Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GREATER WASHINGTON EDUCATIONAL TELECOMMUNICATIONS ASSOC Doing Business As: GREATER WASHINGTON EDUCATIONAL TELECOMMUNICATIONS ASSOC |
Legal & Business Affairs Dept. 3939 Campbell Ave Arlington, VA 22206 United States |
+1 (703) 998-2851 | LDELANEY@WETA.ORG | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Joseph L. Snelson , Jr . Technical Consultant Meintel, Sgrignoli & Wallace |
1282 Smallwood Drive, Suite 372 Waldorf, MD 20603 United States |
+1 (303) 344-8037 | joe.snelson@mswdtv.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WETA transmits on channel 27 from a shared antenna. WETA was assigned channel 14 for repack, adjacent to Land Mobile operations. See the attached Budget Justification for details on the issues and the transition plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Alternate Site backup transmitter | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CD100P1 | |
Year | 1997 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 17.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12.9 kW | |
Justification for New Transmitter | See attached letter from manufacturer regarding IOT transmitters. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 900.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Notch Filter Install |
Installation of Land Mobile Notch filters |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Used in case of failure of main | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DHD15P1 | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 3.6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-6 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 4.32 kW | |
Justification for New Transmitter | See attached letter from GatesAir regarding inability to retune current transmitter |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Filter Design |
Anticipated expense in the design of Mask and notch filtering to reduce interference to into Land Mobile stations. |
Notch Filter Install |
Installation of additional notch filtering to protect Land Mobile stations. |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DHD15P1 | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 3.6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-6 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 4.32 kW | |
Justification for New Transmitter | See attached letter from GatesAir regading inability to retune current transmitter |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 2000.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Notch Filter Install |
Installation of additional notch filtering to protect Land Mobile stations. |
Rent Increase |
Estimated increase on top of current lease due to having to expand the building to accommodate large channel 14 filtering. |
Filter Design |
Anticipated expense in the design of Mask and notch filtering to reduce interference to into Land Mobile stations. |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-8 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 4.0 kW | |
Justification for New Transmitter | WETA must provide interim facility for WHUT. See attached Budget Justification: AUXILIARY TRANSMITTER SITE |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | No |
Name | Description |
---|---|
Studio-Transmitter-Link |
Microwave or fiber connectivity to get programming from the studio to the interim transmitter site. |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-72 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 40 kW | |
Justification for New Transmitter | WETA must provide interim facility for WPXW. See attached Budget Justification: AUXILIARY TRANSMITTER SITE |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | No |
Name | Description |
---|---|
Studio-Transmitter-Link |
Microwave or fiber connectivity to get programming from the studio to the interim transmitter site. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | District of Columbia Joint Tower Venture | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels | 48 | |
Design power capacity in use | 47.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 73.0 kW | |
Manufacturer | DIE | |
Model | TUP-04-12-2 | |
Year | 1999 |
Facility ID | Call Sign |
---|---|
27772 | WHUT-TV |
74091 | WPXW-TV |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
14 |
33 |
35 |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Alternate site backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 30.0 kW | |
Manufacturer | ||
Model | TFU-8JST-R03 | |
Year | 1998 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | See attached Buget Justification: Auxiliary Transmitter Site | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels/Bays | 32 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 50.0 % | |
Other Antenna Type | N/A | |
ERP: | 30.0 kW | |
Manufacturer | ||
