Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
LILLY BROADCASTING OF PENNSYLVANIA LICENSE SUBSIDIARY, LLC Doing Business As: LILLY BROADCASTING OF PENNSYLVANIA LICENSE SUBSIDIARY, LLC |
Kevin T. Lilly 3514 STATE STREET ERIE, PA 16508 United States |
+1 (814) 454-5201 | KEVIN@LILLYTV.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Relocate from ASR #1221626 to ASR #1055828. Construct post-repack facilities at alternate location. No interim facilities required. Install new transmitter, RF system, transmission line and antenna on post-repack channel 21 pursuant to CP authorization. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HU3750AD Innovator HX | |
Year | 2007 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 3.75 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-10 EVO | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12.5 kW | |
Justification for New Transmitter | The existing transmitter cannot be retuned to operate on channel 16. The manufacturer is no longer supporting the equipment. The power increase is required due to antenna gain. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1200.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
RF Interconnect |
Interconnect between RF System and transmission line |
Removal of Existing Equipment |
Removal of existing transmitters and equipment / Site Prep |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 75.0 kW | |
Manufacturer | ||
Model | TLP-24M (C) | |
Year | 2007 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 96.0 kW | |
Manufacturer | ||
Model | ATC-BCE416O-V0-21 | |
Year | 2018 | |
Justification for New Antenna | The existing antenna is a coaxial slot antenna that is channel-specific and not usable on channel 21. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 3 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
2 FT Antenna Mounting Wedding Cake Adapter |
2ft Antenna Mounting Wedding Cake Adapter |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 700 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 800 feet per run | |
Justification for New Transmission Line | A new transmission line is recommended by the antenna manufacturer due to age. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 42° 02' 16.0" N- |
Longitude (NAD83) | 080° 03' 43.0" W- | |
Overall Structure Height | 749.33 feet | |
Support Structure Height | 699.79 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1346.11 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Lilly Broadcasting of Pennsylvania, LLC | |
Date Constructed | 09/01/1981 |
Facility ID | Call Sign | Service |
---|---|---|
28774 | WCTL | FM |
24970 | WICU-TV | DTV |
Users |
---|
W254AJ |
W32DH-D |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1221626 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 03' 52.2" N- |
Longitude (NAD83) | 080° 00' 18.2" W- | |
Overall Structure Height | 843.17 feet | |
Support Structure Height | 800.52 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1374.66 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Vertical Bridge Towers, LLC | |
Date Constructed | 07/01/1966 |
Facility ID | Call Sign | Service |
---|---|---|
24970 | WICU-TV | DTV |
Users |
---|
Public safety |
Cellular users |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | The station's attorney will manage the reimbursement filings, review engineering applications, and engage in any additional coordination that is needed for WSEE to accomplish its repack transition. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | Yes |
Is Remediation needed? | Yes | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $675,950.00 | $553,306.00 | N/A | $0.00 | N/A |
Total for all systems | $2,847,280.00 | $2,334,741.00 | N/A | $3,557.50 | N/A |
Primary Transmitter THU9-10 EVO | $675,950.00 | $553,306.00 | $0.00 | ||
Removal of Existing Equipment | $25,000.00 | $25,000.00 | Estimate based on prior experience. | N/A | N/A |
RF Interconnect | $25,000.00 | $25,000.00 | Estimate based on prior experience. | N/A | N/A |
Other -- Building Addition Size: 1200.0 | $60,000.00 | $60,000.00 | Building modification required for post-repack build out. Estimate based on prior experience. | N/A | N/A |
5 Ton system | $20,250.00 | $19,700.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,850.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $373,706.00 | N/A | $0.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,050.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Removal of Existing Equipment | Information not provided. |
RF Interconnect | Information not provided. |
Other -- Building Addition Size: 1200.0 | Information not provided. |
5 Ton system | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $327,830.00 | $205,700.00 | N/A | $0.00 | N/A |
Total for all systems | $2,847,280.00 | $2,334,741.00 | N/A | $3,557.50 | N/A |
Primary Antenna ATC-BCE416O-V0-21 | $327,830.00 | $205,700.00 | $0.00 | ||
2 FT Antenna Mounting Wedding Cake Adapter | $24,000.00 | $24,000.00 | Estimate based on prior experience. | $0.00 | N/A |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | $7,600.00 | $7,200.00 | N/A | $0.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $169,500.00 | N/A | $0.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $5,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
2 FT Antenna Mounting Wedding Cake Adapter | |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $124,500.00 | $112,100.00 | N/A | $0.00 | N/A |
Total for all systems | $2,847,280.00 | $2,334,741.00 | N/A | $3,557.50 | N/A |
Primary Transmission Line | $124,500.00 | $112,100.00 | $0.00 | ||
Rigid Transmission Line - copper, 3 1/8" | $83,200.00 | $80,800.00 | N/A | $0.00 | N/A |
Flexible Air Transmission Line - dielectric, 3" | $41,300.00 | $31,300.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 3 1/8" | |
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $868,300.00 | $845,100.00 | N/A | $0.00 | N/A |
Total for all systems | $2,847,280.00 | $2,334,741.00 | N/A | $3,557.50 | N/A |
Primary Tower TOWER | $210,500.00 | $205,000.00 | $0.00 | ||
Tall Tower (greater than 500') | $210,500.00 | $205,000.00 | N/A | $0.00 | N/A |
Primary Tower GTOWER | $657,800.00 | $640,100.00 | $0.00 | ||
Tall Tower (greater than 500') | $210,500.00 | $205,000.00 | N/A | $0.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $409,500.00 | N/A | $0.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,600.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Tall Tower (greater than 500') | Information not provided. |
Tall Tower (greater than 500') | |
Major tower reinforcement/modifications | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $171,770.00 | $162,850.00 | N/A | $3,557.50 | N/A |
Total for all systems | $2,847,280.00 | $2,334,741.00 | N/A | $3,557.50 | N/A |
Outside Professional Services | $171,770.00 | $162,850.00 | $3,557.50 | ||
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $337.50 | N/A |
Project management of the transition | $31,600.00 | $30,000.00 | N/A | $3,220.00 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Project management of the transition | |
RF Exposure Measurements | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $73,630.00 | $71,585.00 | N/A | $0.00 | N/A |
Total for all systems | $2,847,280.00 | $2,334,741.00 | N/A | $3,557.50 | N/A |
Other Expenses | $73,630.00 | $71,585.00 | $0.00 | ||
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | Estimate based on prior experience. | N/A | N/A |
Develop and air announcement of upcoming channel change | $10,000.00 | $10,000.00 | Estimate based on prior experience. | N/A | N/A |
Equipment Storage | $1,500.00 | $1,500.00 | Estimate based on prior experience. | N/A | N/A |
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | Estimate based on prior experience. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | Estimate based on prior experience. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
AM Pattern Disturbance -- Impact study | $7,890.00 | $7,500.00 | N/A | N/A | N/A |
AM Pattern Disturbance -- Remedy | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,847,280.00 | $2,334,741.00 | $3,557.50 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin Lilly Managing Member of Sole Member 10/03/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kevin Lilly Managing Member of Sole Member 10/03/2018 |