Facility ID:
74197
Service:
DTV
Call Sign:
WWOR-TV
Channel:
25 (UHF)
File Number:
0000027542
FRN:
0005795067
Date Submitted:
07/10/2017

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

FOX TELEVISION STATIONS, LLC

Joseph M. Di Scipio

400 N. Capitol Street, NW

Suite 890

WASHINGTON, DC 20001

United States

+1 (202) 824-6522 JDISCIPIO@21CF.COM Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Dennis Wallace

Managing Partner

Meintel, Sgrignoli, & Wallace, LLC

Dennis Wallace

1282 Smallwood Drive

Suite 372

Waldorf, MD 20603

United States

+1 (202) 251-7589 Dennis.Wallace@mswdtv.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan WWOR will install interim facilities, remove existing antennas, transmission line, and transmitters and replace them. NJ Aux site will require new transmitter and combiner. Empire State Building Site requires very serious structural modifications.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Licensed Aux West Orange NJ
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DTT10SKU
Year 2011
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 10 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9EVO-8
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 10 kW
Justification for New Transmitter Existing transmitter is obsolete and no longer supported by its manufacturer which is no longer in business. Replacement transmitter required.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 400.0 feet
Other Electrical Service Yes
Description Aux Transmitter Electrical Installation West Orange NJ
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 500.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Remote Control Wiring

Wire up existing remote control to new transmitter

Remove Existing Equipment

Removal of existing equipment

Installation Plan and Drawings

Develop installation layout and drawings

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DTT15KSU
Year 2011
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 15 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9EVO-12
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 15 kW
Justification for New Transmitter Main transmitter is obsolete and no longer supported by its manufacturer. The manufacturer is no longer in business. A replacement transmitter is required.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 400.0 feet
Other Electrical Service Yes
Description Main Transmitter Electrical Installation at Empire State Building. Local 3 Installation
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 25 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 1000.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Wire Remote Control

Wire up existing remote control to new transmitter.

Installation Layout Drawings

Prepare Installation layout and installation drawings

Remove existing equipment

Removal of existing equipment

Empire State Building Fees

Empire State Building Fees for Main Transmitter

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model THU9EVO-12
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 15 kW
Justification for New Transmitter Interim transmitter required while existing facilities at Empire State Building are modified.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 200.0 feet
Other Electrical Service Yes
Description Interim Transmitter Electrical Installation at Empire State Building - Local 3
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 25 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 500.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? Yes

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Remove existing equipment

Remove existing equipment in interim transmitter area

Installation Layout and Drawings

Develop installation layout and drawings

Empire State Building Fees Interim

Interim transmitter location Empire State Building Fees

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Licensed Aux West Orange NJ
Ownership Leased
Owner American Tower
Site N/A
Is this antenna currently shared with any other stations? Yes
Is this antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Broadband
ERP: 338.0 kW
Manufacturer Dielectric
Model TUD-C5SP-10/34U-2-B
Year 2012

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
22206 WNYW
73333 WNJU
9610 WCBS-TV

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 5
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
35
25
26
27
36

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

American Tower Fees

American Tower Fees associated with modification of West Orange NJ Aux Facility

Optimization of Antenna

Optimization of antenna and line for new channels

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Empire State Building Aux Antenna
Ownership Leased
Owner Empire State Building
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Composite Antenna ESB Special
ERP: 182.0 kW
Manufacturer
Model ESBTUA80
Year 2011

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Licensed ESB Site Aux Antenna
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Leased
Owner Empire State Building
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Other
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type Custom Broadband ESB Special
ERP: 182.0 kW
Manufacturer
Model ESBTBD
Year 2018
Justification for New Antenna Replacement of existing Aux antenna may be required as changes to structure and station combiner necessitate antenna changes.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? Yes
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
26
25
27

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Empire State Building Fees

Empire State Building Fees associated with Aux Antenna

Custom Antenna Design

Custom Antenna design for ESB Aux Antenna

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Composite Antenna - Special ESB
ERP: 170.0 kW
Manufacturer
Model ESBTUF80
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 130.0 kW
Manufacturer
Model ATW14H4-ETO25/26H
Year 2018
Justification for New Antenna Existing antenna will not be functional for new channel. Antenna requires replacement.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Empire State Building Fees

Empire State Building Fees associated with new antenna

Antenna Stack Design

Complex 3 antenna stack design and development of mechanicals

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Licensed West Orange NJ Aux Site
Ownership Leased
Owner American Tower
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 2
Length 400 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
22206 WNYW
73333 WNJU
9610 WCBS-TV

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Optimization RF Sweep

RF Sweep and Optimization of line for new channels. Install Matchers

American Tower Fees

American Tower Fees associated with modification of site for new channels

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Licensed ESB Aux
Ownership Leased
Owner Empire State Building
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 400 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
47535 WNBC
9610 WCBS-TV

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Licensed ESB Aux
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 400 feet per run
Justification for New Transmission Line Change in aux antenna, combiner, and station configurations requires the replacement of this aux antenna transmission line.

