Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WXOW-WQOW LICENSE, LLC Doing Business As: WXOW-WQOW LICENSE, LLC |
P.O. BOX 909 QUINCY, IL 62306 United States |
+1 (217) 223-5100 | bdreasler@quincyinc.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen QCommunications, LLC |
Tony zumMallen 705B SE Melody LN #314 Lees Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@qcom1.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Transition from ch48 to ch28 will require a new top mount antenna, line and transmitter. An interim system will be required to provide market coverage during the transition. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Atlas | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 13 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-40 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 25 kW | |
Justification for New Transmitter | Existing transmitter is not tunable per the manufacturer. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 200.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 25 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Training |
Transmitter training - offsite - 1 week in duration at mfg site. |
Sales Tax |
Sales tax for eq |
Site Survey - TX |
Site survey is required to be performed before the new transmitter and components installation plan can be finalized. |
Disconnect existing Transmitter |
Disconnect transmitter and components from existing configuration and move within building |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12 kW | |
Justification for New Transmitter | Interim facility is required to avoid prolonged period of station silence during transition, and station currently has no aux facility to use for interim operation. Extended silent period during transition to new channel is unreasonable. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 200.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 15 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 371.0 kW | |
Manufacturer | ||
Model | TWS-30T | |
Year | 1989 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 18 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 50.0 % | |
Other Antenna Type | N/A | |
ERP: | 251.0 kW | |
Manufacturer | ||
Model | TFU-18GTH | |
Year | 2017 | |
Justification for New Antenna | Existing antenna is not tunable to new channel assignment. Adding Vertical component to Primary antenna and do not know of any upgraded pricing as of time of filing. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 8 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 75.0 % | |
Other Antenna Type | N/A | |
ERP: | 20.0 kW | |
Manufacturer | ||
Model | TFU-8WB | |
Year | 2017 | |
Justification for New Antenna | Interim facility is required to avoid prolonged period of station silence during transition, and station currently has no aux facility to use for interim operation. Extended silent period during transition to new channel is unreasonable. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 4 1/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
50 |
48 |
Name | Description |
---|---|
FREIGHT |
FREIGHT FOR DELIVERY TO STAGING AREA OR STATION |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 900 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 900 feet per run | |
Justification for New Transmission Line | Required to make the channel reassignment change over. |
Name | Description |
---|---|
Disconnect existing Interior RF components |
Disconnect interior transmission line and filters from existing configuration and move within the building. |
Securirty - Site |
This site requires security once the new transmission line and equipment arrive on site to be installed. Estimated length of 4-6 weeks. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 900 feet per run | |
Justification for New Transmission Line | Interim facility is required to avoid prolonged period of station silence during transition, and station currently has no aux facility to use for interim operation. Extended silent period during transition to new channel is unreasonable. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1035149 | |
Coordinates (NAD83) | Latitude (NAD83) | 43° 48' 23.0" N- |
Longitude (NAD83) | 091° 22' 03.0" W- | |
Overall Structure Height | 819.22 feet | |
Support Structure Height | 763.44 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1225.71 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WXOW-WQOW Television, Inc. | |
Date Constructed | 10/23/1982 |
Facility ID | Call Sign | Service |
---|---|---|
20665 | WIZM-FM | FM |
Users |
---|
2-Way service |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 613 | |
Explanation | Scope & significance of project (QMI has multiple stations repacked) require outside management services to augment existing internal personnel to assist turnkey management of and ensure timely and safe execution of channel relocation. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