Model | TUA-O4-8/32H-1-R SM | |
Year | 2018 | |
Justification for New Antenna | See attached Budget Justification: AUXILIARY TRANSMITTER SITE. This upgrade is to support two interim stations operations. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
14 |
33 |
35 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Alternate Transmitter Site | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 521 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | Off site backup for 3 stations | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 521 feet per run | |
Justification for New Transmission Line | See attached Budget Justification: AUXILIARY TRANSMITTER SITE. Line must support interim operation for two other stations. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Auxiliary (Backup) | |
Description of Use | Alternate site for WETA | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1018169 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 53' 30.0" N- |
Longitude (NAD83) | 077° 07' 54.0" W- | |
Overall Structure Height | 495.40 feet | |
Support Structure Height | 492.12 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 370.07 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | GREATER WASHINGTON EDUCATIONAL TELECOMMUNICATIONS ASSN DBA = WETA FM | |
Date Constructed | 02/12/2014 |
Facility ID | Call Sign | Service |
---|---|---|
12460 | WGTS | FM |
4644 | WAVA-FM | FM |
65669 | WETA | FM |
Users |
---|
Cellular |
Amateur Radio |
Trunking |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1051670 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 57' 01.0" N- |
Longitude (NAD83) | 077° 04' 46.0" W- | |
Overall Structure Height | 691.92 feet | |
Support Structure Height | 564.95 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 409.77 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | ACC Licensee, LLC | |
Date Constructed | 11/12/1998 |
Facility ID | Call Sign | Service |
---|---|---|
65593 | WUSA | DTV |
73252 | WRQX | FM |
27772 | WHUT-TV | DTV |
74091 | WPXW-TV | DTV |
70933 | WASH | FM |
65707 | WHUR-FM | FM |
1051 | WJLA-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 2100 | |
Explanation | See attached Budget Justification: Outside Professional Services | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Visits and Surveys |
Site visits to establish what equipment is on premises, where new equipment will be located and do equipment inventory for both main and auxiliary sites. |
Progress Reporting |
Prepare and file 7 required progress reports on FCC Form 2100, Schedule 387 on a quarterly basis with the FCC. |
Ch. 14 Field measurments |
Measurements specifically related to channel 14 interference to Land Mobile facilities. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Land Mobile Remediation 1 |
See Budget Justification: LAND MOBILE OPERATIONS |
Land Mobile Remediation 2 |
See Budget Justification: LAND MOBILE |
Land Mobile Remediation 3 |
See Budget Justification: LAND MOBILE |
Land Mobile Remediation 4 |
See Budget Justification: LAND MOBILE |
Land Mobile Remediation 5 |
See Budget Justification: LAND MOBILE |
Additional Legal Expenses |
Additional legal expenses for Public TV station with unable to construct problem, complex main and interim site and Land Mobile issues. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,692,757.00 | $5,411,458.00 | N/A | $0.00 | N/A |
Total for all systems | $48,357,109.00 | $48,050,047.50 | N/A | $0.00 | N/A |
Interim Transmitter ULXTE-8 | $339,000.00 | $339,000.00 | $0.00 | ||
UHF - Liquid Cooled Solid State Transmitter 4.0 kW | $225,000.00 | $225,000.00 | See Budget Justification: AUXILIARY TRANSMITTER SITE. | N/A | N/A |
Studio-Transmitter-Link | $100,000.00 | $100,000.00 | Microwave or fiber connectivity to get programming from the studio to the interim transmitter site. | N/A | N/A |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | $14,000.00 | $14,000.00 | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | N/A | N/A |
Interim Transmitter ULXTE-72 | $1,587,000.00 | $1,514,000.00 | $0.00 | ||
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,400,000.00 | N/A | N/A | N/A |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | $14,000.00 | $14,000.00 | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | N/A | N/A |
Studio-Transmitter-Link | $100,000.00 | $100,000.00 | Microwave or fiber connectivity to get programming from the studio to the interim transmitter site. | N/A | N/A |
Primary Transmitter ULXTE-6 | $2,252,655.00 | $2,241,988.00 | $0.00 | ||
UHF - Liquid Cooled Solid State Transmitter 4.32 kW | $201,602.00 | $201,602.00 | N/A | N/A | N/A |
Rent Increase | $805,293.00 | $805,293.00 | Estimated increase on top of current building lease due to having to expand the building to accommodate large channel 14 filtering. | N/A | N/A |