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Empire State Building Fees

Empire State Building Fees related to Aux Line

Transmission Line Layout and Install Drawings

Transmission Line Layout and installation drawings

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 2
Length 400 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 2
Length 400 feet per run
Justification for New Transmission Line Replacement of transmission line required due to modifications of the ESB Mast, Antennas, and structure. Transmission line will require replacement.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Empire State Building Fees

Empire State Building Fees associated with new transmission line

Layout and Installation Drawings

Develop transmission line layouts and prepare installation drawings

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use Licensed Aux Empire State Building
Ownership Leased
Is this tower consider Complex? Located on Building
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1007048
Coordinates (NAD83) Latitude (NAD83) 40° 44' 54.0" N-
Longitude (NAD83) 073° 59' 09.0" W-
Overall Structure Height 1453.39 feet
Support Structure Height 1249.98 feet
Ground Elevation Above Mean Sea Level (AMSL) 50.85 feet
Structure Type B - Building
Tower Owner EMPIRE STATE BUILDING COMPANY
Date Constructed 01/01/1931

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
22206 WNYW DTV
60555 WFUT-DT DTV

Other Types of Users

Users
See Main List

Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: No study needed
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Located on Building
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Empire State Building Fees for Aux Antenna Structural

Empire State Building Fees for Aux Antenna Structural Mods

Auxiliary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use West Orange NJ Aux Site
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1060205
Coordinates (NAD83) Latitude (NAD83) 40° 48' 07.6" N-
Longitude (NAD83) 074° 14' 45.5" W-
Overall Structure Height 339.89 feet
Support Structure Height 299.87 feet
Ground Elevation Above Mean Sea Level (AMSL) 622.04 feet
Structure Type LTOWER - Lattice Tower
Tower Owner American Tower, LLC
Date Constructed 01/01/1974

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
22206 WNYW DTV
60555 WFUT-DT DTV
73333 WNJU DTV
47535 WNBC DTV
9610 WCBS-TV DTV
73881 WPIX DTV

Other Types of Users

Users
Multi User Site

Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

American Tower Fees Associated with Modificatins

American Tower Fees associated with modification of site.

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Located on Building
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1007048
Coordinates (NAD83) Latitude (NAD83) 40° 44' 54.0" N-
Longitude (NAD83) 073° 59' 09.0" W-
Overall Structure Height 1453.39 feet
Support Structure Height 1249.98 feet
Ground Elevation Above Mean Sea Level (AMSL) 50.85 feet
Structure Type B - Building
Tower Owner EMPIRE STATE BUILDING COMPANY
Date Constructed 01/01/1931

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
25442 WNEW-FM FM
6595 WKTU FM
9611 WCBS-FM FM
22206 WNYW DTV
73881 WPIX DTV
1328 WABC-TV DTV
29022 WXNY-FM FM
46978 WQXR-FM FM
56571 WLTW FM
67846 WFAN-FM FM
73333 WNJU DTV
73887 WPLJ FM
59953 WHTZ FM
73355 WNYC-FM FM
6373 WWPR-FM FM
23004 WAXQ FM
63781 WEPN-FM FM
73356 WPXN-TV DTV
18795 WNET DTV
28203 WBLS FM
47535 WNBC DTV
51249 WBAI FM
74215 WXTV-DT DTV
60555 WFUT-DT DTV
19615 WQHT FM
9610 WCBS-TV DTV

Other Types of Users

Users
Multi User Site

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Located on Building
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Empire State Building Structural Modifications 1

Empire State Building Structural Modifications for new antennas and REV. G Part 1

Empire State Building Structural Modifications 2

Empire State Building Structural Modifications for new antennas and REV. G Part 3

Empire State Building Structural Modifications 3

Empire State Building Structural Modifications for new antennas and REV. G Part 2

