Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
HEARST PROPERTIES INC. |
C/O BROOKS, PIERCE, ET. AL P.O. BOX 1800 RALEIGH, NC 27602 United States |
+1 (919) 839-0300 | mprak@brookspierce.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | see attached document |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | backup to main transmitter | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3100P1 | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | Existing IOT transmitter cannot be converted to ch 14. See GatesAir EOL and HTV IOT to Solid-State Justification. IOT replacement is more costly than proposed SS transmitter. See Comark Transmitter quote. Also see Transmitter Justification. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 250.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Electrical Accessories |
manufacturer required surge protection |
Additional RF components |
Additional RF components required for transmitter operation and integration into current RF environment |
Shipping |
transmitter shipping |
Sales Tax |
transmitter sales tax |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3100P1 | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | Existing IOT transmitter cannot be converted to ch 14. See GatesAir EOL and HTV IOT to Solid-State Justification. IOT replacement is more costly than proposed SS transmitter. See Comark Transmitter quote. Also see Transmitter Justification. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 250.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | 60 |
Name | Description |
---|---|
Transmitter de-install |
needed to make space for replacement transmitter |
Electrical Accessories |
manufacturer required surge protection |
Sales Tax |
transmitter sales tax |
Shipping |
transmitter shipping |
Additional RF components |
Additional RF components required for transmitter operation and integration into current RF environment |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | Raycom Media | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 51 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 545.00 MHz | |
Upper Limit | 695.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ABBP14H4-HTOC5-26/51 | |
Year | 2003 |
Facility ID | Call Sign |
---|---|
13989 | WAVE |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Leased | |
Owner | Raycom Media | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 14 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 608.00 MHz | |
Design power capacity in use | 50.0 % | |
Other Antenna Type | N/A | |
ERP: | 452.0 kW | |
Manufacturer | ||
Model | TUD-C5-14/70-2-T | |
Year | 2019 | |
Justification for New Antenna | Existing antenna does not support channel 14 |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
36 |
14 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Leased | |
Owner | Raycom Media | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 24 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 680.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 452.0 kW | |
Manufacturer | ||
Model | TFU-WB24 | |
Year | 2018 | |
Justification for New Antenna | required while main antenna is replaced |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 2 | |
Length | 1000 feet per run |
Facility ID | Call Sign |
---|---|
13989 | WAVE |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 950 feet per run | |
Justification for New Transmission Line | Interim during main antenna replacement |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Number of Hours | N/A | |
Explanation | N/A | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Transmitter Site Survey |
Transmitter planning survey & transmitter building drawings |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Land Mobile Notification |
notify land mobile users of the coming channel 14 signal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,189,064.01 | $1,579,977.70 | N/A | $724,630.56 | N/A |
Total for all systems | $3,346,324.01 | $1,738,242.70 | N/A | $768,130.56 | N/A |
Primary Transmitter ULXTE-30 | $1,095,442.85 | $703,182.49 | $238,597.43 | ||
Additional RF components | $4,709.33 | $4,709.33 | Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote. | N/A | N/A |
Shipping | $7,700.00 | $7,700.00 | transmitter shipping per attached GatesAir quote | N/A | N/A |
Sales Tax | $44,902.00 | $44,902.00 | transmitter sales tax per attached GatesAir quote | N/A | N/A |
RF Consulting Engineer | $5,260.00 | $10,000.00 | Channel 14 interference investigation and remediation. Many land-mobile users and great difficulty in remediating to eliminate interference. | $9,817.50 | N/A |
Channel 14 Mask Filter | $189,500.00 | $0.00 | included in cost of transmitter, see GatesAir quotes | N/A | N/A |
Channel 14 -- Additional field engineering time, 60 days | $60,000.00 | $60,000.00 | remediation of land-mobile interference | N/A | N/A |
Transmitter de-install | $20,679.03 | $20,679.03 | current transmitter removal required to make space for replacement | N/A | N/A |
Electrical Accessories | $1,942.49 | $1,942.49 | manufacturer required surge protection | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $510,476.71 | GatesAir quote sections A & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. | $228,779.93 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $5,222.93 | N/A | N/A | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $13,000.00 | $12,250.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $25,300.00 | N/A | N/A | N/A |