RF Consulting Engineer | $5,260.00 | $65,000.00 | Additional services to design complex filtering for Land Mobile Protection. See attached justification. | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $119,093.00 | N/A | N/A | N/A |
Filter Design | $5,000.00 | $5,000.00 | Anticipated expense in the design of Mask and notch filtering to reduce interference to into Land Mobile stations. | N/A | N/A |
Other -- Building Addition Size: 2000.0 | $1,027,000.00 | $1,027,000.00 | See attached Budget Justification: TRANSMITTER BUILDING | N/A | N/A |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | $14,000.00 | $14,000.00 | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | N/A | N/A |
Notch Filter Install | $5,000.00 | $5,000.00 | Installation of additional notch filtering to protect Land Mobile stations. | N/A | N/A |
Auxiliary Transmitter ULXTE-20 | $1,099,000.00 | $971,775.00 | $0.00 | ||
Channel 14 Mask Filter | $189,500.00 | $119,093.00 | N/A | N/A | N/A |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | $14,000.00 | $14,000.00 | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | N/A | N/A |
Other -- Building Addition Size: 900.0 | $396,000.00 | $396,000.00 | See attached Budget Justification: AUXILIARY TRANSMITTER SITE | N/A | N/A |
Notch Filter Install | $5,000.00 | $5,000.00 | Installation of Land Mobile notch filters. | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $437,682.00 | N/A | N/A | N/A |
Auxiliary Transmitter ULXTE-6 | $415,102.00 | $344,695.00 | $0.00 | ||
Notch Filter Install | $5,000.00 | $5,000.00 | Installation of additional notch filtering to protect Land Mobile stations. | N/A | N/A |
Filter Design | $5,000.00 | $5,000.00 | Anticipated expense in the design of Mask and notch filtering to reduce interference to into Land Mobile stations. | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $119,093.00 | N/A | $0.00 | N/A |
Other Electrical Service: Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | $14,000.00 | $14,000.00 | Electrical contractor to connect transmitter into existing electrical panel and wire heat exchanger into transmitter. Includes material and labor. | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 4.32 kW | $201,602.00 | $201,602.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $946,870.00 | $1,061,768.00 | N/A | $0.00 | N/A |
Total for all systems | $48,357,109.00 | $48,050,047.50 | N/A | $0.00 | N/A |
Primary Antenna TUP-04-12-2 | $590,930.00 | $630,000.00 | $0.00 | ||
New combiner, cost per channel (without antenna) | $84,200.00 | $125,000.00 | WETA Share of a 3 channel combiner. See attached Budget Justification: COMBINER as to the overage from catalog cost per station. | N/A | N/A |
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | $500,000.00 | $500,000.00 | See attached Budge Justification: ANTENNA. Antenna performance poor on channel 14. Replacement is anticipated. | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $5,000.00 | N/A | N/A | N/A |
Auxiliary Antenna TUA-O4-8/32H-1-R SM | $355,940.00 | $431,768.00 | $0.00 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $21,750.00 | N/A | N/A | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $10,298.00 | N/A | N/A | N/A |
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 30 horizontally polarized | $222,900.00 | $222,900.00 | See attached Budget Justification: AUXILIARY TRANSMITTER SITE | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $165,420.00 | WETA Share of a 3 channel combiner. See attached Budget Justification: AUXILIARY TRANSMITTER SITE as to the slight overage from catalog. | N/A | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $120,872.00 | $99,991.50 | N/A | $0.00 | N/A |
Total for all systems | $48,357,109.00 | $48,050,047.50 | N/A | $0.00 | N/A |
Auxiliary Transmission Line | $120,872.00 | $99,991.50 | $0.00 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $120,872.00 | $99,991.50 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $688,400.00 | $477,000.00 | N/A | $0.00 | N/A |
Total for all systems | $48,357,109.00 | $48,050,047.50 | N/A | $0.00 | N/A |
Auxiliary Tower LTOWER | $254,800.00 | $192,000.00 | $0.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $100,000.00 | N/A | N/A | N/A |
Short Tower (less than 500') | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Primary Tower TOWER | $433,600.00 | $285,000.00 | $0.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $35,000.00 | Replacement of top mounted antenna will be difficult to rig. Further detailed structural engineering analysis is anticipated to examine rigging details and temporary load capacity of the tower. | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $250,000.00 | Top consists of 3 stacked antennas. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $622,865.00 | $718,850.00 | N/A | $0.00 | N/A |
Total for all systems | $48,357,109.00 | $48,050,047.50 | N/A | $0.00 | N/A |