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 2500
Explanation Outside project management of ESB and West Orange NJ site projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 30
Justification Supervision of project at Empire State Building - Supervise Local 3 labor.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Prepare and File FCC Progress Reports

Prepare and file FCC Progress Reports

Reimbursement Reviews with FCC Contractor

Review reimbursements with FCC Contractor and Technical Consultants

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

New York Sales Tax

Estimated New York Sales tax on equipment purchases.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $4,957,100.00 $5,318,500.00 N/A $0.00 N/A
Total for all systems $35,545,009.00 $41,896,999.00 N/A $0.00 N/A
Interim Transmitter THU9EVO-12 $2,008,400.00 $2,270,000.00 $0.00
Switchgear - industrial 800 amp $38,200.00 $165,000.00 Empire State Building Electrical - Local 3 N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $10,400.00 $65,000.00 Empire State Building Electrical - Local 3 N/A N/A
Other Electrical Service: Interim Transmitter Electrical Installation at Empire State Building - Local 3 $180,000.00 $180,000.00 Empire State Building Electrical - Local 3 N/A N/A
Empire State Building Fees Interim $300,000.00 $300,000.00 Empire State Building Fees for Interim Transmitter N/A N/A
Other -- Building Addition Size: 500.0 $175,000.00 $175,000.00 Empire State Building transmitter room modifications. NYC Labor N/A N/A
Remove existing equipment $225,000.00 $225,000.00 Removal of existing equipment from interim transmitter space. NYC Labor, Elevator Considerations, ESB Loading Dock, Etc. N/A N/A
UHF inside RF system including switching $147,500.00 $140,000.00 Catalog N/A N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $650,000.00 Catalog N/A N/A
25 Ton system $91,500.00 $165,000.00 ESB Mechanicals. Pipefitters, Fire Protection, HVAC Mods. NYC Labor N/A N/A
Installation Layout and Drawings $120,000.00 $120,000.00 Installation Layout and development of installation drawings. N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $85,000.00 Empire State Building Electrical - Local 3 N/A N/A
Primary Transmitter THU9EVO-12 $2,158,100.00 $2,270,000.00 $0.00
Other -- Building Addition Size: 1000.0 $325,000.00 $325,000.00 Empire State Building - Transmitter Room Modifications. NYC Labor N/A N/A
Wire Remote Control $5,000.00 $5,000.00 Wire up existing remote control to new transmitter. N/A N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $650,000.00 Catalog N/A N/A
Installation Layout Drawings $125,000.00 $125,000.00 Transmitter installation layout and installation drawing development N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $65,000.00 Empire State Building Electrical - Local 3 N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $20,800.00 $65,000.00 Empire State Building Electrical - Local 3 N/A N/A
Remove existing equipment $225,000.00 $225,000.00 Remove existing equipment from transmitter area. NYC Labor - Elevator Logistics, Loading Dock, Teamsters, Rigging, N/A N/A
Empire State Building Fees $450,000.00 $450,000.00 Empire State Building Fees associated with new main transmitter installation N/A N/A
25 Ton system $91,500.00 $165,000.00 Empire State Building Mechanicals - pipefitters, fire protection, HVAC N/A N/A
Other Electrical Service: Main Transmitter Electrical Installation at Empire State Building. Local 3 Installation $195,000.00 $195,000.00 Empire State Building Electrical - Local 3 N/A N/A
Auxiliary Transmitter THU9EVO-8 $790,600.00 $778,500.00 $0.00
Other -- Building Addition Size: 500.0 $25,000.00 $25,000.00 Transmitter room modifications. West Orange NJ Site - NJ Labor N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 Catalog N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $20,800.00 $35,000.00 West Orange NJ Site - NJ Labor N/A N/A
Other Electrical Service: Aux Transmitter Electrical Installation West Orange NJ $90,000.00 $90,000.00 West Orange NJ Site - NJ Labor N/A N/A
Remove Existing Equipment $45,000.00 $45,000.00 West Orange NJ Site - NJ Labor N/A N/A
Installation Plan and Drawings $75,000.00 $75,000.00 Hanson Develop installation drawings and site layout N/A N/A
Remote Control Wiring $3,500.00 $3,500.00 Wire Up remote control to new transmitter N/A N/A
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW $494,500.00 $470,000.00 Catalog N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,223,460.00 $3,554,400.00 N/A $0.00 N/A
Total for all systems $35,545,009.00 $41,896,999.00 N/A $0.00 N/A
Primary Antenna ATW14H4-ETO25/26H $798,790.00 $1,960,000.00 $0.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $1,300,000.00 Special Custom built antenna for three antenna stack on top of Empire State Building. N/A N/A
