Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UHF TV ASSOCIATION Applicant Doing Business As: UHF TV ASSOCIATION |
PO Box 187 Tucumcari, NM 88401 United States |
+1 (806) 331-9852 | telegram.zach@gmail.com | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen Anywave Communication Technologies |
Tony zumMallen 300 Knightsbridge Parkway, Suite 150 Lincolnshire, IL 60069 United States |
+1 (816) 882-5600 | tony.zummallen@anywavecom.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Replace transmitter per channel reassignment project. Replace line and antenna per channel reassignment project which is shared with 3 other stations listed above. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 30 Watts | |
Year | 2007 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 30 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-200-D-FB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 200 W | |
Justification for New Transmitter | New channel requires new combiner with sharper tuning, resulting in more loss. Larger transmitter required to overcome that loss. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Shipping |
Transmitter Shipping charges |
Decommission |
Deinstall and disconnect old transmitter |
Site Prep |
Prepare site for installation of new transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 0.61 kW | |
Manufacturer | ||
Model | SL-8 | |
Year | 2007 |
Facility ID | Call Sign |
---|---|
68704 | K38FP-D |
68702 | K50CX-D |
68703 | K46BU-D |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | SL-8 | |
Year | 2019 | |
Justification for New Antenna | Original antenna cannot support new channels |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 4 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 512.0 MHz - 548.0 MHz | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Combiner Shipping fees |
Shipping fees for combiner |
Antenna Shipping fees |
Shipping fees for antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 50 feet per run |
Facility ID | Call Sign |
---|---|
68703 | k46BU-D |
68702 | K50CX-D |
68704 | K38FP-D |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1/2 inches | |
Number of parallel runs | 1 | |
Length | 100 feet per run | |
Justification for New Transmission Line | RG-58 will not handle the power level of the transmitters combined as we have done in this project. The second is that on the antenna end on the line the connector is type-n and on the side for the combiner it is type n also. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
Shipping |
Shipping not included on quote |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 35° 08' 12.0" N- |
Longitude (NAD83) | 103° 41' 56.9" W- | |
Overall Structure Height | 39.00 feet | |
Support Structure Height | 36.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4744.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | UHF TV Association | |
Date Constructed | 01/01/1990 |
Facility ID | Call Sign | Service |
---|---|---|
68704 | K38FP-D | LPT |
68702 | K50CX-D | LPT |
68703 | K46BU-D | LPT |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 50 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the station's daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Engineering-General |
Engineering Consultation |
Attorney Fees |
Fees due to FCC repack |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $61,750.00 | $41,320.90 | N/A | $23,285.00 | N/A |
Total for all systems | $268,832.45 | $148,057.35 | N/A | $81,414.95 | N/A |
Primary Transmitter TRN-U-200-D-FB | $61,750.00 | $41,320.90 | $23,285.00 | ||
Site Prep | $4,000.00 | $4,000.00 | Estimated costs to prepare site to receive new transmitter. This includes receiving and inventory of transmitter and its components; pre-assembly of cabinets and subassemblies; and ensuring site has all materials necessary for installation crew. | N/A | N/A |
Decommission | $3,000.00 | $3,000.00 | Estimated costs to decommission, de-install and disconnect old transmitter in preparation for installation of new transmitter. | N/A | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | 4/3/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | $0.00 | N/A |
5 Ton system | $20,250.00 | $1,035.90 | Attached quote for $4143.61, shared equally between (4) stations. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | $24,300.00 | $23,085.00 | Per attached Anywave quote. | $23,085.00 | N/A |
Shipping | $200.00 | $200.00 | Estimated shipping costs for transmitter. Actual costs to be determined. | $200.00 | N/A |
Actual Information Description | File Name |
---|---|
Site Prep | Information not provided. |
Decommission | Information not provided. |
Transmitter Building Site Survey/Installation | Information not provided. |
5 Ton system | Information not provided. |
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts | |
Shipping |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,864.00 | $14,649.50 | N/A | $7,492.50 | N/A |
Total for all systems | $268,832.45 | $148,057.35 | N/A | $81,414.95 | N/A |
Primary Antenna SL-8 | $28,864.00 | $14,649.50 | $7,492.50 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 1.0kW input, Horizontal | $2,507.00 | $2,507.00 | Cost determined by invoice | $2,507.00 | N/A |
1 kW UHF Combiner (per channel) | $18,800.00 | $4,585.50 | Cost of combiner split between 4 stations | $4,585.50 | N/A |
Combiner Shipping fees | $100.00 | $100.00 | Estimated shipping fees for combiner (1/4 of total cost, per shared station). | $100.00 | N/A |
Antenna Shipping fees | $1,727.00 | $1,727.00 | Actual shipping fees for antenna (1/4 of total cost, per shared station). | $300.00 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 1.0kW input, Horizontal | |
1 kW UHF Combiner (per channel) | |
Combiner Shipping fees | |
Antenna Shipping fees |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $850.00 | $1,068.50 | N/A | $618.50 | N/A |
Total for all systems | $268,832.45 | $148,057.35 | N/A | $81,414.95 | N/A |
Primary Transmission Line | $850.00 | $1,068.50 | $618.50 | ||
Flexible Foam Transmission Line - dielectric, 1/2" | $350.00 | $568.50 | RG-58 will not handle the power level of the transmitters combined as we have done in this project. The second is that on the antenna end on the line the connector is type-n and on the side for the combiner it is type n also. | $568.50 | N/A |
Shipping | $500.00 | $500.00 | Cost of shipping | $50.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1/2" | |
Shipping |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $1,875.00 | N/A | $1,875.00 | N/A |
Total for all systems | $268,832.45 | $148,057.35 | N/A | $81,414.95 | N/A |
Primary Tower TOWER | $56,190.00 | $1,875.00 | $1,875.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $1,875.00 | Cost determined by invoices. | $1,875.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $104,468.45 | $72,433.45 | N/A | $48,143.95 | N/A |
Total for all systems | $268,832.45 | $148,057.35 | N/A | $81,414.95 | N/A |
Outside Professional Services | $104,468.45 | $72,433.45 | $48,143.95 | ||
Form 399 assistance or other Program Management costs | $26,379.70 | $26,379.70 | Cost determined by invoices. | $26,379.70 | Actual the same as estimated. |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $17,350.00 | Per-attached quote. | $17,350.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Engineering-General | $180.00 | $180.00 | Cost determined by invoices. | $180.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Project management of the transition | $5,275.00 | $7,700.00 | 50 hours at $154/hour. | $500.50 | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Per Anywave quote. | $2,500.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Attorney Fees | $1,233.75 | $1,233.75 | Cost determined by invoices. | $1,233.75 | N/A |
Actual Information Description | File Name |
---|---|
Form 399 assistance or other Program Management costs | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Engineering-General | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Project management of the transition | |
Prepare Form 601 | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Perform engineering study for displacement application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Attorney Fees |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $16,710.00 | $16,710.00 | N/A | $0.00 | N/A |
Total for all systems | $268,832.45 | $148,057.35 | N/A | $81,414.95 | N/A |
Other Expenses | $16,710.00 | $16,710.00 | $0.00 | ||
Equipment Storage | $5,000.00 | $5,000.00 | Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate 6-24 months of storage time. | N/A | N/A |
Equipment Delivery and Handling Charges | $2,500.00 | $2,500.00 | Transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | 4/3/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,500.00 | $2,500.00 | 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $268,832.45 | $148,057.35 | $81,414.95 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Zachary Davis Applicant 04/07/2023 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Zachary Davis Applicant 04/07/2023 |