Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
EAGLE BROADCASTING GROUP, INC. Doing Business As: EAGLE BROADCASTING GROUP, INC. |
Charles E. Jones 227E. Main St Jackson, OH 45640 United States |
+1 (740) 285-2813 | WTZPproject@gmail.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony Zummallen Preparer Contact Representative QCommunications, LLC |
Tony Zummallen 705B SE Melody Lane #314 Lee's Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@Qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WTZP will purchase a new antenna, feedline and transmitter to replace temporary equipment now in use due to the displacement deadline. The project includes a tower study and all actions required to meet the current Ohio Building Code tower standards. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DTXPRO1200U | |
Year | 1990 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAX-OP-1400 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2 kW | |
Justification for New Transmitter | Re-tuning the existing main transmitter is not an option because Pineapple Technology is no longer in business.. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Refurbished parapanel | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | RYMSBP24DR | |
Year | 1999 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-8E | |
Year | 2022 | |
Justification for New Antenna | The old parapanel is a single-channel antenna and thus is unsuitable for continuing operations on the replacement channel. WTZP-LD has begun interim operations on the new channel at reduced power using a borrowed antenna, ANT Model ATS1x1. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Installation of new antenna and feedline |
Installation cost quoted separately from cost to rig tower and remove abandoned TV antenna and 6' feedline to bring tower within current standards. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 450 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 1000 feet per run | |
Justification for New Transmission Line | Existing line had been abandoned on tower by unknown previous user, had been spliced. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
Hardware |
Hangers, hoist grip, grip hanger kit adapters, flanges, connectors, other associated items for installation |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1027116 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 45' 42.0" N- |
Longitude (NAD83) | 083° 03' 41.0" W- | |
Overall Structure Height | 940.61 feet | |
Support Structure Height | 899.27 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1103.00 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | The Ohio State University | |
Date Constructed | 06/01/1992 |
Facility ID | Call Sign | Service |
---|---|---|
66187 | WOSP | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Analysis and Mapping |
Structural Analysis and Mapping |
Feasibility Study |
Feasibility Study |
Top Mount Pole |
Plan is to remove abandoned top-mount TV antenna & feedline to help bring tower within building codes. Pole to maintain height per owner. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 475 | |
Explanation | Project Management firm will be hired once funding awarded. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
General Engineering - Repack |
Consulting Engineering |
Attorney fees- Repack General |
Attorney fees for work performed not anticipated prior to repack |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Tree Clearing |
Tree clearing to prepare for Geotechnical Survey and Foundation Mapping |
Filing Fees - STA |
FCC Filing fees for STA |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $94,000.00 | $45,707.98 | N/A | $35,707.98 | N/A |
Total for all systems | $928,961.67 | $832,811.61 | N/A | $236,338.01 | N/A |
Primary Transmitter UAX-OP-1400 | $94,000.00 | $45,707.98 | $35,707.98 | ||
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $35,707.98 | Old transmitter cannot be used for the new channel. | $35,707.98 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | Request to cover installation of transmitter and all ground components. | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Transmitter Building Site Survey/Installation | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $76,868.25 | $73,945.75 | N/A | $13,215.75 | N/A |
Total for all systems | $928,961.67 | $832,811.61 | N/A | $236,338.01 | N/A |
Primary Antenna TLP-8E | $76,868.25 | $73,945.75 | $13,215.75 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $11,513.25 | $11,513.25 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Per Dielectric quote. Old antenna not frequency agile. Temp antenna was intended for emergency use only; will not replicate coverage. Use of 8-bay antenna vs 12/16-bay pla | $11,513.25 | Same as actual |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $0.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $1,702.50 | N/A | $1,702.50 | N/A |