General Repack Attorney |
See uploaded memo-QMI Repack Invoice Memo for Shared Legal Expenses (Matter 104411 00054) for Form 399 |
Quarterly reporting -Atty |
Preparation and submittal of the FCC required quarterly report 387 by the attorney. |
PM Reimbursable expenses |
Expenses in quotes that are reimbursable for travel and in field Per Diem |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,020,521.93 | $1,927,521.93 | N/A | $932,035.17 | N/A |
Total for all systems | $3,605,673.93 | $3,452,244.93 | N/A | $1,443,516.08 | N/A |
Interim Transmitter ULXTE-20 | $774,471.60 | $737,571.60 | $333,724.38 | ||
Sales tax | $33,271.60 | $33,271.60 | sales tax calc per mfg quote and inv | $11,090.54 | N/A |
UHF inside RF system including switching | $147,500.00 | $140,000.00 | N/A | $22,415.72 | N/A |
15 Ton system | $55,800.00 | $53,000.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $470,000.00 | N/A | $293,153.04 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $7,065.08 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $5,000.00 | N/A | N/A | N/A |
Primary Transmitter ULXTE-40 | $1,246,050.33 | $1,189,950.33 | $598,310.79 | ||
Disconnect existing Transmitter | $25,000.00 | $25,000.00 | Disconnect transmitter and components from existing configuration and move within building to make way for new facilities. | N/A | N/A |
Site Survey - TX | $25,000.00 | $25,000.00 | Site survey and report are required to be performed before the new transmitter and components installation plan can be finalized. | N/A | N/A |
Sales Tax | $59,650.33 | $59,650.33 | Sales tax est on mfg invoice | $19,883.44 | N/A |
Transmitter Training | $3,300.00 | $3,300.00 | Transmitter training - offsite - 1 week in duration at mfg site. | N/A | N/A |
25 Ton system | $91,500.00 | $87,000.00 | N/A | N/A | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $5,000.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | $5,697.49 | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $900,000.00 | N/A | $538,610.92 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $34,118.94 | NOT OVER - 12/20/17 1ST SUBMITTAL NEEDS TO BE DELETED. FCC SENT METADATA CORRECTIONS EMAIL AND SAID THIS INV WAS UNLOCKED. INV NOT UNLOCKED, SEE ATTACHED UPLOAD- FCC-EMAIL-2-22-WXOW-UNLOCKED INVOICE GO1000147.JPG- SE UPLOADED NEW CORRECTED METADATA 2-22. |
Actual Information Description | File Name |
---|---|
Sales tax | |
UHF inside RF system including switching | |
15 Ton system | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
Switchgear - industrial 800 amp | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Disconnect existing Transmitter | Information not provided. |
Site Survey - TX | Information not provided. |
Sales Tax | |
Transmitter Training | Information not provided. |
25 Ton system | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Switchgear - industrial 800 amp |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $609,970.00 | $593,600.00 | N/A | $294,079.51 | N/A |
Total for all systems | $3,605,673.93 | $3,452,244.93 | N/A | $1,443,516.08 | N/A |
Interim Antenna TFU-8WB | $322,290.00 | $306,800.00 | $58,635.00 | ||
FREIGHT | $6,000.00 | $6,000.00 | FREIGHT FROM MFG TO STAGING OR STATION. MAY HAVE MULTIPLE SHIPPERS | $4,455.00 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | N/A | N/A |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | $10,950.00 | $10,400.00 | N/A | $9,255.00 | N/A |
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $120,000.00 | N/A | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
UHF . Broadband Slot, Side Mount, 8 bay, 20 kW input, directional, horizontally polarized | $60,000.00 | $57,000.00 | N/A | $44,925.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Primary Antenna TFU-18GTH | $287,680.00 | $286,800.00 | $235,444.51 | ||
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | $10,950.00 | $10,400.00 | N/A | $9,110.70 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $5,760.00 | N/A |
UHF - High Power Top Mount One Station antenna elliptically or circularly polarized | $270,000.00 | $270,000.00 | Entered Catalog of Costs dollar amount. The Predetermined did not auto complete for the Primary antenna. To alleviate the situation add the CofC to the EST cost column. We do not have any upgrade costs at the time of the filing. | $220,573.81 | N/A |
Actual Information Description | File Name |
---|---|
FREIGHT | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | |
Combiner output splitting/switching for dual feed lines, if applicable | Information not provided. |
New combiner, cost per channel (without antenna) | Information not provided. |
UHF . Broadband Slot, Side Mount, 8 bay, 20 kW input, directional, horizontally polarized | |
