Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CBS BROADCASTING INC. Doing Business As: CBS BROADCASTING INC. |
Edwin L Nass 1725 DESALES ST NW SUITE 501 WASHINGTON, DC 20036 United States |
+1 (202) 457-4505 | ELNASS@CBS.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Edwin L Nass , Nass . Director of Spectrum Management CBS |
Edwin L Nass 1725 DeSales Street NW Suite 501 Washington, DC 20036 United States |
+1 (202) 457-4602 | elnass@cbs.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | New channel 21 TFU-18 antenna and 6-1/8" line to be installed on the south arm of candelabra. Tower owner providing interim broad band antenna system to be leased. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SigmaCD-2200P2 | |
Year | 1999 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 46 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 31.7 kW | |
Justification for New Transmitter | GatesAir Won't Re-tune (See Exhibit 1). IOT replacement is more expensive (See Exhibit 2). Proposed replacement is less expensive (Exhibit 3). |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Transformer (See GatesAir Exhibit 3 - Item D1), Surge Suppressor (See GatesAir Exhibit 3 - Item D2), Various Main Site Electrical Work (See Exhibit 4). | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 425.0 kW | |
Manufacturer | ||
Model | TFU-18GTH | |
Year | 1998 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 264.0 kW | |
Manufacturer | ||
Model | TFU-18GTH | |
Year | 2018 | |
Justification for New Antenna | Existing antenna cannot be retuned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Rent Temporary | |
Ownership | Leased | |
Owner | American Tower Corporation | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Slot | |
Number of Stations Supported | 3 | |
Number of Panels/Bays | 8 | |
Lower Limit | 407.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 0.0 % | |
Other Antenna Type | N/A | |
ERP: | 264.0 kW | |
Manufacturer | ||
Model | TFU-24 WB/VP-C160 | |
Year | 2018 | |
Justification for New Antenna | Required for continued operation while main WWJ-TV antenna is replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 7 3/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
44 |
21 |
43 |
Name | Description |
---|---|
Building Permits |
The cost of preparation and submission of the needed forms for permits for jurisdictional permits required for electrical, building, and other required tasks associated with the install of the interim antenna combiner equipment. |
Concrete Pad |
8X8 foot concrete pad for HVAC compressor unit and fencing for security. |
Combiner HVAC |
Installation, equipment and material cost of 10-ton HVAC unit for new repack combiner room. The proper BTU were calculated to control the temperature in this space due to the sensitive equipment. |
Ice Shield |
Ice protection for new outdoor HVAC equipment outside the combiner room. The total estimated area is 64 sq. ft. |
Conduit |
This cost includes 200 L/F of 2" conduit and conductor to adequately supply the HVAC unit. |
New Electrical Panel |
New HVAC electrical sub-panel for new AC unit required for the repack combiner area fed off of existing 480/208 main panel. This equipment is required to provide the existing power to the HVAC unit. |
Install Combiner |
Cost is for installing and proofing combiner. |
Switchgear |
New switchgear required accommodating additional repack equipment. This switch is used to supply power for the new HVAC system for the combiner room. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1150 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1150 feet per run | |
Justification for New Transmission Line | Existing line segment length cannot be used on new channel. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 995 feet per run | |
Justification for New Transmission Line | Material costs for 995 foot 7-3/16" Broadband transmission line, three (3) elbows and a nitrogen generator for pressurization control on the line. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1003429 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 26' 52.5" N- |
Longitude (NAD83) | 083° 10' 23.1" W- | |
Overall Structure Height | 1086.93 feet | |
Support Structure Height | 1012.13 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 662.07 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Tower, LLC | |
Date Constructed | 06/11/1999 |
Facility ID | Call Sign | Service |
---|---|---|
59592 | WJLB | FM |
6056 | WRCJ-FM | FM |
6594 | WNIC | FM |
59952 | WDTW-FM | FM |
6592 | WKQI | FM |
16817 | WTVS | DTV |
74211 | WMYD | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Engineering |
Rigorous Structural analysis to access the structural capacity and modifications needed to accommodate the repacked equipment (see Exhibit 6). |
Site Security |
The value of the materials required for the repack will require security to prevent theft during off hours (see Exhibit 6). |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 250 | |
Explanation | Company lacks internal resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Coordination Meeting |
Meeting to coordinate efforts among broadcasters, tower owner, and tower contractor. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $974,221.00 | $974,221.00 | N/A | $0.00 | N/A |
Total for all systems | $2,955,070.00 | $2,243,004.70 | N/A | $0.00 | N/A |
Primary Transmitter ULXTE-50 | $974,221.00 | $974,221.00 | $0.00 | ||
UHF - Liquid Cooled Solid State Transmitter 31.7 kW | $913,121.18 | $913,121.18 | N/A | N/A | N/A |
Other Electrical Service: Transformer (See GatesAir Exhibit 3 - Item D1), Surge Suppressor (See GatesAir Exhibit 3 - Item D2), Various Main Site Electrical Work (See Exhibit 4). | $61,099.82 | $61,099.82 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $617,144.00 | $419,296.00 | N/A | $0.00 | N/A |