Outside Professional Services | $622,865.00 | $718,850.00 | $0.00 | ||
Prepare and or review reimbursement form | $2,630.00 | $10,600.00 | This is a complex project and requires careful attention to detail in assembling. Substantial time has been placed into the preparation of the form with supporting justification for both main and auxiliary sites. | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $75,000.00 | Lease modifications negotiations for main antenna/combiner. Building permit applications and possible hearings. (50,000) For the auxiliary site applications and hearings for building expansion (25,000). | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $7,000.00 | The need for filing two STA's in a project of this magnitude is anticipated. | N/A | N/A |
Site Visits and Surveys | $9,000.00 | $9,000.00 | Site visits to establish what equipment is on premises, where new equipment will be located and do equipment inventory for both main and auxiliary sites. | N/A | N/A |
Project management of the transition | $331,800.00 | $315,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $11,000.00 | Coordination with 4 TV stations and 3 FM stations. Cut over must be carefully planned with other two stations. Contacting Land Mobile operators on cutover to ensure no interference by WETA | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $3,000.00 | Two STA's are anticipated, one for the main site and the other for the auxiliary. | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $100,000.00 | $80,000 for Main transmitter site and $20,000 for auxiliary site. | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $14,000.00 | Extensive study has already been given to searching for a new channel and Land Mobile interference and remediation. | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $3,000.00 | Time required will be similar to that required of the main site to prepare this application. | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Progress Reporting | $14,000.00 | $14,000.00 | Prepare and file 7 required progress reports on FCC Form 2100, Schedule 387 on a quarterly basis with the FCC. | N/A | N/A |
Ch. 14 Field measurments | $120,000.00 | $120,000.00 | Measurements specifically related to channel 14 interference to Land Mobile facilities from both main and auxiliary sites. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $40,285,345.00 | $40,280,980.00 | N/A | $0.00 | N/A |
Total for all systems | $48,357,109.00 | $48,050,047.50 | N/A | $0.00 | N/A |
Other Expenses | $40,285,345.00 | $40,280,980.00 | $0.00 | ||
Develop and air announcement of upcoming channel change | $7,500.00 | $7,500.00 | Costs for production and airtime of channel change announcements. | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $7,000.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | Some disposal costs are anticipated for old equipment removed from service. This modest amount is proposed for such disposal. | N/A | N/A |
Equipment Delivery and Handling Charges | $23,100.00 | $23,100.00 | Estimated freight charges for multiple transmitters and auxiliary antenna not included in quotations for equipment from vendors. | N/A | N/A |
Equipment Storage | $10,000.00 | $10,000.00 | See attached Budget Justification: FEES AND MISCELLANEOUS EXPENSES | N/A | N/A |
MVPD Notification of Channel Change | $7,000.00 | $7,000.00 | Estimated cost of using outside firm to contact MVPD's regarding channel change to repack channel. | N/A | N/A |
Land Mobile Remediation 1 | $8,000,000.00 | $8,000,000.00 | See Budget Justification: LAND MOBILE | N/A | N/A |
Land Mobile Remediation 2 | $8,000,000.00 | $8,000,000.00 | See Budget Justification: LAND MOBILE | N/A | N/A |
Land Mobile Remediation 3 | $8,000,000.00 | $8,000,000.00 | See Budget Justification: LAND MOBILE | N/A | N/A |
Land Mobile Remediation 4 | $8,000,000.00 | $8,000,000.00 | See Budget Justification: LAND MOBILE | N/A | N/A |
Land Mobile Remediation 5 | $8,000,000.00 | $8,000,000.00 | See Budget Justification: LAND MOBILE | N/A | N/A |
Additional Legal Expenses | $200,000.00 | $200,000.00 | Additional legal expenses for public TV station with complex main and interim tower site, unable to construct issues and land mobile remediation issues. | N/A | N/A |
Non-zoning permits | $25,000.00 | $25,000.00 | Estimate of building permit costs to modify building of main and auxiliary transmitter sites. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $380.00 | Anticipate needing to file two STA's in a project this complex. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $48,357,109.00 | $48,050,047.50 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lisa Lindstrom Delaney Senior Vice President and General Counsel 07/13/2017 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | na (Estimated cost filing only) na (Estimated cost filing only) na (Estimated cost filing only) 07/12/2017 |