Auxiliary Transmitter ULXTE-30 | $1,093,621.16 | $876,795.21 | $486,033.13 | ||
Sales Tax | $34,291.00 | $34,291.00 | transmitter sales tax per attached GatesAir quote | N/A | N/A |
Shipping | $7,700.00 | $7,700.00 | transmitter shipping per attached GatesAir quote | N/A | N/A |
Additional RF components | $99,869.34 | $99,869.34 | Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote. | N/A | N/A |
Electrical Accessories | $1,510.82 | $1,510.82 | manufacturer required surge protection | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $0.00 | included in cost of transmitter, see GatesAir quotes | N/A | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $13,000.00 | $12,250.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $2,798.21 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $25,300.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $693,075.84 | GatesAir quote sections A, B & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. | $486,033.13 | N/A |
Actual Information Description | File Name |
---|---|
Additional RF components | Information not provided. |
Shipping | Information not provided. |
Sales Tax | Information not provided. |
RF Consulting Engineer | |
Channel 14 Mask Filter | Information not provided. |
Channel 14 -- Additional field engineering time, 60 days | Information not provided. |
Transmitter de-install | Information not provided. |
Electrical Accessories | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Sales Tax | Information not provided. |
Shipping | Information not provided. |
Additional RF components | Information not provided. |
Electrical Accessories | Information not provided. |
Channel 14 Mask Filter | Information not provided. |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $770,660.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $3,346,324.01 | $1,738,242.70 | N/A | $768,130.56 | N/A |
Interim Antenna TFU-WB24 | $6,730.00 | $0.00 | $0.00 | ||
Sweep test of existing antenna | $6,730.00 | $0.00 | WAVE/Raycom Media submitting for reimbursement | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 452 kW input, directional,, horizontally polarized | $0.00 | $0.00 | WAVE (Raycom Media) Quote and "TFU-24WB interim antenna justification" attached. Raycom submitting for full reimbursement. | N/A | N/A |
Primary Antenna TUD-C5-14/70-2-T | $763,930.00 | $0.00 | $0.00 | ||
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $0.00 | WAVE/Raycom Media submitting for full reimbursement | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $0.00 | WAVE/Raycom Media submitting for full reimbursement | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, horizontally polarized | $547,000.00 | $0.00 | WAVE/Raycom Media submitting for full reimbursement | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $0.00 | WAVE/Raycom Media submitting for full reimbursement | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $220,400.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $3,346,324.01 | $1,738,242.70 | N/A | $768,130.56 | N/A |
Interim Transmission Line | $220,400.00 | $0.00 | $0.00 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $220,400.00 | $0.00 | WAVE/Raycom Media submitting for full reimbursement | N/A | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $139,720.00 | $133,350.00 | N/A | $30,350.00 | N/A |
Total for all systems | $3,346,324.01 | $1,738,242.70 | N/A | $768,130.56 | N/A |
Outside Professional Services | $139,720.00 | $133,350.00 | $30,350.00 | ||
Transmitter Site Survey | $20,600.00 | $20,600.00 | Transmitter planning survey & transmitter building drawings quote attached | $20,600.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $7,950.00 | Increased cost due to channel 14 assignment |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,800.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Site Survey | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $26,480.00 | $24,915.00 | N/A | $13,150.00 | N/A |
Total for all systems | $3,346,324.01 | $1,738,242.70 | N/A | $768,130.56 | N/A |
Other Expenses | $26,480.00 | $24,915.00 | $13,150.00 | ||
Land Mobile Notification | $9,400.00 | $9,400.00 | needed to fulfill FCC requirement to notify land mobile users of the potential interference from channel 14. Quote attached. | $9,400.00 | N/A |
MVPD Notification of Channel Change | $2,500.00 | $2,500.00 | need BP quote | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $10,000.00 | N/A | $3,750.00 | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | need BP quote | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Land Mobile Notification | |
MVPD Notification of Channel Change | Information not provided. |
DTV Medical Facility Notification | |
Develop and air announcement of upcoming channel change | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,346,324.01 | $1,738,242.70 | $768,130.56 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John Drain Hearst Television SVP Chief Financial Officer 06/15/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 06/15/2018 |