Total for all systems | $2,955,070.00 | $2,243,004.70 | N/A | $0.00 | N/A |
Interim Antenna TFU-24 WB/VP-C160 | $320,914.00 | $251,900.00 | $0.00 | ||
Conduit | $1,667.00 | $1,667.00 | This cost includes 200 L/F of 2" conduit and conductor to adequately supply the HVAC unit (see Exhibit 7). | N/A | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $3,333.00 | Pro-rata share (see Exhibit 7). | N/A | N/A |
Building Permits | $750.00 | $750.00 | Required for installation of interim antenna combiner, HVAC, and electrical panels for combiner room (see Exhibit 7). | N/A | N/A |
Combiner HVAC | $19,167.00 | $19,167.00 | Installation, equipment and material cost of one 10-ton HVAC unit to maintain operational temperatures in the new repack combiner room. The proper BTU were calculated to control the temperature in this space due to the sensitive equipment (see Exhibit 7). | N/A | N/A |
Ice Shield | $1,333.00 | $1,333.00 | Ice protection for new outdoor HVAC equipment outside the combiner room. The total estimated area is 64 sq. ft (see Exhibit 6). | N/A | N/A |
New Electrical Panel | $1,667.00 | $1,667.00 | New HVAC electrical sub-panel for new AC unit required for the repack combiner area fed off of existing 480/208 main panel. This equipment is required to provide the existing power to the HVAC unit (see Exhibit 7). | N/A | N/A |
Install Combiner | $5,000.00 | $5,000.00 | Cost is for installing and proofing combiner. | N/A | N/A |
Switchgear | $6,050.00 | $6,050.00 | New switchgear required accommodating additional repack equipment. This switch is used to supply power for the new HVAC system for the combiner room. | N/A | N/A |
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | $115,500.00 | $117,600.00 | Includes tower space rental and pro-rata share of antenna. Sharing with two other stations requires a broadband antenna (see Exhibit 7). | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $3,333.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 8 bay,, 264 kW input, directional,, elliptically or circularly polarized | $60,000.00 | $60,000.00 | Pro-rata share (see Exhibit 7). | N/A | N/A |
Concrete Pad | $2,000.00 | $2,000.00 | 8X8 foot concrete pad for HVAC compressor unit and fencing for security (see Exhibit 7). | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $30,000.00 | Pro-rata share (see Exhibit 7). | N/A | N/A |
Primary Antenna TFU-18GTH | $296,230.00 | $167,396.00 | $0.00 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $160,996.00 | Exhibit 5 Items 1 and 2, minus $16,950 cost of V-Pol. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $598,135.00 | $249,442.70 | N/A | $0.00 | N/A |
Total for all systems | $2,955,070.00 | $2,243,004.70 | N/A | $0.00 | N/A |
Interim Transmission Line | $331,335.00 | $70,977.00 | $0.00 | ||
Rigid Transmission Line - copper, 7 3/16" broadband | $331,335.00 | $70,977.00 | Pro-rata Material costs for 995 foot 7-3/16" Broadband transmission line, three (3) elbows and a nitrogen generator for pressurization control on the line (see Exhibit 7). | N/A | N/A |
Primary Transmission Line | $266,800.00 | $178,465.70 | $0.00 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $266,800.00 | $178,465.70 | Required for new antenna (see Exhibit 5). | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $618,800.00 | $475,900.00 | N/A | $0.00 | N/A |
Total for all systems | $2,955,070.00 | $2,243,004.70 | N/A | $0.00 | N/A |
Primary Tower GTOWER | $618,800.00 | $475,900.00 | $0.00 | ||
Minor tower reinforcement/modifications | $158,000.00 | $50,000.00 | It is expected that additional loads on the tower require for repack will cause the tower to fail. The structural failure is expected to be in the minor category requiring replacement of structural members (see Exhibit 6). | N/A | N/A |
Structural Engineering | $9,750.00 | $9,750.00 | Rigorous Structural analysis to access the structural capacity and modifications needed to accommodate the repacked equipment. | N/A | N/A |
Site Security | $3,750.00 | $3,750.00 | The value of the materials required for the repack will require security to prevent theft during off hours. | N/A | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $12,400.00 | N/A | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $400,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $87,775.00 | $71,750.00 | N/A | $0.00 | N/A |
Total for all systems | $2,955,070.00 | $2,243,004.70 | N/A | $0.00 | N/A |
Outside Professional Services | $87,775.00 | $71,750.00 | $0.00 | ||
Project management of the transition | $39,500.00 | $37,500.00 | Company lacks internal resources. | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $250.00 | N/A | N/A | N/A |
Site Coordination Meeting | $2,500.00 | $2,500.00 | Meeting to coordinate efforts between broadcasters, tower owner, and tower contractors. | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $10,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $58,995.00 | $52,395.00 | N/A | $0.00 | N/A |
Total for all systems | $2,955,070.00 | $2,243,004.70 | N/A | $0.00 | N/A |
Other Expenses | $58,995.00 | $52,395.00 | $0.00 | ||
DTV Medical Facility Notification | $11,550.00 | $5,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
Local Zoning | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
Non-zoning permits | $5,000.00 | $5,000.00 | Local permits and drawings. See ATC quotes. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $20,000.00 | $20,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,955,070.00 | $2,243,004.70 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 07/07/2017 |