Sweep test of existing antenna $6,730.00 $45,000.00 RF Sweep and optimization of antenna/ transmission line at ESB. Using Local 3 labor. N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $95,000.00 Custom ESB Elbow complexes. Three antenna stack. Top of ESB Building. N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $35,000.00 Custom analysis of mast and antenna stack. N/A N/A
Empire State Building Fees $450,000.00 $450,000.00 Empire State Building Fees associated with new main antenna. N/A N/A
Antenna Stack Design $35,000.00 $35,000.00 Custom Antenna Stack Design and pattern development. N/A N/A
Auxiliary Antenna ESBTBD $994,040.00 $1,175,000.00 $0.00
UHF - High Power Top Mount One Station antenna elliptically or circularly polarized $350,000.00 $350,000.00 Custom designed ESB Aux Antenna - Composite Antenna Design N/A N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $25,000.00 Custom Elbow Complex ESB Aux Antenna system N/A N/A
Sweep test of existing antenna $6,730.00 $25,000.00 Custom Antenna RF Sweep and Optimization. Local 3 labor. N/A N/A
Empire State Building Fees $350,000.00 $350,000.00 Empire State Building Fees associated with Aux antenna project. N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $95,000.00 Custom brackets for antenna mounting to mooring mast at ESB N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $25,000.00 Custom Scatter Study ESB Mast N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $150,000.00 Custom Combiner System and Installation at ESB N/A N/A
Custom Antenna Design $35,000.00 $35,000.00 Custom design of composite Aux Antenna for ESB N/A N/A
Combiner output splitting/switching for dual feed lines, if applicable $126,000.00 $120,000.00 Catalog N/A N/A
Auxiliary Antenna TUD-C5SP-10/34U-2-B $430,630.00 $419,400.00 $0.00
Sweep test of existing antenna $6,730.00 $6,400.00 Catalog - document existing performance on new channels. Determine optimization N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $80,000.00 Catalog N/A N/A
Optimization of Antenna $0.00 $0.00 N/A N/A N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $13,000.00 Catalog N/A N/A
UHF - High Power Top Mount One Station antenna horizontally polarized $50,000.00 $50,000.00 Optimization and fine matcher for existing antenna. N/A N/A
Combiner output splitting/switching for dual feed lines, if applicable $126,000.00 $120,000.00 Catalog N/A N/A
American Tower Fees $150,000.00 $150,000.00 American Tower Fees associated with Aux Site modifications N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,149,400.00 $1,670,000.00 N/A $0.00 N/A
Total for all systems $35,545,009.00 $41,896,999.00 N/A $0.00 N/A
Primary Transmission Line $576,600.00 $910,000.00 $0.00
Rigid Transmission Line - copper, 6 1/8" $161,600.00 $495,000.00 Custom Transmission line lengths fabricated off site. installed by local 3 N/A N/A
Empire State Building Fees $250,000.00 $250,000.00 ESB fees associated with new main transmission line. N/A N/A
Layout and Installation Drawings $165,000.00 $165,000.00 Layout transmission line, develop installation drawings, line length segments, hanger details. N/A N/A
Auxiliary Transmission Line $387,800.00 $575,000.00 $0.00
Empire State Building Fees $160,000.00 $160,000.00 Empire State Building Fees associated with new Aux antenna transmission line N/A N/A
Transmission Line Layout and Install Drawings $135,000.00 $135,000.00 Layout aux transmission line installation details, develop line cut list, hanger details. N/A N/A
Rigid Transmission Line - copper, 6 1/8" broadband $92,800.00 $280,000.00 Custom transmission line lengths fabricated off site. installed by local 3 N/A N/A
Auxiliary Transmission Line $185,000.00 $185,000.00 $0.00
American Tower Fees $150,000.00 $150,000.00 American Tower Fees associated with modifications of transmission line for new channels N/A N/A
Optimization RF Sweep $35,000.00 $35,000.00 Optimize for new channels N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $24,744,114.00 $28,867,314.00 N/A $0.00 N/A
Total for all systems $35,545,009.00 $41,896,999.00 N/A $0.00 N/A
Primary Tower B $23,603,314.00 $26,660,314.00 $0.00
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $300,000.00 ESB Structural Inspections N/A N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $750,000.00 ESB Rigging Costs N/A N/A
Empire State Building Structural Modifications 3 $4,110,314.00 $4,110,314.00 Empire State Building Structural Modifications. WWOR Allocated cost estimate is total of $21,110,314. of total project cost of ~ $68M. Form will not allow total costs - so broken into three line items. Part 3 N/A N/A
