see attached transition plan. | N/A | N/A |
Equipment Delivery and Handling Charges | $15,000.00 | $15,000.00 | Please see attached transition plan. | N/A | N/A |
PE Review | $7,500.00 | $7,500.00 | This is to cover the costs for the required PE review of tower rigging plans. | N/A | N/A |
Inside RF system | $140,000.00 | $140,000.00 | The current installation uses waveguide for channel 50 which can't be used on the new channel 27. | $11,743.62 | N/A |
Restore walls and floors | $3,972.80 | $3,972.80 | There will be repairs required after the removal of our current transmitter. Please see attached "WQLN floor repair quote" | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,470.00 | N/A | N/A | N/A |
Non-zoning permits | $3,000.00 | $3,000.00 | Miscellaneous building permits. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $25,000.00 | $25,000.00 | Please see attached transition plan. | N/A | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
PE Review | Information not provided. |
Inside RF system | |
Restore walls and floors | Information not provided. |
DTV Medical Facility Notification | Information not provided. |
Non-zoning permits | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,917,940.80 | $1,801,575.80 | $585,423.87 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Cynthia Spizarny Vice President and General Manager 07/17/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Cynthia Spizarny Vice President and General Manager 07/17/2018 |