Installation of new antenna and feedline | $55,000.00 | $55,000.00 | In addition to rigging tower to remove abandoned equipment to reduce weight and help bring tower within current standards. May decrease if antenna installed as proposed at top of tower during installation of pole. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | |
Sweep test of transmission line and antenna | |
Side Mount antenna brackets | |
Installation of new antenna and feedline | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,000.00 | $17,959.00 | N/A | $13,959.00 | N/A |
Total for all systems | $928,961.67 | $832,811.61 | N/A | $236,338.01 | N/A |
Primary Transmission Line | $28,000.00 | $17,959.00 | $13,959.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $24,000.00 | $13,959.00 | Existing line had been previously abandoned on the tower before returned to use for WTZP. It has been damaged and repaired, but shows a greater line loss and lower efficiency than would be predicted for this type of line. | $13,959.00 | N/A |
Hardware | $4,000.00 | $4,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" | |
Hardware | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $525,055.44 | $516,778.40 | N/A | $37,828.40 | N/A |
Total for all systems | $928,961.67 | $832,811.61 | N/A | $236,338.01 | N/A |
Primary Tower GTOWER | $525,055.44 | $516,778.40 | $37,828.40 | ||
Feasibility Study | $1,206.56 | $1,206.56 | Per ERI proposal. Credit given on proposal for Reinforcing Analysis #38496B. Includes sales tax | $1,206.56 | N/A |
Structural Analysis and Mapping | $15,098.88 | $15,098.88 | Cost determined from invoices. | $15,098.88 | Estimated same as actual |
Top Mount Pole | $30,000.00 | $30,000.00 | 41' top mount pole and top plate costs to maintain tower height. | N/A | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $155,000.00 | Vendor estimate for rigging tower for removal of old antennas and feedlines and preparation for installation of new equipment. Includes installation of new top pole (reusing beacon), | $6,050.00 | N/A |
Major tower reinforcement/modifications | $300,000.00 | $300,000.00 | Anticipating tower analysis will indicate major tower reinforcement required to meet current 2017 Ohio Building Code (2015 IBC) and ANSI/TIA 222-G requirements | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $15,472.96 | Cost determined from submitted quote. | $15,472.96 | N/A |
Actual Information Description | File Name |
---|---|
Feasibility Study | |
Structural Analysis and Mapping | |
Top Mount Pole | Information not provided. |
Tower Rigging Tall Tower (greater than 500') | |
Major tower reinforcement/modifications | Information not provided. |
Tower mapping and report for structural engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $192,144.30 | $165,526.80 | N/A | $127,853.20 | N/A |
Total for all systems | $928,961.67 | $832,811.61 | N/A | $236,338.01 | N/A |
Outside Professional Services | $192,144.30 | $165,526.80 | $127,853.20 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,232.50 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $26,125.00 | N/A | $26,125.00 | N/A |
General Engineering - Repack | $12,780.00 | $12,780.00 | Per actual costs | $12,780.00 | N/A |
Form 399 assistance or other Program Management costs | $51,543.80 | $51,543.80 | Cost determined by invoices | $51,543.80 | Actual costs submitted |
Attorney fees- Repack General | $9,823.00 | $9,823.00 | Per actual costs | $9,823.00 | N/A |
Project management of the transition | $50,112.50 | $50,000.00 | Anticipating hiring TBA company to assume final project design, financial management and reimbursement contact role. | $27,581.40 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
General Engineering - Repack | |
Form 399 assistance or other Program Management costs | |
Attorney fees- Repack General | |
Project management of the transition | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,893.68 | $12,893.68 | N/A | $7,773.68 | N/A |
Total for all systems | $928,961.67 | $832,811.61 | N/A | $236,338.01 | N/A |
Other Expenses | $12,893.68 | $12,893.68 | $7,773.68 | ||
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $4,500.00 | $4,500.00 | N/A | $3,825.00 | N/A |
Tree Clearing | $3,678.68 | $3,678.68 | Tree clearing necessary to perform the Geotechnical Survey and Foundation Mapping work | $3,678.68 | N/A |
Filing Fees - STA | $270.00 | $270.00 | Per actual costs | $270.00 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Equipment Delivery and Handling Charges | |
Tree Clearing | |
Filing Fees - STA |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $928,961.67 | $832,811.61 | $236,338.01 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Charles Jones Owner 04/18/2023 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Charles Jones Owner 04/18/2023 |