Empire State Building Structural Modifications 1 $9,000,000.00 $9,000,000.00 Empire State Building Structural Modifications. WWOR Allocated cost estimate is total of $21,110,314. of total project cost of ~ $68M. Form will not allow total costs - so broken into three line items. Part 1 N/A N/A
Empire State Building Structural Modifications 2 $9,000,000.00 $9,000,000.00 Empire State Building Structural Modifications. WWOR Allocated cost estimate is total of $21,110,314. of total project cost of ~ $68M. Form will not allow total costs - so broken into three line items. Part 2 N/A N/A
Serious tower reinforcement/modifications $1,052,000.00 $3,500,000.00 ESB Stack Antenna Installation Estimate N/A N/A
Auxiliary Tower LTOWER $429,800.00 $417,000.00 $0.00
Short Tower (less than 500') $84,200.00 $80,000.00 Catalog N/A N/A
American Tower Fees Associated with Modificatins $175,000.00 $175,000.00 American Tower Fees Associated with tower modifications. N/A N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A N/A N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 Catalog - West Orange NJ N/A N/A
Auxiliary Tower B $711,000.00 $1,790,000.00 $0.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $1,500,000.00 Aux Antenna Rigging Empire State Building N/A N/A
Empire State Building Fees for Aux Antenna Structural $290,000.00 $290,000.00 Empire State Building Fees for Aux Antenna Structural N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $661,245.00 $677,700.00 N/A $0.00 N/A
Total for all systems $35,545,009.00 $41,896,999.00 N/A $0.00 N/A
Outside Professional Services $661,245.00 $677,700.00 $0.00
Reimbursement Reviews with FCC Contractor $34,450.00 $34,450.00 Reimbursement Reviews with E&Y and Cavell. N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 Catalog N/A N/A
Project management of the transition $395,000.00 $375,000.00 Project Management of Main and Aux sites. N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 Catalog N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,000.00 Catalog N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 Catalog N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $5,000.00 NYC market Coordination of testing phase and transition phase operations. N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $21,000.00 Development of custom antenna configuration for WWOR. Antenna design ESB Criteria. Three Antenna Stack N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $4,000.00 Two Aux facilities N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $3,000.00 Two Aux Facilities N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 Catalog N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $8,000.00 Two Aux facilities N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 Catalog N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $25,000.00 Negotiate modification of ESB Lease for new channels and equipment N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 Catalog N/A N/A
RF Exposure Measurements $21,050.00 $20,000.00 Catalog N/A N/A
Additional Field Engineering Service, 30 Days $54,000.00 $54,000.00 On Site Engineering Supervision of Local 3 installation labor. N/A N/A
Prepare and File FCC Progress Reports $24,000.00 $24,000.00 Prepare and file FCC Progress Reports N/A N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,000.00 Catalog N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,809,690.00 $1,809,085.00 N/A $0.00 N/A
Total for all systems $35,545,009.00 $41,896,999.00 N/A $0.00 N/A
Other Expenses $1,809,690.00 $1,809,085.00 $0.00
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $180,000.00 $180,000.00 Disposal of equipment. NYC Labor, Rigging, Teamsters, Porters. N/A N/A
Local Zoning $75,000.00 $75,000.00 Empire State Building - New York City Dept. of Buildings. N/A N/A
Non-zoning permits $165,000.00 $165,000.00 Mechanical permits. N/A N/A
Equipment Storage $150,000.00 $150,000.00 Off Site Equipment Staging and Storage until needed on site. N/A N/A
MVPD Notification of Channel Change $11,000.00 $11,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $275,000.00 $275,000.00 Staging Equipment Deliveries to ESB Loading Dock Teamsters, Elevator Logistics, Rigging. Night/Weekend work N/A N/A
New York Sales Tax $939,000.00 $939,000.00 Estimated New York Sales Tax on equipment. N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 Catalog N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 Catalog N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 Catalog N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 Catalog N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $35,545,009.00 $41,896,999.00 $0.00

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Joseph M. Di Scipio

SVP, Legal and FCC Compliance


07/10/2017

Attachments