Sweep test of existing antenna | Information not provided. |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount One Station antenna elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $285,600.00 | $273,000.00 | N/A | $188,587.84 | N/A |
Total for all systems | $3,605,673.93 | $3,452,244.93 | N/A | $1,443,516.08 | N/A |
Interim Transmission Line | $127,800.00 | $121,500.00 | $96,514.60 | ||
Rigid Transmission Line - copper, 4 1/16" | $127,800.00 | $121,500.00 | N/A | $96,514.60 | N/A |
Primary Transmission Line | $157,800.00 | $151,500.00 | $92,073.24 | ||
Securirty - Site | $17,500.00 | $17,500.00 | This site requires security once the new transmission line and equipment arrive on site to be installed. Estimated length of 4-6 weeks. | N/A | N/A |
Disconnect existing Interior RF components | $12,500.00 | $12,500.00 | Disconnect interior transmission line and filters from existing configuration and move within the building to make way for new facilities. | N/A | N/A |
Rigid Transmission Line - copper, 4 1/16" | $127,800.00 | $121,500.00 | N/A | $92,073.24 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 4 1/16" | |
Securirty - Site | Information not provided. |
Disconnect existing Interior RF components | Information not provided. |
Rigid Transmission Line - copper, 4 1/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $381,100.00 | $362,000.00 | N/A | $0.00 | N/A |
Total for all systems | $3,605,673.93 | $3,452,244.93 | N/A | $1,443,516.08 | N/A |
Primary Tower TOWER | $381,100.00 | $362,000.00 | $0.00 | ||
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | Tool is not accounting for two separate antenna installations. One for the interim and One for the main. $200k each is the budget on a tall tower. | N/A | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $245,402.00 | $233,608.00 | N/A | $28,813.56 | N/A |
Total for all systems | $3,605,673.93 | $3,452,244.93 | N/A | $1,443,516.08 | N/A |
Outside Professional Services | $245,402.00 | $233,608.00 | $28,813.56 | ||
PM Reimbursable expenses | $13,408.00 | $13,408.00 | PM - infield travel and Per Diem reimbursable expenses | $1,020.00 | N/A |
Quarterly reporting -Atty | $4,500.00 | $4,500.00 | Preparation and submittal of the FCC required quarterly report 387 by the attorney. EST. 6qtrs@$750 | N/A | N/A |
General Repack Attorney | $10,000.00 | $10,000.00 | see uploaded memo from Brooks Pierce-QMI Repack Invoice Memo for Shared Legal Expenses (Matter 104411 00054) for Form 399 | $1,524.06 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | We need 1 STA for the initial request and we are budgeting 1 additional STA in case the project requires an addition STA for unforeseen issues during the construction period. | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $4,162.00 | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | We need 1 STA for the initial request and we are budgeting 1 additional STA in case the project requires an addition STA for unforeseen issues during the construction period. | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,970.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $3,000.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $96,854.00 | $91,950.00 | N/A | $17,137.50 | PLEASE DELETE SUBMITTED -INV QC17-133- DEPOSIT INV. -PER RFAS- 12/27/17 THIS SUBMITAL IS EARNED. SEE PM INVOICE WXOW-INV QC17-133. TOTAL AMOUNT BILLED TO DATE SHOULD BE $17,137.50 |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
PM Reimbursable expenses | |
Quarterly reporting -Atty | Information not provided. |
General Repack Attorney | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | |
Prepare and or review reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $63,080.00 | $62,515.00 | N/A | $0.00 | N/A |
Total for all systems | $3,605,673.93 | $3,452,244.93 | N/A | $1,443,516.08 | N/A |
Other Expenses | $63,080.00 | $62,515.00 | $0.00 | ||
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | FCC required announcements. | N/A | N/A |
Develop and air announcement of upcoming channel change | $15,000.00 | $15,000.00 | Required FCC announcements and good will public relations must we upheld. The production airing and disseminating of these announcements are fundamental to our operations. | N/A | N/A |
Equipment Storage | $13,000.00 | $13,000.00 | Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate from 6-24 months of storage time. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | Rent 40 yard dumpster with multiple pickups. Estimated 6- months on site. Potential hazardous waste management issues. | N/A | N/A |
Equipment Delivery and Handling Charges | $8,000.00 | $8,000.00 | Transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,605,673.93 | $3,452,244.93 | $1,443,516.08 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | BRADY DREASLER CORPORATE DIRECTOR OF ENGINEERING 03/28/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | BRADY DREASLER CORPORATE DIRECTOR OF ENGINEERING 03/28/2018 |